ML20034C248
| ML20034C248 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 04/24/1990 |
| From: | John Miller Office of Nuclear Reactor Regulation |
| To: | Calvo J Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 9005020222 | |
| Download: ML20034C248 (3) | |
Text
-
j r
- Apr'il 24,.1990 l c.
MEMORANDUM FOR: Jose A. Calvo, Chief.
Technical Specifications Branch Division-of-Operational Events Assessment Branch NRR THRU:
Richard L. Emch.-Jr..-Section Chief Review and Assessment Section Technical Specifications Branch Division of Operational Events Assessment Branch. NRR FROM:
James R. Miller Reactor Engineer Review and Assessment Section Special Projects Section Technical Specifications Branch, NRR-
SUBJECT:
MINUTES OF APRIL 10, 1990 MEETING WITH STS LEAD PLANTS-At the request of the STS lead plants OTSB and the lead plant PM's met with the lead plant utilities to discuss several items of mutual interest. An~
?
attendance li3t is attached.
4 The main item of interest to the lead plants was the processing of their individual emendment requests; including Sholly processing, review procedure, a
review schedule and review end inspection of the new.TS implementation process.
The staff indicated that our process would essentially be the same as the.
process used to review any amendment, and would be consistent with 10 CFR Parts 50.91, 50.92 and with the.NRC's internal operating procedures (DLOP 228, as revised).
Two other issues discussed were:
1)
Implementation of the Hatch 1 amendn.ent, as a " follow-on-plant" and its relationship with Hatch 2:as a lead plant. The Staff ~ indicated that joint' implementation could be worked out.
- 2) Starting "new" or " tightened" surveillances with time "zero" being current l
at time of new TS implementation. The staff is considering the. industry's t
proposal and will develop en NRC position dur og the STS review.
e$
/
p ames R. Miller Senior Reactor. Engineer Review and Assessment Secticn Technical Specifications Branch Division of Operational Events Assessment, NRR Attachment DISTRIBUTION:
Please see attached l
Document Name: NEN0 TO J.A. CALVO 4/12 g..
p bEA:NRR
'F[
ff OTSB NRR C:0TSB:D0EA:NRR OT JR iller:cb RLEmch-JACalvo /YX 04/,1d/90 04/1f/90 04/lf/90 9005020222 900424 h
fh PDR ORG NRRB
lead Plant Meeting 04/10/90 I
Attendee Affiliation Jim Miller NRC/0TSB/NRR Ken Wilson FPC/CR3-Jim Eaton NUMARC Warren Hall NUMARC' 1
John Fowler SERI J. L. Robertson SERI J; C. Jones GPC-1 R. D. Baker GPC Joe.Hegner' Virginia Power j
Robert J. Giardina NRC/0TSB/NRR 1
'Jacquie Hinds-
-PG&E/WOG e
Mark Reinhart-NRC/0TSB/NRR.
<-j Thomas Mileod SCE j
Jose A. Calvo NRC/0TSB/NRR
-l Larry Crocker PM, Hatch NRC R. Auluck PM, Watts Bar. NRC o
L. Kintner PM, Grand Gulf NRC-l K. R. Cotton NRC/0TSB/NRR Rich Emch NRC/0TSB/NRR i
1y i
l i
- l 3
i l
j
)
l
]
--o t
I
,4 DISTRIBUTION:.
OTSB R/F DOEA R/T wa 0 entre 1*M1bs" t
TEMurley PDR i
FJMiraglia
~ WTRussell'
- CERossi
- JCalvo-RLEmch JRM111er CHBerlinger PWDaranowsky-OTSB Members I
t t
i r
i i
-w
')
k e
l~
1 l
l l.
.i
,