Forwards Topical Rept BAW-10176, Mark-BW Reload Safety Analysis for Trojan Nuclear Unit. Rept Summarizes Analyses for non-LOCA Transients & Accidents.Approval of Rept Needed to Support Use of B&W Fuel for Cycle 14 & Beyond
ML20034A827
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/17/1990
From: Walt T
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20034A828 List:
References
NUDOCS 9004240396
Download: ML20034A827 (1)


Text

..-

1 o,.

.l

=,

5 1

April 17,'1990 i

i'j Trojan Nuclear Plant Docket 50-344 R

License NPF-1 1

i

[

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington D.C.

20555

Dear Sirs:

Topical Report BAW-10176.." Mark-BW

' Reload Safety Analysis for-Troian" Attached for review and approval is Topical Report BAW-10176, " Mark-BW' Reload Safety Analysis for the Trojan Nuclear Unit".

This document' summarizes the analyses for the non-Loss-of-Coolant-Accident (LOCA) transients and accidents. Approval of this report-is needed'to. support the use of Babcock and Wilcox (B&W) Fuel Company fuel for Trojan fuel cycle 14 ~

and beyond. The.first B&W fuel reload is scheduled for spring 1991; four demonstration assemblies are currently in'use.

Sincerely, T. D. Walt l

Acting ~Vice President, Nuclear Attachment c:

Mr. John B. Martin Regional Administrator, Region V i

U.S. Nuclear Regulatory Commission i

Mr. David Stewart-Smith State of Oregon j

Department of Energy i

Mr. R. C. Barr NRC Resident Inspector l

Trojan Nuclear Plant 9004240396 900417 PDR ADOCK 05000344 i

P PDC 121 SW Salmon Street Portiand. Oregon 97204~