ML20034E649
| ML20034E649 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 02/23/1993 |
| From: | Link B WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19303F365 | List: |
| References | |
| CON-NRC-93-022, CON-NRC-93-22 VPNPD-93-045, VPNPD-93-45, NUDOCS 9303010132 | |
| Download: ML20034E649 (1) | |
Text
Wisconsin Electnc POWER COMFANY 2:- w veym c so,2:.e wesee wt snac pw 2 e em o
VPNPD-93 -0 4 5 NRC-93-022 February 23, 1993 Document Control Desk U.S.
NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:
POCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN PROCEDURES POINT BEACH NUCLEAR PLANT. UNITS 1 & 2 Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Procedures Manual.
The procedures consist of changes which should be filed in your copies of the subject document in accordance with the attached instructions.
Please note that the procedures containing names and telephone numbers are stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE."
A copy of the affected. procedures, with names and numbers deleted, are provided and are stamped " NAMES AND TELEPHONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents rooms.
Sincerely, w /J4 v
t Bob Link Vice President Nuclear Power RL/jg Enclosure 1
cc:
NRC Resident Inspector (w/o/e)
Incident Response Center, Region III 010002 3/# ' '
9303010132 930223 7 /'
^
PDR ADOCK 05000266 Y
g
- jf' f/)[
j // r PDR g,,,,,,,,
,y J
&B/&
/
/A