ML20034E138
| ML20034E138 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 02/18/1993 |
| From: | Miller D PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20034E139 | List: |
| References | |
| CCN-93-14018, NUDOCS 9302250158 | |
| Download: ML20034E138 (1) | |
Text
,
- CCNI3-14018
~f e
4 PHILADELPHIA ELECTRIC COMPANY n
lPl:ACH BOTTOM ATOMIC POWER STATION R. D. 1. Box 208 -
Delta, Pennsyhania' 17314 Y
vixu wnou-nm paan w rxcau:wcr G17) 456-7014 if D. B. Miller. Jr.
Vece Presdent February 18, 1993 Docket Nos.: 50-277 I
U.S. Nuclear Regulatory Commission Wention: Document Control Desk Mail Station F1-137 Washington DC 20555 k,
b
Subject:
Peach Bottom Atomic Power Station Unit 2 - Inservice inspection t
- Gentlemen:
p L-In accordance with the Philadelphia Electric Company Second Ten-Year Interval lnservice inspection Program, inservice inspections (ISts) were completed on Unit 2 during the September 12,1992 through December 10,1992.
p L
Enclosed is the ' Summary Report for the September 12,1992 to December 10,1992 Periodic Inspection" (NIS-1) and the
- Summary of ASME Repairs and Replacement Completed" (NIS-2) This report c
is required per Technical Specification G.9.2 b.
Sincerely, i
.d.
y r
I r-DBM/DJP.lus Enclosures-cc:
. R. A. Burricelli, Public Service Electric & Gas (w/o enclosures) p.~
T. M. Gerusky, Commo.wvealth of Pennsylvanla (w/o enclosures)
J. J. Lyash, USNRC Senior Resident inspector, PBAPS -
R. L McLean, State of Maryland (w/o enclosures)
T. T. Martin; Administrator, Region I, USNRC p'
H. C. Schwemm, Atlantic Electric (w/o enclosures) i C. Di Schaefer, Delmarva Power (w/o enclosures)-
I J. L Warren, Hartford Steam Boller Chief Boller inspector, Commonwealth of Pennsylvania i
.~7302I50158 930218 PDR ADOCK 05000277-Ed
~G PDR
-)
W.
~
q
)