j W$4.F CREEK NUCLEAR OPERATING CORPORATION John A, Bailey Vice Proendent May-15, 1990 l --
NO 90-0151
-l B[
-U S. Nuclear Regulatory Consnission
)
i ATTN: Document Control Desk Hall Station P1-137
- l Washington, D. C.
20555 t
Subject:
Docket No. 50-482: April'1990. Monthly Operating 5
Report Gentlemen Attached is the April 1990, Monthly-Operating Report 'for Wolf Creek Generating Station.
This submittal is being made in accordance with the requirements of Technical-Specification 6.9.1.8.
s
-Very truly yours,-
i John A. Bailey k
-Vice President Nuclear Operations JAB /jra Attachment l
cc: R. D. Martin (NRC), w/a D. Persinko (NRC), w/a D. V. Pickett (NRC), w/a M.'E. Skow (NRC), w/a
, r l
l 9 O h[i [ h U(l[+ h LOUU3h POR ADUii~ M"O M 32
'l R
F Di:
i RO. Box 411/ Builington, KS 86839 / Phone: (316) 364-8831
/
l An Equal Opportunity Ernpoyer MFMC/ VET -
gk
Y i
90-0151' fi
. Attachment to NG
~. f a
ti A
)
- i NOIE CREEK NUCLEAR OPERATING CWPCRATIN 1-WOLF CREEK GENERATING STATI N '
?i M N mLY OPERATING REPORT
- (
c 20tmi:
Anril-YEAR:=,_192Q j
Docket No.a 50-482 r
Facility Operating l License No.: NPF-42 I
Resort No.,__j2_
[
}
l i
.Lf y
i 4
l:..
l:
- i Prepared by:
-i 1
Merlin G. Williams a
i i
+ +
l '.-
Lm 4
1 o
i a
.i--
..,,,, -. -., ~
n,7 l '-
Attachment to N0 90-0151 -
l....
u SLHORY l,
I
! ~
'Ihe following repod. highlights the ' operating experience of Wolf Creek Generating Station for the month of April, 1990. 'Ihis apu.i. is being provided pursuant to Technical Specification 6.9.1.8.
I I.-
SlMURY OF CPIRATING EXPERIENCE Ihe unit remained shutdown for refueling throughout the month. Reloading of
!~
fuel into the reactor vessel was started cn April 9,1990 (entered Mode 6 -
Ref mling and ocupleted April'.15,1990. 'the reactor vessel head was in place atd)the studs-tensioned on April 26, 1990 (entered Node 5 -' Cold:.
Shutdown).
i l
II. MMCR SAFETY REIATED MAINI'ENANCE ACTIVITIES '
1.
Eddy current testing on Steam Generators "B" and "D".
i 2.
24-hour reliability runs en Energency Diesel Generators.
3.
Ccmpleticn of pump and valve Inservios Inspection-(ISI).,
1 L
4.
Par = ira to containment coolers.
5.
Reconstitution of one fuel assembly.
6.
Turbine <iriven anviliary feedwater pump overspeed' test..
e, I
i i
L I
}
.f i
i Wolf Creek Generating Station Monthly Operating Report April 1990 Page 1 of 5 t
?
(
~
m-Attachment to N0'90-0151 OPERATIN3 DMR REKRT b
DOCKET No.'
50-482
^
NCLF CRIEK GENERATDG S'5LTION:
[
NCLF CREEK NUC[JER CPIRATDG (XRPGUGION-l DME 05-01-90 CXMPLETED BY M. Milliams TilLBPH3E 316-364-8831 3
l CPERATDG STMUS 1,
Reporting Period:
Anril,1990
' Gross Hours-in Reporting Period: 719
'2.
Currently Authorized Power Imvel(left):,_3111 Max.-Depend. Capacity ()Ste-Net),,J1]E Design Electrical Rating (IP.4-Net): 1170 3.
Power Imvel to'Nhich Restricted (If Any)(190s-Net):'
N/A 4.
Reasons for restriction (If Any):
N/A N
4
'!his lenth - Yr. to Date. Cumlative 5.
N eber of Hours Reactor was Critical 0.0 1577.3 31,876.7-
- 6.
Reactor Reserve Shutdown Hours 0.0 0.0-339.8
[
l 7.
Hours Generator on Line 0.0 1554.7 31,341i8 si i
.i l
8.
Unit Reserve Shutdown Hours 0.0 0,0 '
0.0 J
'9.
