ML20034E528
| ML20034E528 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 02/23/1993 |
| From: | Trottier E Office of Nuclear Reactor Regulation |
| To: | Frizzle C Maine Yankee |
| Shared Package | |
| ML20034E529 | List: |
| References | |
| TAC-M84918, NUDOCS 9302260290 | |
| Download: ML20034E528 (3) | |
Text
_ _ _ _ - _ _ _ _ _ _
February 23, 1993 Docket No. 50-309 DISTRIBUTION:
Docket File 50-309 Wanda Jones-P-370 NRC & Local PDRs C. Grimes - 11 F23 PDI-3 Reading ACRS (10) - P-315 S. Varga OPA - 2 G5 Mr. Charles D. Frizzle, President J. Calvo OC/LFDCB Maine Yankee Atomic Power Company W. Butler J. Linville, RI 83 Edison Drive T. Clark Augusta, Maine 04336 E. H. Trottier OGC - 15B18
Dear Mr. Frizzle:
D. Hagan - MNBB 3206 G. Hill (2) - P1-22
SUBJECT:
ISSUANCE OF AMENDMENT NO.
137 TO FACILITY OPERATING LICENSE NO. DPR-36, MAINE YANKEE ATOMIC POWER STATION (TAC NO. M84918)
The Commission has issued the enclosed Amendment No.137 to Facility Operating License No. DPR-36 for the Maine Yankee Atomic Power Station.
This amendment is in response to your application dated December 15, 1992.
This amendment revises Technical Specification (TS) 4.6.A.2.f and its Acceptance Criteria by rewording and incorporating Condition 1, and deleting Conditions 2 and 3.
Condition 4 is reworded and incorporated into the Remedial Action for TS 3.19.A.4.
The Basis of TS 3.19.A.4 and 4.6 also is revised to delete reference to the previous operating position of low pressure injection motor operated valves LSI-M-11, 21, and 31, and their use as pressure isolation barriers.
(Note that " Remedial Action" is an administrative correction of " Exception".) Finally, the Exception to TS 4.6.A.I.b is deleted, and a correction to a typographical error is made on Page 4.6-3.
A copy of our Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Reaister Notice.
Sincerely,
/S/
E. H. Trottier, Project Manager Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosures:
1.
Amendment No.137 to License No. DPR-36 2.
Safety Evaluation cc w/ enclosures:
See next page OFFICE:
LA:PDI-3 PM:PDI-3 SRXB OGC/ 4 4f D:PDI-3 TCo[h EHTr t' r 7 N"5 I
WButlerf k NAME:
n u
W
/W e
DATE:
O/ /d[93 03 93
/ /h793
/ M 93 I /29/93
/ /
0FFICIAL RECORD COPY Document Name: MYM84918.AMD
- n a n.-
9302260290 930223 p0{
PDR ADDCK 05000309 P
/
'o UNITED STATES 4
~, ^
!.~-
NUCLEAR REGULATORY COMMISSION 7
i
{
WASHINGTON, D. C. 20555
+
February 23, 1993 Docket No. 50-309 Mr. Charles D. Frizzle, President Maine Yankee Atomic Power Company 83 Edison Drive Augusta, Maine 04336
Dear Mr. Frizzle:
SUBJECT:
ISSUANCE OF AMENDMENT NO.
137 TO FACILITY OPERATING LICENSE NO. DPR-36, MAINE YANKEE ATOMIC POWER STATION (TAC NO. M84918)
The Commission has issued the enclosed Amendment No. 137 to Facility Operating License No. DPR-36 for the Maine Yankee Atomic Power Station.
This amendment is in response to your application dated December 15, 1992.
This amendment revises Technical Specification (TS) 4.6.A.2.f and its Acceptance Criteria by 'cwording and in:orporating Condition 1, and deleting Conditions 2 and 3.
Condition 4 is reworded and incorporated into the Remedial Action for TS 3.19.A.4.
The Basis of TS 3.19.A.4 and 4.6 also is revised to delete reference to the previous operating position of low pressure injection motor operated valves LSI-M-11, 21, and 31, and their use as pressure isolation barriers.
(Note that " Remedial Action" is an administrative correction of " Exception".)
Finally, the Exception to TS 4.6.A.l.b is deleted, and a correction to a typographical error is made on Page 4.6-3.
A copy of our Safety Evaluation is also enclosed.
Notice of Issuance will be included in the Commission's biweekly Federal Reaister Notice.
Sincerely, E. H. Trottier, Project Manager Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation L 'osures:
1.
Amendment No. 137 to License No. DPR-36 2.
Safety Evaluation cc w/ enclosures:
See next page j
Mr. Charles D. Frizzle Maine Yankee Atomic Power Station cc:
Mr. Charles B. Brinkman Mr. James R. Hebert, Manager Manager - Washington Nuclear Nuclear Engineering and Licensing Operations Maine Yankee Atomic Power Company Combustion Engineering, Inc.
83 Edison Drive 12300 Twinbrook Parkway, Suite 330 Augusta, Maine 04336 Rockville, Maryland 20852 Mr. Robert W. Blackmore John A. Ritsher, Esquire Plant Manager i
Ropes & Gray Maine Yankee Atomic Power Company One International Place P.O. Box 408 Boston, Massachusetts 02110-2624 Wiscasset, Maine 04578 Mr. Uldis Vanags Mr. G. D. Whittier, Vice President State Nuclear Safety Advisor Licensing and Engineering State Planning Office Maine Yankee Atomic Power Company State House Station #38 83 Edison Drive Augusta, Maine 04333 Augusta, Maine 04336 Mr. P. L. Anderson, Project Manager Mr. Patrick J. Dostie Yankee Atomic Electric Company State of Maine Nuclear Safety 580 Main Street Inspector Bolton, Massachusetts 01740-1398 Maine Yankee Atomic Power Company P. O. Box 408 Regional Administrator, Region I Wiscasset, Maine 04578 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 First Selectman of Wiscasset Municipal Building U.S. Route 1 Wiscasset, Maine 04578 Mr. Charles S. Marschall Senior Resident Inspector Maine Yankee Atomic Power Station U.S. Nuclear Regulatory Commission P. O. Box E Wiscasset, Maine 04578