_ __
)
j u.s. MuctaAn neouLATony coussesse0N e
lj I, ".".* "
CERTIFICATE CF CSCPLIANCE FOR RADIOACTIVE MATERIALS PACKAGES l
sacra ft j
l o arva'oa "u"*5a
- " " ^ ^ * * ' ' " ' ' ' ' ' ' " " " " ' ' "
' ' ' ' ' " " " * ' " ' ' ' ' ' ' " " " ' ' " " ^ "
gossire. cars uussa l
l 9787 1
USA /9787/B(U)F 1
3 l,
certificate is tesued to certify that the packagmg and contents desertbed in item $ below, meets the applicable se fety standeras set forth in Title 10. Cod j
of Federet Regulations. Port 71, *Packagmg and Transportation of Hadioactive Ideternet I
- b. This certificate does not reiseve the consignor from complance with any quirement of the regulations of the U S. Deperiment of Transportation or other j ]
I applacebee regulatory agencies, including the govemment of any country chrough or into which the package will be transported.
I J
I i l l
3 m eear,, care is meuso on me naam or a sarrTv amatvsm,arg,7gTg7c,yg8jf;l,oda,JsTA*c,,,,
I I
J !
et issuso To tamme sair Asweest I
i '
I i
I Bettis Atomic Power Laboratory A1W-3 Power Unit Shipping Container Safety i
I P.O. Box 79 AnalysisReportforPackaging(assupplemented).
I !
lWest Mifflin, PA 15122 hh hIUi' k,
$ Menet wuweta 71.67p7'
+
cart ficato is conditional upon, fulfilling the equirements of 10 CFFI Part 71, se applicable, and the conditions specified below.
i I
I I
6.
l l
l l
(a) Packaging l:
I
~
I (1) Model No.: A1W-3PowerUnitShippingContainer(PUSC)
!l l
m, I
(2) Description l
The package is.a ri circular.cylindiical steel weldment. A module i
support device,,a puncture protection' cover,and an energy absorber are j
s attached to the top'end of;dapter flange with two 3-inch diameter the package. The module support device is l
I secured to the power unit ~a i
i shipping'studsandisboltedto'theupperclampandcradleassembly(with with l
l forty 2.25-inch diameter assembly studs. Module support cylinders i
lockingnuts)andcontrolrodholddowndevicespreventfuelmoduleor I
control rod motion. The top puncture protection cover, with 4-inch I
thick steel side walls and a 5-inch thick steel top plate, fits down I
over the eggerate assembly and attaches to the bottom plate of the j
model support device with; forty 2-inch diameter bolts. The top energy l
absorber, with an 80-inch' outer diameter, a 54-inch inner diameter, and l
i a height of 25 inches is welded to the top puncture protection cover.
I I
At the bottom end of the A1W-3 PUSC, a 4-inch thick steel puncture I
protection plate with a diameter of 50.5 inches is attached to the 1
l bottom of the power unit thermal shield by eight sets of U-bolts. A i
bottom energy absorber, with an 89.25-inch outer diameter, a 52.5-inch t
i inner diameter, and a height of 36 inches cover the bottom puncture I
protection plate and is attached to the thermal shield of the power unit I
with twelve 0.875-inch diameter bolts.
The support barrel, which is j
part of the power unit assembly, and a stainless steel plug / bard assembly, which extends around the outside of the support barrel, i
provide puncture protection for the sides of the power unit.
I I
h$
b$
7 1
l C
I l
l l ____________________-- ------------ ------------------
a.'
u*96Rp3184 U.S NUC' LEAS REGULATORY COMMI55 TON l
I l
I Page 2 - Certificate No. 9787 - Revision No.1 - Docket No. 71-9787-1 1 5.-
(a)(2)
. Description' (continued)
I 1
For shipment, the loaded A1W-3 PUSC is secured horizontally in a
]
I shipping pedestal. The shipping pedestal consists of a base on which two support beams are mounted horizontally with rubber shock mounts.
l-The base is bolted to the deck of a 300-ton railcar and to four stop i
l i
blocks which are welded to the railcar deck.
