l t
VVisu:onsin 1 Electnc POWER COMPANY 231 W MicNgan PO Box 2046 Mdwoukee WI 53201 (414) 221-2345 VPNPD-93-042 NRC-93-021 February 19, 1993 Document Control Desk U.S.
NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:
DOCKETS 50-266 AND 50-301 ASME SECTION XI REPAIR AND REPLACEMENT PROGRAM 1
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Wisconsin Electric Power Company submitted a letter to you on March 26, 1991 (NRC-91-034), stating that we do not have a formally documented repair and replacement program which fully meets the program requirements described in ASME Section XI, 1986 edition, no l
addenda, Articles IWX 4000 and 7000.
.In this letter, WE committed to revision and development of procedures as necessary so that repairs and replacements of Class 1, 2, and 3 piping systems are conducted in a manner which satisfies the requirements of the i
Section XI Code.
Also, a~ formal program description will be l
developed that delineates how repairs and replacements of these piping systems are performed at Point Beach.
The committed pro-l gram completion and implementation date is February 28, 1993.
l Wisconsin Electric established a task group to develop and l
implement a repair and replacement program.
This task group developed a procedure, QP 3-11, " Repair / Replacement Program,"
that delineates how repairs and replacements of requirements of IWX 4000 and 7000 of the'ASME Section XI Code.
The task group also reviewed and revised existing procedures and programs, as necessary, to successfully implement the repair and replacement program.. Formalized training on ASME Section XI and the repair and replacement program.
Formalized training on ASME Section XI and the repair and replacement program has been conducted.
l 1 0 l
.010My l
'g 9
~
h" I' 9303020299 PDR ADOCK O 2M-
/
DR Asutu%n onfismmh EnegrDzgmtka i
l p.
l t
Do6upent Control Desk
- February 19, 1993 Page 2 The Authorized Inspection Agency (Hartford Steam Boiler) has reviewed QP 3-11,
" Repair / Replacement Program" and has found it acceptable.
The repair and replacement program will be implemented on February 28, 1993.
If you have any questions concerning this program, please contact us.
Sincerely,
~
.y Bob Link I
Vice President Nuclear Power j9 cc:
NRC Resident Inspector NRC Regional Administrator, Region III