ARKEGu
. jg UNITED STATES NUCLEAR REGULATORY COMMISSION o
.,4.
- e WASHINGTON. D. C. 20555
\\...../
POWER AUTHORITY OF THE STATE OF NEW YORK DOCKET NO. 50-333 JAMES A. FITZPATRICK NVCLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.185 License No. DPR-59 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Power Authority of the State of New York (the licensee) dated September 25, 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commiision's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; s
C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendmer.t is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-59 is hereby amended to read as follows:
)
il 22gOCK0S000333 155 930218 Pp PDR
. (2) Technical Scecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.185, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment !s effective as of the date of-its issuance to be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
} & d. (+pe d Robert A. Capra, Director Project Directorate I-l Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications l
Date of Issuance: February 18, 19D3 f
i
=.
4 ATTACHMENT TO LICENSE AMENDMENT NO.185 e
FACILITY OPERATING LICENSE NO. DPR-59 DOCKET N0. 50-333 Revise Appendix A as follows:
Remove Pace Insert Pace 64 64 s
JAFNPP TABLE 32-1 INSTRUMENTATION THAT INITIATES PRIMARY CONTAINMENT ISOLATION Minirnum No.
of Operable Total Number of Instrument Instrument Channels Channels Per Provided by Design Trip System (1)
Instrument Trip Level Setting for Both Trip Systems Action (2) 2(6)
Reactor Low Water Level
> 177 in. above TAF 4 Inst. Channels A
1 Reactor High Pressure 575 psig 2 inst. Channels D
(Shutdown Cooling isolation) 2 Reactor Low-Low-Low Water Level
> 18 in. above TAF 4 Inst. Channels A
2(6)
High Drywell Pressure 52.7 psig 4 Inst. Channels A
2 High Radiation Main 53 x Normal Rated 4 inst. Channels B
Steam Une Tunnel Full Power Background (9) 2 Low Pressure Main Steam Une
> 825 psig (7) 4 Inst. Channels B
2 High Flow Main Steam Une 5140% of Rated Steam Flow 4 Inst. Channels B
2 Main Steam Une Leak 540*F above max ambient 4 Inst. Channels B
Detecton High Temperature l
4 Reactor Cleanup System Equipment 540*F above max ambient 8 Inst. Channels C
Area High Temperature 2
Low Condenser Vacuum
> 8" Hg. Vac (7)(8) 4 Inst. Channels B
Closes MSIV's Amendment No.((,[
p, 185
--