ML20034A827
| ML20034A827 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 04/17/1990 |
| From: | Walt T PORTLAND GENERAL ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20034A828 | List: |
| References | |
| NUDOCS 9004240396 | |
| Download: ML20034A827 (1) | |
Text
..-
1 o,.
.l
=,
5 1
April 17,'1990 i
i'j Trojan Nuclear Plant Docket 50-344 R
License NPF-1 1
i
[
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington D.C.
20555
Dear Sirs:
Topical Report BAW-10176.." Mark-BW
' Reload Safety Analysis for-Troian" Attached for review and approval is Topical Report BAW-10176, " Mark-BW' Reload Safety Analysis for the Trojan Nuclear Unit".
This document' summarizes the analyses for the non-Loss-of-Coolant-Accident (LOCA) transients and accidents. Approval of this report-is needed'to. support the use of Babcock and Wilcox (B&W) Fuel Company fuel for Trojan fuel cycle 14 ~
and beyond. The.first B&W fuel reload is scheduled for spring 1991; four demonstration assemblies are currently in'use.
Sincerely, T. D. Walt l
Acting ~Vice President, Nuclear Attachment c:
Mr. John B. Martin Regional Administrator, Region V i
U.S. Nuclear Regulatory Commission i
Mr. David Stewart-Smith State of Oregon j
Department of Energy i
Mr. R. C. Barr NRC Resident Inspector l
Trojan Nuclear Plant 9004240396 900417 PDR ADOCK 05000344 i
P PDC 121 SW Salmon Street Portiand. Oregon 97204~
If/-
l.
.