Forwards Insp Rept 50-440/93-03 on 930203-12.No Violations Noted
ML20034F214
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/23/1993
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stratman R
CENTERIOR ENERGY, CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20034F215 List:
References
NUDOCS 9303020411
Download: ML20034F214 (2)


See also: IR 05000440/1993003

Text

,

'

(i

s

FEB 2 31S63

Docket No.

50-440

Centerior Service Company

ATTN:

Mr.

R. A.

Stratman

Vice President

Nuclear - Perry

c/o The Cleveland Electric

Illuminating Company

10 Center Road

Perry, OH

44081-9514

Dear Mr. Stratman:

SUBJECT:

NRC INSPECTION REPORT NO. 50-440/93003(DRS)

This refers to the inspection conducted by Mr. K. Salehi of this

office on February 3 - 12, 1993.

The inspection included

a review of activities authorized for your Perry Nuclear' Power

Plant.

At the conclusion of the inspection, the findings were

discussed with those members of your staff identified.in the

enclosed report.

Areas examined during the inspection are identified in the

report.

This inspection examined your fuel failure experience,

and reviewed the corrective actions planned to improve. fuel

performance.

Within these areas, the inspection consisted of a.

selective examination of procedures, representative records, and

interviews of personnel.

In addition, a meeting was held at our

request, at the Region.III office in Glen Ellyn,-Illinois, on

February 10, 1993.

Duringlthe meeting, you and.GE Nuclear

presented your preliminary findings regarding initial root cause

analysis of the fuel failures, actions you took to mitigate the

consequences, and other activities for identifying potential root

'

causes.

No violations of NRC requirements Vere identified during the-

course of this inspection.

.In accordance with lo CFR 2.790 of the Commission's regulations,

a copy of this letter,'and the enclosed inspection report with

'

its enclosures will-be placed in the NRC Public Document. Room.

9303020411 930223

PDR

ADOCK'05000440

}

G

pyg

]l . 4

.

60L

3

.

t-

'l

Centerior Service Company

2

FEB 2 31cG3

We will gladly discuss any questions you.have concerning this

inspection.

Sincerely,

' { { Z h t a c I 1~ "'~* *. "' "3

-

Mark A.

Ring, Chief

Operations Branch

Enclosures:

1.

Inspection Report

No. 50-440/93003(DRS)

2.

Meeting Presentation of

February 10, 1993

,

cc w/ enclosures *

F.

R.

Stead, Director, Nuclear

Support Department

'

D.

P.

Igyarto, Plant Manager,

Perry Nuclear Power Plant

K.

P.LDonovan, Manager,

Licensing & Compliance Section

S.

F.

Kensicki, Director, Perry

Nuclear Engineering Dept.

H. Ray Caldwell, General

Superintendent, Nuclear

Operations

DCD/DCB (RIDS)

OC/LFDCB

LPM, NRR

Resident' Inspector, RIII

Terry J.

Lodge, Esq.

1

James R. Williams, State of Ohio

Robert E.

Owen, Ohio

Department of Health

A. Grandjean, State of Ohio,

~Public Utilities Commission

Clinton SRI

F

[

RIII

RIII

RIII

}&' i W

WW

W

Salehi/ks/cg/jk

B rgess

LanRsbury

Ring

02/y /93

02/z2/93

02/&3/93

02/22/93

'

y

<

--