Forwards Semiannual Monitoring Rept for Jul-Dec 1992 & Rev 9 to Odcm
ML20034E941
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/25/1993
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20034E942 List:
References
CON-NRC-93-024, CON-NRC-93-24 VPNPD-93-047, VPNPD-93-47, NUDOCS 9303020104
Download: ML20034E941 (18)


Text

---

O V

s

.~.' 0;_

Wisconsin Electnc POWER COMPANY 231 W Mchgan.PO Box 2046.Mhouue WI 53201-2046 (414]221 2345 VPNPD 047 NRC 02 4 February 25, 1993 Document Control Desk U.

S.

NUCLEAR REGULATORY COMMISSION t

Mail Station P1-137 Washington, DC 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 SEMIANNUAL MONITORING REPORT POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Enclosed is the Semiannual Monitoring Report for Point Beach Nuclear Plant, Units 1 and 2, for the period July 1, 1992, through December 31, 1992.

This report is submitted in accordance with Technical-Specification 15.7.8.4.A and contains information regarding plant releases, solid waste shipments, new and spent fuel shipments, environmental monitoring, circulating water system operations, leak testing of sources, and other miscellaneous reportable items from this reporting period.

Three copies of this report, along with a copy af the revised Point Beach Nuclear Plant Environmental Manual /Offsite Dose Calculation Mai;ual, are provided for your convenience.

Because of printing delays, we are submitting unbound copies of the Semiannual Monitoring Report.

We will send finished, bound copies by Merch 31, 1993.

We apologize for any inconvenience this may cause.

Sincerely,

.[ 17 Bob id Vice, President Nuclear Power Enclosures cc:

NRC Resident Inspector Ib}h NRC Regional Administrator

/

r.1 T'

  • b O

^

L DAW /akf 9303020104 930225 PDR ADOCK 05000266

- A l

R PDR

~

{

{

(

)

ummenn - rw ne=~