ML20034F165
| ML20034F165 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 12/31/1992 |
| From: | Beckman W CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9303020351 | |
| Download: ML20034F165 (4) | |
Text
t l
e a
Consumers power William L Beckman 1%nt Afanager POWERING MICHIGAN 5 PROGRESS Big Rock Point Nuclear Plant 10209 US 31 North, CharMvotz, MI 49720 l
February 26, 1993 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -
1992 ANNUAL REPORT - OCCUPATIONAL EXPOSURE BY JOB In accordance with Technical Specification 6.9.1.5, find attached the Annual Report documenting Occupational Exposure during 1992 sorted by job function.
/
fQhAW William L Beckman Plant Manager l
CC: Administrator, Region III, USNRC l
NRC Resident Inspector - Big Rock Point ATTACHMENT h
i i
020050 4' S
\\
9303020351 921231 I
PDR ADOCK 05000155 I I R
PDR A Cats G4E72GY COMPANY I
O w
i i
ATTACHMENT CONSUMERS POWER COMPANY BIG ROCK POINT PLANT DOCKET 50-155 1992 ANNUAL REPORT OCCUPATION EXPOSURE BY JOB h
F i
)
i PAGE 1 OFZ 23-Feb-93
. 3 99p.
ANNUAL EXPOSURE REPORT (Reg. Guide 1.16)
REPORTING NUMBER OF PERSONNEL AND MAN-REM BY WORK GROUP AND JOB FUNCTION
?
===========
======================================================= TOTAL PERSON-RE NUMBER OF PERSONNEL WITH DOSE > 100 mrem JOB FUNCTION BRP CPCo NON BRP CPCo NON STAFF NON-BRP CPCo STAFF NON-BRP CPCo WORK GROUP (STATION)(UTILITY) {OTHER) ( STATION )(UTILITY ) (OTHER)
REACTOR OPS. & SURV.
Maintenance 0
0 0
0.297 0.099 0.000 Operations 30 0
0 21.909 0.000 0.000 Health Physics 12 0
3 5.816 0.000 1.546 Supervisory Personnel 6
0 2
1.104 0.000 0.928 Engineering 1
0 0
0.328 0.000 0.000 I&C Personnel 4
0 0
0.854 0.000 0.000 QA/QC Personnel 0
0 0
0.000 0.000 0.170' NDT Personnel 0
0 0
0.000 0.005 0.000 TOTAL =
33.056 l
ROUTINE MAINTENANCE Maintenance 9
0 0
2.782 0.152 0.000 Operations 0
0 0
0.195 0.000 0.000 Health Physics 0
0 6
0.049 0.000 0.030 Supervisory Personnel 0
0 0
0.002 0.023 0.000 Engineering 0
0 0
0.006 0.000 0.000 I&C Personnel 4
0 0
0.687 0.002 0.000 QA/QC Personnel 0
0 0
0.000 0.000 0.030 NDT Personnel 0
0 0
0.000 0.004 0.000 TOTAL =
3.962 INSERVICE INSPECTION Maintenance 2
19 7
0.348 14.042 9.247 Operations 0
0 0
0.000 0.000 0.000 Health Physics 3
0 7
0.507 0.000 2.011 Supervisory Personnel 0
0 0
0.000 0.000 0.000 Engineering 1
0 0
1.368 0.000 0.000 I&C Personnel 0
0 0
0.000 0.000 0.000 QA/QC Personnel 0
0 0
0.000 0.000 0.000 NDT Personnel 0
7 11 0.000 3.932 6.747 TOTAL =
38.201 SPECIAL MAINTENANCE Maintenance 23 43 18 48.082 65.651 11.130 Operations 31 0
0 10.851 0.000 0.000 Health Physics 8
0 14 10.182 0.000 12.260 i
Supervisory Personnel 7
1 1
2.346 0.678 0.296 l
Engineering 8
0 0
4.443 0.000 0.000 I&C Personnel 6
1 0
5.408 0.112 0.000 QA/QC Personnel 0
0 4
0.000 0.000 2.402 NDT Personnel 0
3 1
0.000 0.799 0.226 i
TOTAL =
174.867
PAGE 2 OF2.
23-Feb-93 "1992" ANNUAL EXPOSURE REPORT (Reg.Ouide 1.16)
REPORTING NUMBER OF PERSONNEL AND MAN-REM BY WORK GROUP AND JOB FUNCTION
=========
=========================================================TAL PERSON-REM NUMBER OF PERSONNEL TO WITH DOSE > 100 mrem JOB FUNCTION BRP CPCo NON BRP CPCo NON STAFF NON-BRP CPCo STAFF NON-BRP CPCo WORK GROUP (STATION)(UTILITY) (OTHER) (STATION)(UTILITY) (OTHER)
WASTE PROCESSING Haintenance 2
0 0
0.908 0.124 0.016 Operations 3
0 0
1.224 0.000 0.000 Health Physics 4
0 0
0.868 0.000 0.148 Supervisory Personnel 0
0 0
0.037 0.000 0.008 Engineering 0
0 0
0.000 0.000 0.000 I&C Personnel 0
0 0
0.000 0.000 0.000 QA/QC Personnel 0
0 0
0.000 0.000 0.015 NDT Personnel 0
0 0
0.000 0.000 0.000 TOTAL:
3.348 REFUELING Haintenance 0
0 0
0.078 0.023 0.000 Operations 19 0
0 4.940 0.000 0.000 Health Physics 0
0 3
0.342 0.000 0.679 Supervisory Personnel 1
0 0
0.313 0.000 0.009 Engineering 0
0 0
0.083 0.000 0.000 i
I&C Personnel 0
0 0
0.005 0.000 0.000 QA/QC Personnel 0
0 0
0.000 0.000 0.000 NDT Personnel 0
0 0
0.000 0.000 0.000 TOTAL:
6.472 TOTALS Maintenance 36 62 25 52.495 80.092 20.393 Operations 83 0
0 39.118 0.000 0.000 Health Physics 27 0
27 17.765 0.000 16.675 i
Supervisory Personnel 14 1
3 3.802 0.701 1.242 Engineering 10 0
0 6.228 0.000 0.000 I&C Personnel 14 1
0 6.953 0.114 0.000 QA/QC Personnel 0
0 4
0.000 0.000 2.617 NDT Personnel 0
10 12 0.000 4.74 0 6.972
________________________________________________________________5.646 47.899 TOTALS 184 74 71 126.362 8
- TOTAL RWP EXPOSURE BY WORK GROUPS *****
GRAND TOTAL = 259.907 Health Physics Personnel =>
34.440 i
39.118 Operations Personnel =>
BRP Maintenance Personnel =>
52.495 i
CPCo I&C Personnel =>
7.067 80.792
)
FMS Personnel =>
CPCo Engineering Personnel =>
6.228 BRP Supervisory Personnel =>
3.B02 Others (includes 3 groups below) =>
35.964 QA/QC Personnel =>
2.617 NDT Personnel =>
11.712 21.634
)
rnnt rart nrc =>
-