ML20034F001

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 93-24 W/Util on 930316 in King of Prussia,Pa Re Enforcement Conference Re Violations Identified During Radiological Protections Insps Conducted Between 930101 & 0212
ML20034F001
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 02/23/1993
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
EA-93-037, EA-93-37, NUDOCS 9303020176
Download: ML20034F001 (2)


Text

1

.. ~

e FEB 2 31993 U.S. NUCLEAR REGULATORY COMMISSION No. 93-24 a

REGION I EA 93-037 NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:

Philadelphia Electric Company Facilities:

Limerick Generating Station, Units 1 & 2 Docket Nos.:

50-352/353 Time and Date:

9:00 a.m., Tuesday, March 16,1993 Location:

U.S. NRC, Region I, King of Prussia, PA Main Conference Room

Purpose:

Enforcement Conference Regarding Violations Identified During Radiological Protections Inspections Conducted t. atween January 1 and

~!

February 12, 1993 NRC Attendees:

J. Wiggins, Director, Division of Reactor Projects (DRP)

E. Wenzinger, Chief, Projects Branch 2, DRP C. Anderson, Chief, Reactor Projects Section 2B, DRP R. Cooper, Director, Division of Radiation Safety and Safeguards (DRSS)

S. Shankman, Deputy Director, DRSS J. Joyner, Chief, Facilities Radiological Safety and Safeguards Branch, DRSS W. Pasciak, Chief, Facilities Radiation Protection Section, DRSS R. Nimitz, Senior Radiation Specialist, FRPS, FRSSB, DRSS R. Fernandes, Reactot Engineer, DRP Licensee Attendees: D. Helwig, Vice President, Limerick J. Doering, Plant Manager G. Murphy, Radiation Protection Manager G. Roach, Superintendent of Services R. Boyce, Maintenance Manager R. Krick, Licensing Engineer G. Madsen, Regulatory Supervisor Note: This meeting is open to the public. Handicapped persons requiring assistance to attend or participate in the_ meeting shall make their requests known to Cliff -

Anderson, Chief, Reactor Projects Section 2B, no later than five business days prior to the meeting. Attendance by other NRC personnel at this meeting should be made known by 4:00 p.m., Friday, March 12, 1993.

ORIGIN /.l. SIGNED Ff EDWARD C. WEENGER Clifford J. Anderson, Chief Reactor Projects Section 2B jf lf D.

9303020176 930223-Division of Reactor Projects

>4'y-

/

ADOCK0500g32 DR

FEB 2 3 1993 2

Distribution: (Via E-Mail)

J.M. Taylor, Executive Director for Operations (EDO)

J. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

T. E. Murley, Director, Office of Nuclear Reactor Regulation H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)

J. Lieberman, Director, Office of Enforcement B. Grimes, Director, Division of Operating Reactor Support, NRR-C. Rossi, Director, Reactor Inspection & Licensee Performance, NRR W. T. Russell, Associate Director for Inspection and Technical Assessment, NRR J. Partlow, Associate Director for Projects, NRR S. Varga, Director, Division of Reactor Projects - I/II, NRR J. Calvo, Assistant Director for Region I Reactors, NRR V. McCree, Regional Coordinator, OEDO N. Green, Jr., PoFcy Deve'lopment and Technical Support Branch S. Bajwa, RPEB, NRR S. Lewis, Office of the General Counsel (OGC)

C. Miller, Director, Project Directorate I-2, NRR F. Rinaldi, Project Manager, Limerick, PD I-2, NRR Thomas Kenny, SRI Region I Branch Chiefs Region I Section Chiefs K. Abraham, Public Affairs Officer, RI D. Serenci, Field Public Affairs Officer, RI T. Fish, State Liaison Offi:er, RI T. Darden, State Agreements Officer, RI K. Smith, Regional Attorney, RI D. Holody, Enforcement Officer, RI B. Letts, Office of Investigations, Region I Field Office.

J. I2nning, DRP, RI J. Douglas, DRMA, RI Distribution:

Public Document Room (PDR)

Local Public Document Room (LPDR)

' D. M. Smith, PECo State of Pennsylvania -

RA Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DRSS Division Secretary, RI DRMA Division Secretary, RI Projects Branch No.1, Secretary, RI Region I Receptionist R1 R>

RI.

P CAnderson EWenzinger 2

/93 2p/p3 OFFICIAL RECORD COPY I