ML20034B305
| ML20034B305 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/31/1989 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9004260354 | |
| Download: ML20034B305 (3) | |
Text
t Alabama Power Company 40 inverness Cant:r Parkway Rost Office Dox 1295 Birmingham. Alabama 35201 e
e' letophone 205 86G5581 W. G. Hairston, lit Senior Vice President Nuclear Operations AlabamaPower the southem electnc system April 18,1990-Docket Nos.
50-348 50-364 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C.
20555 Gentlemen:
Joseph-M. Farley Nuclear Plant 1989 Annual Environmental Operatina Report (Nonradioloaical)
Enclosed in accordance with Subsection' 5.4.1 of the' Joseph M. Farley.
Nuclear Plant Environmental. Protection Plan (Units 1 and 2), Appendix B to Facility Operating License Nos. NPF-2 and NPF-8, is the report summarizing implementation' of the Environmental Protection Plan during the calendar-year 1989.
If you have any questions, please advise.
. Respectfully submitted,
,g/ W rs.
,I WGH,III/ JAM:db913 Enclosure cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell 9004260354 891231 PDR ADOCK 05000348 R
PDC I
i
a s
?
ALABAMA POWER COMPANY JOSEPH M. FARLEY NUCLEAR PLANT - UNITS 1 AND,
NRC DOCKET NOS. 50-348 AND 50-364 FACILITY OPERATING LICENSE NOS. NPF-2 AND NPF-8 l
ANNUAL ENVIRONMENTAL OPERATING REPORT FOR 1989 (NONRADIOLOGICAL)
L h
i P
k e
1 k
e
m 4
)
JOSEPH M. FARLEY NUCLEAR-PLANT - UNITS 1 AND 2 ANNUAL ~ ENVIRONMENTAL OPERATING REPORT FOR 1989.(N0NRADIOLOGICAL)
INTRODUCTION In accordsnce with Subsection 5.4.1 of the Joseph M.' Farley Nuclear Plant Environmental Protection Plan (Units 1 and 2), Appendix B to Facility Operating.Licei,se Nos. NPF-2 and NPF-8, this report is submitted summarizing' implementation of t5e Environmental Protection Plan for the calendar' year =
l 1989.
REPORTING REQUIREMENTS The following is submitted in accordance with Subsection 5.4.1 of the Environmental Protection Plan:
A.
Environmental Protection Plan (EPP) Noncompliances and Corrective Actions There were no EPP noncompliances during 1989.
B.
Changes in Station Design or Operation, Tests, and Experiments Made in Accordance with EPP Subsection 3.1 which Involved a Potentially:
Significant Unreviewed Environmental Issue There were no changes in station design or operation, tests, or experiments during 1989 which involved a potentially significant unreviewed environmental question.
C.
Nonroutine Reports Submitted in Accordance with EPP= Subsection 5.4.2 1
There were no nonroutine reports submitted during 1989.
l i
.j t-L
.