Groes '1herml Enagy Generated (M*O O
5,152,108 103,629,363-
.[
- 10. Gross Electrical Energy Generated (1961) 0 1,796,240. -36,075,187-
- 11. Net Electrical Energy Generated (196H) 0 1,718,523
- 34',440,894
- 12. Reactor Service Factor 0.0
'54.8 78.1
- 13. Reactor Availahility Factor 0.0 54.' 8 -
78.9-j ju.14. Unit Service Factor 0.0 '
54.0
-76.8 i
jE15. Unit Availability Factor 0.0 54.0
'76.8
-16.- Unit Capacity Factor (Using L.,)
0. Q,,_,
52.6
'74.7
)
9 117.. Unit Capacity Factor (Using Design NWe) 0.0 51.0
'72.1' j
- 18. Unit Forced' Outage Rate 0.0 3.' 3 4.5-l l
- 19. Shutdowns Scheduled-Over Next 6 Months (Type, Date, and Duration of each): N/A l. 20. If Shut Down at End of Report Period, Estimted Date of Startup 05/16/90 L
Nolf Creek Generating Station
'~
Monthly Operating Report April 1990:
Page 2 of 5 l
. ~. -. -
e 1
r f'
s
.Attac.hment to NO'90-015)<
l-
- AVERAGE DAILY INIT POWER LEVEL
.j DOCIGT NO.o 50-482 NOLF CREEK GENERATIIG STATICM N37 CREEK NUCLEAR CPERATDG CCRPCRATICH f
DATE 05-01-90
(%MPLETED BY M. N1111ams TELEPH:ME 316-364-8831 3Dml Atril, 1990i r
DAY AVBRAGE DAIIX PCMER LEVEL DAY AVERAGE DAIIX PCMER IEVEL (MNe-Nst)
' (NNe-Net).
L 1
0 17 0
-i 2
0-18' O
3 0
19 0
.4 0
.20
~0
.5 0
21 0
L.
'6 0
22 0
L 7
0 23 0-
"t l=
8 0
~24 0
9 0
25 0
.i 10 0
26' 0-11-0 27 0
12.
0 28 0
13 0
29-0
'I 14 0'
30-0 15 0
31-0-
16 0
Wolf Creek Generating Station Monthly Operating Report April 1990 Page 3 of 5
..--. x..
..m...
Attachment to NO 90-0151
[
~
UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.-
50-482 WOLF CREEK GENERATING STATION:
WOI.F CREEK NUCLEAR OPERATING CORPORATION.
DATE 05-01-90 COMPLETED BY M. Williams-REPORT MONTH April. 1990 TELEPHONE 316-364-8831 TYPE METHODS SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRFCTIVE ACTIONS /C0f9fENTS No Date S: SCHEDULED (HOURS)
(1)
OR REDUCING POWERf2) 3 900401 S
719 C
4 Continued scheduled refueling outage.
i 3
-l SmasARY: The unit remained in a refueling outage throughout the month.
L
- 1) - REASON: A: EQUIPMENT FAILURE (EXPLAIN) E OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:
1.
MANUAL.
B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2.
MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR-(EXPLAIN) 3.
AUTOVATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.
CONTINUED 5.
REDUCED LOAD 9.
OTHER Wolf Creek Generating Station Monthly Operating Report April 1990 Page'4 of 5' b
r-m w
^ - ' - - -
. x.;;, y u
'Attachmen't to NO 90-0151 -
i
,, c q
WOLF CRl!EK NUCIEAR OPERATDU 02PCRATICE W3E CREEK Gl!NERATDG S'DLTICN j
UNIT NO. 1 l
K NNI'Anril' 1990 j
SW9ARY OF OPl!RATDG EXPERIENCE
.. e w
LiCted below in chronological sequence is a sunmary of operating experiences for this nonth 4
~
which required load reduction or resulted inlsignificant-non-load related incidents..
1 JEl3
.TDIE
.EER J
L April'1, 1990 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> All fuel removed frun the reactor vessel.
[
April 9, 1990 2324 hours0.0269 days <br />0.646 hours <br />0.00384 weeks <br />8.84282e-4 months <br /> Began reloading fuel into the reactor vessel'..
Entered Mode 6 - Refueling.
iApril 15, 1990-0231 hours Fuel reloadM ete.
{
l April 26,11990-1441 hours Reactor vessel head in place and. tensioned.; Entered'-
Mode 5 - Cold Shutdown.-
April 30,1990 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Continuing Refueling Outage activities.
.i l
l-i 5
(.
j -.
j Wolf Creek Generating Station-L Monthly Operating Report i
April'1990 L
Page 5 of 5-L i
e s
r
.-n-,
m e,-.-
e a