Mod 8,raising Contract Ceiling,Incorporating Scope Changes to Tasks 6 & 7 & Extending Period of Performance Until 930330 to, Human Factor Evaluation of Brachytherapy Using Remote Afterloaders
ML20034E533
Person / Time
Issue date: 01/14/1993
From: Callan J, Michael Scott
NRC OFFICE OF ADMINISTRATION (ADM), PACIFIC SCIENCE & ENGINEERING GROUP, INC.
To:
References
CON-FIN-L-1116, CON-NRC-04-90-074, CON-NRC-4-90-74 NUDOCS 9302260300
Download: ML20034E533 (4)


Text

.

ADR

?

o

1. CONT RAC1 80 COOL 6'AG L of: s'AGLs

,NJENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1

l 3

3. Cf- #:LC1 l VI. OAl 4'
4. HCQUtstiION/PURCHAs0 RLQ. NO.
6. PHOJccT No, pf.pp44c.g>g,j y AMLNOMLN1/MOOtt GCA1 $ON NO.

RES-90-074 dtd 11/16/97 RFB-C934X)7 Eigit (8)

y. Aoumisrcaco ev of.=r u u<= si coocI

.ssuco uy

cogg, U.S. Nuclear Regulatory Commission Division of Contracts & Property Management Washington, DC 20555 l

U NauE ANo Aooacss or Coni nacioR cn c.==.smu.w zac.e<>

_In *^.^ucNc-cur or soucnAnoN No.

N c Scim & F1pmcHm; Group, Inc.

5090 Shoreham Pf ar c, Suite 206 enno mina, as, San Diego, CA 9g122 noA.gone. canon Or CONT RAcTjoRoeR Principal Investigator /Teduzical I

mc-04-904)74

Contact:

Ja"'m R. ca m n, President ses.DATEo ******ar**>

Telaphana No. (bl9) 53'i-1661 8/15/90 lFAQUTYCODE CODE 11.THIS ITEM ONLY APPLIESTO AMENDMENTS OF SOLICITATIONS

- Tiw stie== siumband sendosen is amended.as set serei in tems 14.The hourand done speestan is.o. e mad =I.

orses snust -+=a-a-a seeenpe of shis amendment erter es she houranddone speanied in she saadmeon er esamended.ev ene et sie sese.dne r

espies er she amendenac the eradmeweses neseseiptof thisapaad==a'eneacdienswof sheeNor s

-a r m==teamseandis.endseennins as the ssedessen and asiendaient aundiere. FAtuJRE OF YOUlt ACI3dOWu!D a

er es sy espemes noteer a enesrammedse incendes a set MElpKTO BE ftECEIVED ATTHE PLAGE DESIGNATED FOR THL.

Ji1PT OF OFFEftS PftIOR TO THE HOUR Afe DATE 86 MAY fESULT esteer sw CTION OF YOUR OFTER. If Ig gerees et this

====d==== vadeshe eschenge seeNersimedr adesmed.patiehuge mer be made it edegamer i

veded assi essesem w eener nehme sesmenes se she sendessen and ede

====d===* and as seashed swear se she speaks tourand does spedRed.

IN REJE

32. AoODUNTING AND X. ~., Jimm DATA dIf

_ /*

B&R No.: 36019401200 Fizn No.: L1116 APPN No.: 3 30200.360 Oh W atarh $46_fm m 13.THIS ITEM APPLIES ONLY TO HOD:rSCATIONS OF CONTRACTSK)RDERS.

fT MODIFIESTHE CONTRAgr/ ORDER NO. AS DESCRIBED IN ITEM 14.

A.

H NGE o PU *U^NT To: dEsiHWf"sersheefty) THE C"_f'-^"3 SET FORTH 8N ITEM 34 ARE ^"'" 4N THE COM.

g jl5 l

3.THE ABOVE N.UeASEREO CONTRACT / ORDER IS saOOtFIED TO REFLECT

_ ;. ' ^-_ d er.eacJ SET FORTH IN ITEM 14.S'URSUANT TOTHE AUTHORITY OF FAR 43.3 3(el.

