Forwards Kewaunee Nuclear Power Plant Reload Safety Evaluation,Cycle 19. Evaluation Indicates That Cycle 19 Core Design More Conservative than Design Used in Util Accident Analysis
ML20034D818
Person / Time
Site: Kewaunee 
Issue date: 02/16/1993
From: Schrock C
WISCONSIN PUBLIC SERVICE CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20034D819 List:
References
CON-NRC-93-033, CON-NRC-93-33 NUDOCS 9302240217
Download: ML20034D818 (1)


Text

y--

n.-

E r...-

WPSC(4141433-1598 NRC-93-033 TELECOPIER (414)433-5544 EASYLINK E2991993 WISCONSIN PUBLIC SERVICE CORPORATION 600 North Acams

  • P.D. Box 19D02
  • Green Bay,WI 54307-9002 -

t

.?

February 16,1993 U. S. Nuclear Regulatory Commission A'ITN: Document Control Desk Washington, D.C. 20555 Gentlemen:

r Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Cycle 19 Reload Safety Evaluation This letter transmits 3 copies of the Reload Safety Evaluation for the Kewaunee Cycle 19 reload -

core. Our evaluation has shown that the Cycle 19 core design is more conservative than the-design used in our accident analysis. Therefore, the Cycle 19 reload design does not create an unreviewed safety question, and we are proceeding with the reload in accordance with the-provisions of 10 CFR 50.59(a)(1).

For your information, the Cycle 18-19 refueling outage is presently scheduled.to' begin-March 6,-1993; and the Cycle 19 startup testing is scheduled to begin approximately

' April 14,1993.

Sincerely, e,0. JJuL C. A. Schrock Manager -' Nuclear Engineering

. BJD/cjt Enc.

cc - Mr. Patrick Castleman, US NRC US NRC, Region III ucunexac3 7.wr I