UNITED STATES
'g q
NUCLEAR REGULATORY COMMISSION 5
W ASHINGT ON, D. C. 70565 k*****
May 2, 1990 The Honorable Carl Levin United States Senate Washington, DC 20510
Dear Senator Levin:
I am pleased to provide you with infortnation regarding your letter of April 10, 1990 in which you enclosed a letter from Mr. James K. Middlemas, Sr., of Monroe, Michigan. You asked us to look into Mr. Middlemas' request for the disclosure ofallreportspreparedbytheInstituteofNuclearPowerOperations(INPO)that evaluate the adequacy of operations at the re?mi-2 nuclear power plant.
Following the 1979 accident at the Three Mile Island plant, the 55 utilities owning and operating nuclear power plants joined together to create INP0 as an organization dedicated to upgrading the quality of operations and safety performance at nuclear power plants. One of INP0's primary methods of achieving improved performance is through the conduct of periodic, comprehensive team evaluations at all reactor facilities. During such an evaluation, a team, which typically consists of 10 to 15 persons experienced in all aspects of nuclear operations, spends several weeks at both the plant and the corporate office interviewing the utility staff, examining records, and conducting independent inspections. With the information gathered from these activities, the inspection team provides a written report to the utility, which contains the strengths and weaknesses that the team observed.
The utility is required to report back to INPO on the steps that they plan to take to address the observed weaknesses. Then INPO reviews these items during subsequent evaluation visits.
INPO has taken the position that their reports should not be made public.
By treating the reports as proprietary information, member utilities will feel free to accept and answer condid reports of weaknesses without becoming defensive and argumentative. The NRC has accepted and agreed with this position, especially because we are able to review the reports upon their issuance.
While INPO does not make its evaluation reports public and is not required to submit them to the NRC, our staff reviews these reports onsite at each reactor facility. This review is normally conducted by one of our resident inspectors who is assigned fulltime at each licensed power reactor. The NRC reviews the reports to ensure that they do not contain any significant adverse safety information that was not previously known to us tMCugh our comprehensive inspection program.
In addition, we require every utility to directly notify us of any INPO finding that indicates a condition that the utility's license requires them to report to the NRC.
)
nrwa28@
'g n
.o The Honorable Carl Levin Thus, while there is no requirement that INPO evaluation reports be disclosed to the public, we believe that the public tefety is being well served through the industry's INPO self-assessrent initiative, through NRC's direct inspection program, and through our ongoing review of INPO activities.
I trust that this information will be useful to you in responding to Mr. Middlemas. Please let me know if I can be of further assistance.
Sincerely, Odginal Signed Bys James M. Taylor '
James M. Taylor Executive Director for Operations
Enclosure:
Incoming letter dated March 18, 1990 DISTRIBUTION:
DUCTITTRT w/ incoming JSniezek NRC & LOCAL PDRs w/ incoming HThompson EDO #5372 JBlaha ED0 R/F ABDavis, Rill TMURLEY/fftIRACLIA JPARTLOW GHOLAHAN OGC SECY(90-0308)
JTAYLOR DMOSSBURG,(ED0/5372)w/ incoming MKREBS JSTANG w/ incoming PSHUTTLEWORTH PD31 R/f JZWOLINSK1 GPA/CA See previous concurrence
- LA/PD31:DRSP*
Pt M1;DRSP*
(A)D/PD31:DRSP*
TECH EDITOR
- AD:DRSP3*
PSHUTTLEWORTH J
,C 7 D 11 ANNI JMAIN JZWOLINSKI 4/19/90 4 9/90
/20/90 4/20/
4/23/90 (A):
SP ADP:HRRN 0
p(/)4 GHOL HAN JPARTLO4 TMUl LEY AY.OR m (g s
4/' / 0 4/ /90 4p90
'j/90
.Vg2)'P FERMI GT 5372
IT,, e y e
e The Honorable Carl Levin United States Senate Washington, D.C.
20510
Dear Senator Levin:
I am respondin6 to your letter of April 10, 1990, in which you enclosed a letter from Mr. James K, Middlemas, Sr., of Monroe, Michigan. You asked us to look into Mr. Middlemas's request for the release of all Institute of Nuclear Power Operations (INPO)\\reportsonFermi-2.
1 am enclosing a co\\py of the October 20, 1988 Memorandum of Agreement between INPO and the U.S. Nuclear Regulatory Commission (NRC).
Paragraph 3.a of Appendix Number Two indicates that INPO reports will be made available for review or reading by the NRC; however, the NRC cannot possess the reports. The reports are not submitted to the NRC, and thus the NRC is not in the position of being able to furnish'!NPO reports on Fermi-2 to anyone.
If I can be of any further\\assistance, please contact me.
