Forwards Emergency Preparedness Insp Repts 50-245/93-03, 50-336/93-02 & 50-423/93-03 on 930119-22.Further Assessment Required for Two Unresolved Items
ML20034F136
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 02/22/1993
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20034F137 List:
References
NUDOCS 9303020318
Download: ML20034F136 (3)


See also: IR 05000245/1993003

Text

__

_ _ _ _ _ _ _

' Dd)

t

y

6

TEB 2 21993

l

l

l

Docket Nos. 50-245

License Nos. DPR-21

l

50-336

DPR-65

i

50-423

NPF-49

!

J

Mr. John F. Opeka

!

Executive Vice President - Nuclear

j

Northeast Nuclear Energy Company

]

P. O. Box 270

i

Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

Subject:

MILLSTONE STATION EMERGENCY PREPAREDNESS INSPECTION

(Combined Inspection Nos. 50-245/93-03, 50-336/93-02, 50-423/93-03)

On January 19-22, 1993, as described in the enclosed report, Mr. J. Lusher and others of this

office inspected the Millstone Station emergency preparedness (EP) program. The inspection

l

included interviews; emergency facilities, equipment, instrumentation, and supplies; organization

1

and management control; program changes; training effectiveness; selected procedure and record

reviews; and actions on previously identified NRC findings. Preliminary inspection findings

were discussed with Mr. S. Scace and other members of your staff at the conclusion of the

1

inspection.

Overall, we found that the Millstone Station Emergency Preparedness (EP) program was being

implemented acceptably. It was noted that a major change had been made to improve the EP

organization and staffing, and that there was a major Emergency Plan Implementing Procedures

change in process. We identified two unresolved items (URI) for further assessment. One URI

l

involved instances of listing the same person as the Duty Officer (the Technical Support Center

l

Manager in an emergency) and as the On-Site Director of Station Emergency Operations (the

initial Emergency Operations Facility Manager in an emergency). The second URIinvolved a

potential for exceeding the training qualification period for the Emergency Response

Organization (ERO). Further review is required to determine if either of these items is a.

violation of regulatory requirements.

l

l

010142

OFFICIAL RECORD COPY

1m

n) M

I

,.,

,

].6

3

'9303c20318 930222

.

ADOCK 0500

S

gDR

,

- _ _ - _ _ _ _ _ _ - _ _ - _ _ _ - _ - _ _ _ -

..

FEB 2 21993

-; .

Northeast Nuclear Energy Company

2

.

No reply to this letter is required. Thank you for your cooperation.

Sincerely,

Original Signed By;

Jarnes H. Joyner

i

James H. Joyner, Chief

1

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

,

Enclosure:

'l

Combined Inspection Report Nos.'50-245/93-03,50-336/93-02,

and 50-423/93-03

,

cc w/ encl:

W. D. Romberg, Vice _ President - Nuclear, Operations Services

S. E. Scace, Vice President, Millstone Station

H. F. Haynes, Nuclear Unit Director

J. S. Keenan, Nuclear Unit Director

C. H.- Clement, Nuclear Unit Director

R. M. Kacich, Director, Nuclear Licensing

'

D. O. Nordquist, Director of Quality Services

Gerald Garfield, Esquire

.

Nicholas Reynolds, Esquire

K. Abraham, PAO (2)

Public Document Room (PDR)

'

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

NRC Resident Inspector

State of Connecticut SLO

,

OFFICIAL RECORD COPY

-

-ib

u

. J

'M

-

-

-.

,M'2'

'

--j

. .-

ffB 2 2 f; 4

. ,

' Northeast Nuclear Energy Company

3

. t

,

bec w/ encl:

Region I Docket Room (with concurrences)

R. Blough, DRP

L. Doerflein, DRP

.W. Raymond, SRI, Haddam Neck

P. Swetland, SRI, Millstone

V. McCree, OEDO

,

V. Rooney, PM, NRR

O. Vissing, PM, NRR

D. Jaffe, PM, NRR

J. Anderson, NRR

R. Barkley, DRP

,

!

.

.

4

RI:DRSS

RI:DkSS

- RI:DRSS

'

Ves $ c.t

He E-nu.I

A

Lusher

McCabe

ner

'

2/12/93

2/18/93

2

/93

O

OFFICIAL RECORD C0PY

f

r;

.

r

m

.

,

w

S

.

'

,

it