ML20034C880

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1990 for Wolf Creek Generating Station
ML20034C880
Person / Time
Site: Wolf Creek 
Issue date: 04/30/1990
From: Bailey J, Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
90-0151, 90-151, NUDOCS 9005180048
Download: ML20034C880 (7)


Text

.. -

~

j W$4.F CREEK NUCLEAR OPERATING CORPORATION John A, Bailey Vice Proendent May-15, 1990 l --

NO 90-0151

-l B[

-U S. Nuclear Regulatory Consnission

)

i ATTN: Document Control Desk Hall Station P1-137

l Washington, D. C.

20555 t

Subject:

Docket No. 50-482: April'1990. Monthly Operating 5

Report Gentlemen Attached is the April 1990, Monthly-Operating Report 'for Wolf Creek Generating Station.

This submittal is being made in accordance with the requirements of Technical-Specification 6.9.1.8.

s

-Very truly yours,-

i John A. Bailey k

-Vice President Nuclear Operations JAB /jra Attachment l

cc: R. D. Martin (NRC), w/a D. Persinko (NRC), w/a D. V. Pickett (NRC), w/a M.'E. Skow (NRC), w/a

, r l

l 9 O h[i [ h U(l[+ h LOUU3h POR ADUii~ M"O M 32

'l R

F Di:

i RO. Box 411/ Builington, KS 86839 / Phone: (316) 364-8831

/

l An Equal Opportunity Ernpoyer MFMC/ VET -

gk

Y i

90-0151' fi

. Attachment to NG

~. f a

ti A

)

- i NOIE CREEK NUCLEAR OPERATING CWPCRATIN 1-WOLF CREEK GENERATING STATI N '

?i M N mLY OPERATING REPORT

(

c 20tmi:

Anril-YEAR:=,_192Q j

Docket No.a 50-482 r

Facility Operating l License No.: NPF-42 I

Resort No.,__j2_

[

}

l i

.Lf y

i 4

l:..

l:

- i Prepared by:

-i 1

Merlin G. Williams a

i i

+ +

l '.-

Lm 4

1 o

i a

.i--

..,,,, -. -., ~

n,7 l '-

Attachment to N0 90-0151 -

l....

u SLHORY l,

I

! ~

'Ihe following repod. highlights the ' operating experience of Wolf Creek Generating Station for the month of April, 1990. 'Ihis apu.i. is being provided pursuant to Technical Specification 6.9.1.8.

I I.-

SlMURY OF CPIRATING EXPERIENCE Ihe unit remained shutdown for refueling throughout the month. Reloading of

!~

fuel into the reactor vessel was started cn April 9,1990 (entered Mode 6 -

Ref mling and ocupleted April'.15,1990. 'the reactor vessel head was in place atd)the studs-tensioned on April 26, 1990 (entered Node 5 -' Cold:.

Shutdown).

i l

II. MMCR SAFETY REIATED MAINI'ENANCE ACTIVITIES '

1.

Eddy current testing on Steam Generators "B" and "D".

i 2.

24-hour reliability runs en Energency Diesel Generators.

3.

Ccmpleticn of pump and valve Inservios Inspection-(ISI).,

1 L

4.

Par = ira to containment coolers.

5.

Reconstitution of one fuel assembly.

6.

Turbine <iriven anviliary feedwater pump overspeed' test..

e, I

i i

L I

}

.f i

i Wolf Creek Generating Station Monthly Operating Report April 1990 Page 1 of 5 t

?

(

~

m-Attachment to N0'90-0151 OPERATIN3 DMR REKRT b

DOCKET No.'

50-482

^

NCLF CRIEK GENERATDG S'5LTION:

[

NCLF CREEK NUC[JER CPIRATDG (XRPGUGION-l DME 05-01-90 CXMPLETED BY M. Milliams TilLBPH3E 316-364-8831 3

l CPERATDG STMUS 1,

Reporting Period:

Anril,1990

' Gross Hours-in Reporting Period: 719

'2.

Currently Authorized Power Imvel(left):,_3111 Max.-Depend. Capacity ()Ste-Net),,J1]E Design Electrical Rating (IP.4-Net): 1170 3.

Power Imvel to'Nhich Restricted (If Any)(190s-Net):'

N/A 4.

Reasons for restriction (If Any):

N/A N

4

'!his lenth - Yr. to Date. Cumlative 5.

N eber of Hours Reactor was Critical 0.0 1577.3 31,876.7-

6.

Reactor Reserve Shutdown Hours 0.0 0.0-339.8

[

l 7.

Hours Generator on Line 0.0 1554.7 31,341i8 si i

.i l

8.

Unit Reserve Shutdown Hours 0.0 0,0 '

0.0 J

'9.