Sincerely, N\\
'N James M. Taylor Executive Director for Operations
Enclosure:
\\
As stated
\\
DISTRil1UT10N
\\
DOCAET FILE J. TAYLOR
\\
NRC & LOCAL PDRs w/ incoming D. MOSSBURG, (E00#5372)\\w/ incoming EDO #5372 M. KREBS EDO R/F J. STANG w/ incoming T.HURLEY/F.MIRAGLIA P. SHUTTLEWORTH J, PARTLOW PD31 R/F G. HOLAHAN J. ZWOLINSKI OGC GPA/CA SECY(90-0388)
- PREVIOUSLY CONCURRED LA/PD31:DRSP*
PM/PD31:DRSP* (A)D/PD31:DRSP*
TECH EDITOR
- AD:DRSP3*
PSHUTTLEWORTH JSTANG DDIIANNI JMAIN JZWOLINSKI 4/19/90 4/19/9 4/20/90 4/20/90 4/23/90 po (A)D:DRSP ADP:NRR D/NRR EDO
[
GHOLAHAN JPARTLOW TMURLEY.
JTAYLOR 4/ /90 4/ /90 4/ /90 4/ /90 M
FERMI GT 5372
i i
The Honorable Carl Levin United States Senate i
Washington, D.C.
20510 l
Dear Senator Levin:
c I am responding \\o your letter of April 10, 1990, in which you enclosed a letter l
from Mr. Ja'nes K.\\Middlemas, Sr., of Monroe, Michigan.
You asked us to look Operations (INPO)lsrequestforthereleaseofallInstituteofNuclearPower into Mr. Middlemas i
reports on Termi-2.
I am enclosing a copy.of the October 20, 1988 Memorandum of Agreement between INPO and the U.S. Nuc1' ar Regulatory Commission (NP.C). Paragraph 3.a of e
Appendix Number Two indi ates that INPO reports will be made available for review or reading by the C; however, the NRC cannot possess the reports.
The reports are not submitted o the NRC, and thus the NR0 is not in the position a
of being able to furnish IN reports on fermi-2 to &nyone, j
If I can be of any further ass stance, please contact me.
Sincerely, James M. Taylor Executive Director for Operations
Enclosure:
v As stated DISTRIBUTION DOCKET FILE J. TAYLOR NRC & LOCAL PDRs w/ incoming D. MOSSBURG, (E00#5 2)w/ incoming EDO #5372 M. KREBS EDO R/F J. STANG w/ incoming JDlaha T.MURLEY/F.MIRAGLIA P. SHUTTLEWORTH ABDavis, Rill l
J. PARTLOW PD31 R/F Russell G. HOLAHAN J. ZWOLINSKI Dbrutchfield OGC GPA/CA FGiKespie i
i SECY(90-0388)
JSniezek
~
- PREVIOUSLY CONCURRED LA/PD31:DRSP*
PM/PD31:DRSP* (A)D/PD31:DRSP*
TECH EDITOR
- AD:DRSP3*
PSHUTTLEWORTH JSTANG DDllANNI JMAIN JZWOLINSKI i
4/19/90 4/19/90 4/20/90 4/20/90 4/23/90 0
&)pp'iAN
- ADP:NRR D/NRR EDO R
LA PARTLOW TMURLEY JTAYLOR
/90 4/ /90 4/ /90 4/ /90 DD:NRR FMIRAGLIA 4/ /90 FERMI GT 5372
The Honorable Carl Levin United States Senate Washington, D.C.
20510
Dear Senator Levin:
i I am responding to your letter of April 10,1990, in which you enclosed a letter from Mr. Janiet K. Middlemas, Sr., of Monroe, Michigan. You asked us to look i
into Mr. Middlemas's request for the release of aie institute of Nuclear Power Operations (INPO)reportsonFermi-2.
\\
I am enclosing a copy of the October 20, 1988, Memorandum of Egreement between i
1 INPO and the U.S. Nuclear Petulatory Commission (NRC). Paragraph 3.a of-Appendix Number Two indicates that litPO reports will be made available for review or reading by the NRC; however, the NRC cannot possess the reports. The'-
t reports are not submitted to the NRC, and thus the NRC is not in-the position of being able to furnish INP0 reports on Fermi-2 to anyone.
IfIconbeanyfurtherasskstence,pleasecontactme.
\\
Sincerely,
(
k
\\
James M. Taylor
\\
Executive Director
\\
for Operations
Enclosure:
As stated DISTRIBUTION DOCKET FilF J. TAYLOR NRC & LOCAL PDRs w/ incoming D.M0SSBURG,(ED0#5372)w/ incoming EDO (5372 M. KREBSi EDO R/F J. STANG'w/ incoming i
T.HURLEY/F.MIRAGLIA P. SHUTTLEWORTH
~ PARTLOW PD31 R/F G. HOLAHAN J. ZWOLINSKI 000-
'GPA/CA j/
SECY (90-0388)
LA/PD31:DRSP PM/PD31:DRSP (A)D/PD31:DRSP TECH EDITOR AD:DRSP3 PSHUTTLEWORTH JSTANG DDilANNI JMAIN JZW.INSKI 4/19/90 4/19/90 4/20/90 4/20/90 4/
90.
