Submits Rept of Failures & Challenges to PORVs & Safety Valves for 1992.One Pressurizer Safety Valve Failed Lift Pressure Setpoint Surveillance During 1992.On 920815,Unit 1 Valve 1-RV-200 Opened Below Tolerance Range
ML20034F492
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/26/1993
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9303030311
Download: ML20034F492 (2)


Text

-

I B A LTIMORE I

l GAS AND i ELECTRIC CALVERT CLIFFS NUCLEAR POWER PLANT 1650 CALVERT CLIFFS PARKWAY

  • LUSBY, MARYLAND 20657-4702 CHARLES H. CRUSE Februa 26,1993 PLANT GENERAL tAANAGER CALVERT Ci tT FS U. S. Nuclear Regulatory Commission Washington, DC 20555 ATENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant i

Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Annual Report of Failures and Challenges to PORVs and Safety Valves for 1

the Period of January 1.1992 throuch December 31,1997 i

l Gentlemen:

l 1

This report is submitted in accordance with Technical Specification 6.9.1.5.c.

The Technical Specification requires an annual report be submitted to the NRC detailing all challenges to, and failures of, the Power Operated Relief Valves (PORV) and Safety Valves.

l One Pressurizer Safety Valve failed its Lift Pressure Setpoint Surveillance during 1992. On August 15, during the performance of an ASME Boiler and Pressure Vessel Code (B&PV)

Section XI inspection,1-RV-200 (Unit 1) opened below the tolerance range of its required lift setting. Mechanical Maintenance Surveillance Test, M-2-1 " Pressurizer Safety Valves" requires the valve to lift within +/- 1Fo of its Technical Specification value. The valve, one of the two Unit 1 pressurizer safety valves, has a lift point o 2500 psia +/- 1Fo (2475 to 2525 psia). It lifted at r

2463 psia. Since 1-RV-200 failed its test, the ASME B&PV Code required the second pressurizer safety valve,1-RV-201, to be tested.1-RV-201 opened within its required tolerance range. The setpoint of 1-RV-200 was adjusted and the valve was tested satisfactorily.

Should you have any further questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, p.

(

,/ $1 l

CHC/REF/bjd 030045 9303030311 930226 PDR ADOCK 05000317

? I R

PDR l

a

,0 '/hhbbYW N

l N l

l Docuraent Control Desk l

" February 26,1993 Page 2 cc:

D. A. Brune, Esquire J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC R. I. Mclean, DNR l

J. H. Walter, PSC l

t 1

r