The PUSC is secured to the I
shipping pedestal using the upper clamp and cradle assembly and the 1
I cer.ter and lower yoke / saddle assemblies. The yokes span across the l
l upper side of the PUSC n D re
- o the support beams while the l
saddles suspend fr foltes
(-
e weight of the loaded 1
l PUSC. A 0.25 k railcar cover e M o enclose the entire-i i
A1W-3 PUSC pment.
7 I
The load
-3 PUSC (excluding-the shipping ped
- 1) ir 449 inches I
long, ha maximum diameter of 134 inches, and.we AA approximately j
397,00 ~ oun s.
/,f /g*
l (3)
Draks
[
l kageiseks tdi d q the draw pas, figures and The l
l ske s. included'is h( app)1 cation p$ients(seeRektknces,below).
o (b) Contentsb
.l
-[
s 4 ppbm bb ?
l/h6 '
iated'gt)I 3 pNek;en l
One unirr 3
FissileC1b@
b
'h k
l N
III (c) 7d6MIK Co l
trol rbd hokddown de/icesNm instal $d, in the power unit l 6.
Control rods and as described in t e lication. ' y
}3
/
~
l l 7.
In addition to the requ)f ments of Subpart G of 10 CFR rt'71:
9 l
(a)
ThepackagemustbeprepMd r shjpment Operating Procedures in Chapt '7 Ktif@,and[ operated in accor pplication.
i I
i I
(b) The packaging must meet the Acceptance Tests and Maintenance Program in l
Chapter 8 of the application.
l 8.
Expiration date: April 30, 1995 I
l l
I I
1 l
l l
l l
i.
4 i
l l....
.c.
hjp'e'84 u!s. rmetto atautu eny commssioO
- pw; :
I l
l Pagh 3 - Certificate No. 9787 - Revision No.1 - Docket No. 71-9787 l
l l
l l
REFERENCES I
.i E
l l
l A1W-3 Power Unit Shipping Container Safety Analysis Report for Packaging, I
I WAPD-RE0(c)-118,datedAugust1980.
l l
l I Supplemented _ dated:- A1W-3 Power Unit Shipping Container Modified Top Energy' Absorber l
l Revised Safety Analysis Report for Packaging,- Attachment 1 to WAPD-RE0(c)-118, dated I
i February 1985.
I I
l TR EdVqR REGULATORY COM 1
d' M fM l
I Charles E. MacDonald,' Ch I
I
' Transportation Branch
)
I 7
Division of Safeguards l
h and Transporta SS 4 l
l
'~
l APR 2 01990 D I
i Date:
p-
'p 4-r Q
l q
V
/(~
i sg O
I I
I I
1.2 g
l h
s w a 4 9, u,x ; I l
w l
a
[ j @w*
r n;t. v
~
f a. e, I
c^4
,p'
(
n 5
ll0, %
ka l
49;Q q jq y'
l s
h
- DfhI,
-i t
I l
' TAP 2%pi as) f O
l l
4 QQ%
l l
%g'O l
+
l j
>F yj g 4 4 l
l l
l l
l l
l l
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
1 I
I I
I I
I I
I I
i l
l l
l t
i I
l i
3
..J
-.jf'
%g
' UNITED STATES
' 'ra I
NUCLEAR REGULATORY COMMISSION -
- ..-y-
- ,y.
WASmGTON, D. C. 20555
%,....*l-L APPROVAL RECORD Model AlW-3 Power Unit Shipping Container Certificate of Compliance No. 9787 Revision No. 1 By letter dated January 26, 1990, the Division of Naval Reactors, U.S. Department-l
- of Energy. requested renewal of Certificate of Compliance No. 9787. No changes t
have been requested or made to the package since approval of-the original-i application dated August 1980, as supplemented February 1985.
The certificate of compliance has been. conditioned to require the' packaging-to be prepared, operated, and maintained in accordance with Sections 7 and 8 of the-original application.
The certificate of compliance has been renewed for_a five year term which expires April 30, 1995.
Y 1./$ f/4 Jf Charles E. Macdonald, Chief Transportation Branch' Division of Safeguards and Transportation, NMSS Date: