ML20034E138

From kanterella
Jump to navigation Jump to search
Forwards Peach Bottom Atomic Power Station Unit 2 ISI Summary Rept for 920912-1210 Periodic Insp
ML20034E138
Person / Time
Site: Peach Bottom 
Issue date: 02/18/1993
From: Miller D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20034E139 List:
References
CCN-93-14018, NUDOCS 9302250158
Download: ML20034E138 (1)


Text

,

CCNI3-14018

~f e

4 PHILADELPHIA ELECTRIC COMPANY n

lPl:ACH BOTTOM ATOMIC POWER STATION R. D. 1. Box 208 -

Delta, Pennsyhania' 17314 Y

vixu wnou-nm paan w rxcau:wcr G17) 456-7014 if D. B. Miller. Jr.

Vece Presdent February 18, 1993 Docket Nos.: 50-277 I

U.S. Nuclear Regulatory Commission Wention: Document Control Desk Mail Station F1-137 Washington DC 20555 k,

b

Subject:

Peach Bottom Atomic Power Station Unit 2 - Inservice inspection t

- Gentlemen:

p L-In accordance with the Philadelphia Electric Company Second Ten-Year Interval lnservice inspection Program, inservice inspections (ISts) were completed on Unit 2 during the September 12,1992 through December 10,1992.

p L

Enclosed is the ' Summary Report for the September 12,1992 to December 10,1992 Periodic Inspection" (NIS-1) and the

  • Summary of ASME Repairs and Replacement Completed" (NIS-2) This report c

is required per Technical Specification G.9.2 b.

Sincerely, i

.d.

y r

I r-DBM/DJP.lus Enclosures-cc:

. R. A. Burricelli, Public Service Electric & Gas (w/o enclosures) p.~

T. M. Gerusky, Commo.wvealth of Pennsylvanla (w/o enclosures)

J. J. Lyash, USNRC Senior Resident inspector, PBAPS -

R. L McLean, State of Maryland (w/o enclosures)

T. T. Martin; Administrator, Region I, USNRC p'

H. C. Schwemm, Atlantic Electric (w/o enclosures) i C. Di Schaefer, Delmarva Power (w/o enclosures)-

I J. L Warren, Hartford Steam Boller Chief Boller inspector, Commonwealth of Pennsylvania i

.~7302I50158 930218 PDR ADOCK 05000277-Ed

~G PDR

-)

W.

~

q

)