Special Rept:On 900328,electrical Penetration Seal Inoperable for Greater than 7 Days.Caused by Failure to Complete Mod Work within Time Frame.Electrical Penetration Seal Repaired & Returned to Operable Svc on 900416
ML20034C565
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 04/25/1990
From: Diederich G
COMMONWEALTH EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 9005040146
Download: ML20034C565 (1)


Text

.

1

4 CommInIcelth Edison -

LaSalle County Nuclear Station Rural Route #1, Box 220 Marseilles, Illinois 61341 Telephone 815/357 6761 April 25, 1990 l

Mr. A. 5.-Davis Region III Administrator U.S. Nuclear Regulatory Commission 799 Roosevelt Road-olen Ellyn, Illinois 60137

Dear Bir:

l This special report is submitted in accordance with LaSalle Units 1 and 2.

Operating Licenses MPF-11 and NPF-18 respectively, Appendix A, and Technical specifications 3.7.6 and 6.6.c.

On March 28,'1990, at.2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />, with Unit 1 in Hot shutdown and Unit 2 defueled, a control Room floor electrical _ penetration seal was rencved to allow the rerouting of cables. This work was. required for the completion of a Human Factors Modification.

~

This electrical penetration seal was inoperable for greater-then seven days, exceeding the 7 day period allowed by Technical Specification <3.7.6 prior to requiring a special report.- The 7 day. limit was exceeded because the modification work could not be completed within this. tine' frame;- To assure-that the level of fire protection did not decrease during the course of this event, LaSalle met the requirements of Action Statement "a"~of Technical specification 3.7.6 by verifying fire detection on at least.one side of the affacted assembly to be operable and establishing an~ hourly fire watch.

The electrical penetration seal was repaired and returned to operable service i

on April 16, 1990 at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />.

f

-l f'[O.'J.Diederich

-kO Station Manager.

\\

Lasalle county station GJD/OB/kg xc: Nuclea'r Licensing Administrator l