(A)D:DRSP ADP:NRR D/NRR ED0-GHOLAHAN JPARTLOW THURLEY JTAYLOR 4/ /90 4/ /90 4/ /90 4/ /90 DD:NRR FMIRAGLIA 4/ /90 FERMI GT S372 h
,5 *,
p
\\
.s The Honorable Carl Levin United States. Senate Washington, D.C.
20510 4
Dear Senator Levin:
I am responding to your letter of April 10, 1990, in which you enclosed a letter from fir. James K. Middlemas, Sr., of tionroe,111chigen.
You asked us to look into 11r. Middlemas's reauest for the release of all Institute of Nuclear Power Operstions(INPO)reportsonFermi-2.
I am enclosing a' copy of the October 20, 1988, Memorandum of Agreement between INPO and the U.S. Nuclear Regulatory Cennission (NRC).
Paragraph 3.a of Appendix Humber Two indicates that It!PO reports will be made available for review or reading by the NRC; however, the NRC cannot possess the reports. The reports are not submitted to the NRC, and thus the NRC cannot furnism any INP0 reports on Fermi 2 to anyone.
If I can be any further assistence, please contact ne.
Sincerely, i
James M. Taylor Executive Director for Operations
Enclosure:
As stated l
DISTRIBUTION DOCKET FILE J. TAYLOR NRC & LOCAL PDRs w/ incoming D.110SSBURG, (EDO#5372) w/ incoming EDO #5372 H. KREBS EDO R/F J. STANG w/ incoming l-T.HURLEY/F.111RAGLI A P. SHUTTLEWORTH I
J. PARTLOW PD31 R/F G. HOLAHAN J. ZWOLINSKI OGC GPA/CA SECY(90-0388)
Q(ik 7HUA/
f LA/PDS1:DRSP g/,
PM/P 1:DRSP (A)D/PD'31:DRSP TECH EDITOR AD:DRSP3 PSHUTTLEWORTIF' JSTf90 DDIIANNI RSANDERS -
JZWOLINSKI 4//I/90 4/'
4/ 0/90 4/p/90 20 4/ /90 1
(A)D:DRSP ADP:NRR D/NRR ED0 GHOLAHAN JPARTLOW TMURLEY JTAYLOR 4/ /90 4/ /90 4/ /90 4/ /90 FERMI GT 5372 l
. b lN _
{
4
. '9, -
UNITED STATES'
/
NUCLEAR RECULATORY COMMISSION
^
- $. j., g W ASHINGTON, D. C. 20555
,(
/
EDO Principal Correspondence Control _
l FROM:
DUE: 04/26/90 EDO CONTROL: 0005372 DOC DT: 04/10/90 FINAL REPLY:
SEN CARL LEVIN l-TO:
CA j
l FOR SIGNATURE OFi
- ORN CRC NO: 90-0388 I
i EXECUTIVE DIRECTOR 7
DESC:
ROUTING:
ENCLOSES LETTER FROM JAMES K. MIDDLEMAS SR.
TAYLOR j REQUESTING NRC RELEASE ALL INPO REPORTS ON SNIEZEK t
FERMI II THOMPSON /
BLAHA' DATE: 04/16/90 DAVIS, RIII ASSIGNED TO:
CONTACT:
.NRR HURLEY IPEdIA15 INSTRUCTIONS [,.. h --
ORnRENARKS.:3g
....,_ m,
RETURNiINCOMING W/ REPLY;.AND:MARKsENVELOFE TO f
. lATTN J OFN DI ANAlDEARMINn 'M u
O d;f[1 l
^
NRR RECEIVED:
APRIL 17, 1990
$ ACTION:M 7: O -^ ^ ^- " e e
OIS,YOlLb4 n f
A
/(i NRR ROUTING:
MURLEY/MIRAGLIA PARTLOW J
I RUSSELL /
f l
9 l
CRUTCHFIELD '
Y'S
[d GILLESPIE /
J 8
/
$ [P (
,f MOSSBURG
,4
'Y
/
hL A
D ACTIO_N
( [3 l
I DUE TO NR D!RECJ"4
$ $3
?$
hi BY
/
c._
,1 i
i, fo :.
l OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET i
' PAPER' NUMBER:
CRC-90-0388 LOGGING DATE: Apr 16 90 ACTION OFFICE:
' AUTHOR:
Carl Levin (Sen. )
AFFILIATION:
UNITED STATES SENATE LETTER DATE:
Apr 10 90 FILE CODE:
SUBJECT:
Constituent's' letter concerning hearings of the House Subcommittee on Nuclear Power Regulations ACTION:
Direct Reply DISTRIBUTION:
OCA to Ack.
SPECIAL HANDLING: None NOTES:.
DATE DUE:
May 1 90 SIGNATURE:
DATE SIGNED:
AFFILIATION:
i l
i Roc'd Off. E00 Date Y - l 4 ' *l 0 Time
$!h 0 0 l
l EDO --- 005372 i