Groes '1herml Enagy Generated (M*O O

5,152,108 103,629,363-

.[

10. Gross Electrical Energy Generated (1961) 0 1,796,240. -36,075,187-
11. Net Electrical Energy Generated (196H) 0 1,718,523
34',440,894
12. Reactor Service Factor 0.0

'54.8 78.1

13. Reactor Availahility Factor 0.0 54.' 8 -

78.9-j ju.14. Unit Service Factor 0.0 '

54.0

-76.8 i

jE15. Unit Availability Factor 0.0 54.0

'76.8

-16.- Unit Capacity Factor (Using L.,)

0. Q,,_,

52.6

'74.7

)

9 117.. Unit Capacity Factor (Using Design NWe) 0.0 51.0

'72.1' j

18. Unit Forced' Outage Rate 0.0 3.' 3 4.5-l l
19. Shutdowns Scheduled-Over Next 6 Months (Type, Date, and Duration of each): N/A l. 20. If Shut Down at End of Report Period, Estimted Date of Startup 05/16/90 L

Nolf Creek Generating Station

'~

Monthly Operating Report April 1990:

Page 2 of 5 l

. ~. -. -

e 1

r f'

s

.Attac.hment to NO'90-015)<

l-

- AVERAGE DAILY INIT POWER LEVEL

.j DOCIGT NO.o 50-482 NOLF CREEK GENERATIIG STATICM N37 CREEK NUCLEAR CPERATDG CCRPCRATICH f

DATE 05-01-90

(%MPLETED BY M. N1111ams TELEPH:ME 316-364-8831 3Dml Atril, 1990i r

DAY AVBRAGE DAIIX PCMER LEVEL DAY AVERAGE DAIIX PCMER IEVEL (MNe-Nst)

' (NNe-Net).

L 1

0 17 0

-i 2

0-18' O

3 0

19 0

.4 0

.20

~0

.5 0

21 0

L.

'6 0

22 0

L 7

0 23 0-

"t l=

8 0

~24 0

9 0

25 0

.i 10 0

26' 0-11-0 27 0

12.

0 28 0

13 0

29-0

'I 14 0'

30-0 15 0

31-0-

16 0

Wolf Creek Generating Station Monthly Operating Report April 1990 Page 3 of 5

..--. x..

..m...

Attachment to NO 90-0151

[

~

UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.-

50-482 WOLF CREEK GENERATING STATION:

WOI.F CREEK NUCLEAR OPERATING CORPORATION.

DATE 05-01-90 COMPLETED BY M. Williams-REPORT MONTH April. 1990 TELEPHONE 316-364-8831 TYPE METHODS SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRFCTIVE ACTIONS /C0f9fENTS No Date S: SCHEDULED (HOURS)

(1)

OR REDUCING POWERf2) 3 900401 S

719 C

4 Continued scheduled refueling outage.

i 3

-l SmasARY: The unit remained in a refueling outage throughout the month.

L

1) - REASON: A: EQUIPMENT FAILURE (EXPLAIN) E OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:

1.

MANUAL.

B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2.

MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR-(EXPLAIN) 3.

AUTOVATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.

CONTINUED 5.

REDUCED LOAD 9.

OTHER Wolf Creek Generating Station Monthly Operating Report April 1990 Page'4 of 5' b

r-m w

^ - ' - - -

. x.;;, y u

'Attachmen't to NO 90-0151 -

i

,, c q

WOLF CRl!EK NUCIEAR OPERATDU 02PCRATICE W3E CREEK Gl!NERATDG S'DLTICN j

UNIT NO. 1 l

K NNI'Anril' 1990 j

SW9ARY OF OPl!RATDG EXPERIENCE

.. e w

LiCted below in chronological sequence is a sunmary of operating experiences for this nonth 4

~

which required load reduction or resulted inlsignificant-non-load related incidents..

1 JEl3

.TDIE

.EER J

L April'1, 1990 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> All fuel removed frun the reactor vessel.

[

April 9, 1990 2324 hours0.0269 days <br />0.646 hours <br />0.00384 weeks <br />8.84282e-4 months <br /> Began reloading fuel into the reactor vessel'..

Entered Mode 6 - Refueling.

iApril 15, 1990-0231 hours Fuel reloadM ete.

{

l April 26,11990-1441 hours Reactor vessel head in place and. tensioned.; Entered'-

Mode 5 - Cold Shutdown.-

April 30,1990 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Continuing Refueling Outage activities.

.i l

l-i 5

(.

j -.

j Wolf Creek Generating Station-L Monthly Operating Report i

April'1990 L

Page 5 of 5-L i

e s

r

.-n-,

m e,-.-

e a