C.THIS SUPPLEMENTAL AGREEMENT 45 ENTE"EO 8NTO PU'**' ^ ^"T TO AUTHORt rY OFs O.oTHER dEpredfy opt e( sm.da/ seed n and e.ssheritrf X

FAR 52.243-2 CHANGES -Cost Re u.._ _ _.:

and 10tiud A.. _=..r nr %

0..-e-w 2

E.IMPORTANT: Contractor is not.

is required to sign this document and return copies to theissuing office.

so.oEsensersoN or aucNoucNiswoosrecAieoM dc.;--- - er secr----- -

" n -- -

neses

-'------a e#ect seer asneer -

See Attached.

'{}

l

(

9302260300 930114

(

q\\,)

PDR CONTR 1

NRC-04-90-074 PDR s

a ae.N

. vie.e s r.in..it i.rms one coneeti.

.e tei. e c =.nt,.s.<.ac.a 6. :

sn'.c oA.

m.r.tovo en.ne.a.

in on. e.4 a sa visu orce c e.,8 es.

5AND T8TLE OF CONT RACTING OFFICER @ype rprimU 1

1SA. NAME AND T41LE of 50GNER (TyPc e a0 g

Lynn Scott, Contracting Officer

[( [

[lM&W/

K asc.oAn secNco an.

Eo m

t.C.OAn sicNco u,s. C 1 voafor JAN 141993 sv du iyy am e <

1c a a ous :

4 j ass

.<n ~ a..u.>

sTAnoAno roRuso cacv.so es;

.M............e so.nos

i

=

NRC-04-90-074 Modification No. 8 Page 2-of 3 A summary of obligations for this contract, from award date through the date of this action is given below:

)

Total FY90 obligation amount $ 95,951.29 Total FY91 obligation amount $165,317.56 Total FY92 obligation amount $ 47,543.00 Total fY93 obligation amount $ 46,000.00 Cumulative Total of NRC Obligations $354,811.85.

This modification obligates FY93 funds in the amount of $46,000.00.

All other terms and conditions of the contract remain the same.

l I

t

?

NRC-04-90-074 Modification No. 8 l

Page 3 of 3 i

The purpose of this modification is to (1) raise the contract ceiling in i

the amount of $50,206.80 from $308,811.85 to $359,018.65 and incrementally fund the contract by $46,000.00, (2) incorporate within scope changes to Tasks 6 and 7 of the contract and (3) extend the period of performance of the subject contract. Accordingly, the contract is hereby modified as t

follows:

P 1.

Under Subsection B.3, paragraphs a and c are deleted in their entirety and replaced with the following:

"a. The total estimated cost to the Government for full performance of this contract (Task 1), and Optional Tasks 1 through 6 is $359,018.65 of which $336,185.76 represents estimated reimbursable costs, and of which $22,832.89 the fixed fee.

"c. The amount obligated by the Government with respect to this contract is $354,811.85."

2. Section F.6 - DURATION OF CONTRACT PERIOD (MAR 1987) ALTERNATE II is revised to read as follows:

"This contract shall commence on August 15, 1990 and will expire on September 31, 1993."

j l

i I

3. Under Section C.I.3, " WORK REQUIREMENT" the following changes are hereby made:

Task 6:

Estimated Completion Date: Eight months from the execution date of this modification.

l Task 7:

Revise the Task Letter Reports for Tasks 2 through 5 so that they are in a form that will be publishable as supplemental volumes to the required NUREG/CR for Task 6.

There should be a separate supplemental volume for each of Tasks 2 through 5.

The NRC project manager will return the drafts with comments within 60 l

days of delivery of the drafts. The contractor will incorporate the comments and submit the final product in camera-ready NUREG/CR format within 30 days of receipt of NRC comments.

Estimated completion date: Six months from the date of execution of this modification.

Estimated Level of Effort: 16 person-weeks.