Text
....
/
a'
.r b
U.S. NUCLEAR REGULATORY COMMISSION REGION I Report No.: 99990001/93-004 License No.: XSNM-2713 Licensee:
Transnudear. Inc.
Two Skyline Drive Hawthom. New York 10532-2120 Inspection At:
Dundalk Marine Terminal. Baltimore. Maryland Inspection Conducted:
Echruarv 5.1993
\\)
i Inspectors:
I A
17 ! 9.3 G.
Sinith, Senior Security Specialist
' Dat'e l
)
l
? AcdA &~
.d,42 4
A. Della Ratta, Physical Security Inspector date' Approved By:
2-/d - 95 I R. Keimig, Chi [ Safeguards Section Date Division of Radiation Safety and Safeguards ArcaLLn_soccted: Announced safeguards inspection of an irradiated reactor fuel shipment in transit at the Dundalk Marine Terminal, Baltimore, Maryland. The shipment was inspected prior to being loaded aboard an Atlantic Container Lines ship for transport, via standard ocean route, to Liverpool, England.
Resulin The licensee's program was directed toward the protection of public health and safety and was found to be in compliance with the NRC requirements in the areas inspected. No safety concerns or violations of regulatory requirements were identified.
9303020353 930219 PDR GA999 EMVTRNC 99990001 PDR
4 x
DETAILS 1.0 Kev Persons Contacted
- J. Mcl.aughlin, Traffic Coordinator, Transnuclear, Inc.
- Lt. Erwin, Maryland Port Authority (MPA) Police Sgt. Hurley, MPA Police Officer Moore, MPA Police Officer Tate, MPA Police
- R. Wingo, Petty Officer, United States Coast Guard I
- denotes telephone contact l
2.0 Badseround Region I was notified by a January 13, 1993 letter from the licensee that an export shipment ofirradiated reactor fuel would be made through the Dundalk Marine Terminal, Baltimore, Maryland.
The shipment was scheduled to arrive at the terminal on February 3,1993. That schedule was revised by the licensee by telephone on January 28,1993 and subsequently confirmed by memomndum dated February 3,1993. The schedule was revised to add 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to the date the shipment would arrive at the.
terminal. The shipment originated at the R. E. Ginna Nuclear Power Station, Ontario, New York, where it was inspected on February 4,1993 (NRC Inspection Report No.
50-244/93-01), and was being shipped under Export License XSNM-2713, dated January 13, 1993. The shipment was held at the terminal under armed escort until loaded aboard an Atlantic Container Lines ship for transport via'IJverpool, England to Le Harve, France.
3.0 Physical Protection for Irradiated Reactor Fuel In-Transit j
The inspector determined, as described below, that the licensee followed established procedures and NRC regulatory requirements for the physical protection of irradiated reactor fuel in-transit. The inspection included:
a a.
Verification, by independent measurements, that the radiation levels on the outside of the transport container were within the regulatory limits.
b.
Verification that the shipment, while at Dundalk Marine Terminal, a high density population area (Baltimore, Maryland urban area), was protected by two armed escorts stationed at a location that permitted observation of the transport container at all times.
c.
Verification that the armed escorts were equipped with radio communications, were capable of repen.ng assistance, and that the required periodic communications were being made.
7,
'.O a
o.
3 d.
Verification that a continuously staffed communications center had been established to facilitate such communications and that a log was being maintained of the required communication.
The inspector also interviewed the MPA officers that were contracted by the licensee to -
provide security for the shipment. The officers were found to be knowledgeable of the NRC's regulatory requirements for this type of shipment.
No deficiencies were identified in the area inspected.
4.0 Exit Interview Due to the nature of the inspection, no formal exit interview was held. The results of the inspection were provided by the inspector to Ms. J. McLaughlin by telephone on February 9,1993.