ML20034A595
| ML20034A595 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/31/1990 |
| From: | Keiser H, Keith Young PENNSYLVANIA POWER & LIGHT CO. |
| To: | Mcdonald W NRC |
| References | |
| NUDOCS 9004230551 | |
| Download: ML20034A595 (10) | |
Text
.
s.
PPal P0nnsylvania Power & Light Compcny-Two North Ninth Street
- Allentown, PA 18101
- 215/7745151 Harold W Kelser e or i President Nuclear g
Technical Specifications Section 6.9.1.6 APR 161990 l
Mr. William G. Mcdonald Director, Office of Administration and Resources Management U.S.
Nuclear Regulatory Commission Washington, D.C.
20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 j
PLA-3381 FILE R41-2A and 50-388/NPF-22
Dear'Mr. Mcdonald:
The March 1990 monthly operating reports for Susquehanna SES' Units 1 and 2 are attached.
Very truly yours, l
L l
H.
W.
Keiser Attachment vn.newxm m-an~ w "iDeskzysyNy w wdinal')
wqw isDocument1 Control ajo I
cc:
(
NRC Region I l
Mr. G.S. Barber, NRC Resident Inspector l
Mr. M.C. Thadani, NRC Project Manager 9004230551 900331 PDR ADOCK 05000387 R
$hSY
///
4 AVERAGE DAILY UNIT POWER LEVEL 3 838, %
1 I
DOCKET NO.
50-387 UNIT One L
J D
E O
DATE f
4-5-90 7
b
- ^*
g COMPLETED BY TELEPHONE (717)542-3251-a MONM March 1990
+
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NeO (MWo Neo i
1055 1042-g g7 1052 2
1naa
.18 3
1027 19 1osa 1043 4
20 933 1055 5
21 62 6
1099 513 22 7
1056 704 23 8
1055 24 i n9r, 9
1022 25 1053 10 994 26 1055 g3 1046 1055.
27 1041 1054-12 28 13 in1R 29 1055 14 1041 30 1019 15 1041 775-33 1038 16 INSRUC710NS On this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute o the nearest whole megawatt.
(9/77) s.
s Jox- @'y 1
_4_ ___
g t NE.
. --.r. J OPERATING DATA REPORT '
O k
DOCKET NO.
50-387 DATE 4-5-90 kg 9
- COMPLETED BY Y A. Young. ;
TELEPHONE f7171542-3251 OPERATING STATUS
- l. Unit Name:
Susquehanna Steam Electric Station Notes
- 2. Reporting Period:
March 1990 j
- 3. Licensed Thermal Power iMht s:
3293
- 4. Namepiste Rating (Gross MWel:
1152
- 5. Design Electrical Rating (Net MWel:
1050 j
- 6. Maximum Dependable Capacity (Gross MWe):
1069;3 l
.i
- 7. Maximum Dependable Capacity (Net MWel:
1032.7 i
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Gise Reasons:
No chances were made,
- 9. Power Level To Which Restricted. lf Any (Net MWe):
None
- 10. Reasons For Restrictions. If Any:
N/A This Month Yr..to.Date Cumulatise
- 11. Hours in Reporting Period 744 2160 59,737
- 12. Number Of Hours Reactor Was Critical 7d4
'1 M4 ?
45 4RR.5
- 13. Reactor Reserve Shutdown Hours 0^
0 1,032
- 14. Hours Generator On Line 732.3 1,908.7 44,510.1
!!. Unit Reserve Shutdown Hours 0
0 0
I.
- 16. Gross Thermal Energy Generated (MWH) 2.289.647 6.015.736 139.186,382
- 17. Gross Electrical Energy Generated (MWH) 751,378 1,980,114 45,43/,954
- 18. Net Electrical Energy Generated (MWH) 725,083 1,906,925 43,621,597
- 19. Unit Service Factor 98.4 88.4 74.5
- 20. Unit Availability Factor 98.4
_. 88.4 74.5
- 21. Unit Capacity Factor IUsing MDC Neti 94.4 85.5 70.7
- 22. Unit Capacity Factor (Using DER Neti 92.8 84.1 69.6
- 23. Unit Forced Outage Rate 1.6 11.6 9.6
- 24. Shutdowns Scheduled Over Next 6 Months iType, Date, and Duration of Eaeio:
4 Unit One is scheduled for its Fifth Refueling and Inspection Outage from 9-8-90 through 11-23-90.
.25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test StatusiPrior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION 1
\\h t h
-. ft...
1 gANN4
~
!]"$$)\\k
,e l
50-387 M
UNIT SHUIDOWNS AND POWER REDUC 110NS E
g UNIT NAME Ore (O
M DATE d4-M O
s#4fC 8 REPORTMONTH arch 1970--
TELEPHONE (7171542-3251 M
copyLETED BY K.A. Youna j
w.
E
~
e
... 75 Licensee E-t Eg Cause & Corrective 5;
'E
_.{
jj 3s&
h fO'8 Acti<m to No.
thie Event f*:
ggg Report a wU 5-Prevent Recurrence g
i Unit One ecmenced manual shutdown 3
900321 F
11.7 B
1 N/A FK DISC at 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> March 20 and opened main generator output breaker at 0603 hours0.00698 days <br />0.168 hours <br />9.970238e-4 weeks <br />2.294415e-4 months <br /> March 21.
Reactor remaimd critical at low power level' during forced outage. Ebreed outage was required to make repairs to 230KV switchyard Generator #1 disconnects that were developing hot spots.
Repairs were made and Unit synchronize 1 to PJM grid at 1746 hours0.0202 days <br />0.485 hours <br />0.00289 weeks <br />6.64353e-4 months <br /> March 21.
Pom r ascension was held at 60%
level for 26 leurs while condenser tub 2 leaks were identified and repaired.
Unit One reacled 100% power at midnight March 23.
1 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparati<m of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for IAvnsee
- C-Refueling 3-Automatic Scram.
Event Report (LERI File iNUREG-
. D-Regulatory Restriction 4-Continuation 0161) '
E-Operator Training & Ucense Examination from previous month F-Administrative 5-Reduction Goperational Error (Explain)
. Exhibit 1 - Same Source i
19/77)
Ilother(Explain) 9-Other 4
&NNA Q
alf"ik!y p
.G.
M
-M UNIT SHUTDOWNS AND POWER REDUCTIONS TNO.
50- E g
g UNIT NAME h
p DATE 1-5-96 4fc 8 REPORTMONTH March 1990 NTED W U-hung TELEPHDNE (717)542-3251
.$ E
}
E Licensee P,
Cause & Corrective No.
Date g
3g
,s&
Event p
- n. g Action to l
j :_
jgg Report a mO O
H Prevent Recurrence d
4 900331 S
0.0 B
5 N/A XX ZZZ Ccrvnencing at 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> March 30.
Unit One Reactor power was reduced to 60% for scheduled maintenarx:e outage. Control rod sequence exchanger was cunpleted and Unit returned to 100% power level at 0900 luurs April 1.
4 f
I 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions 5: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LE RI File INUREG-D-Regulatory Restriction 4-Continuation 0161)
E-Operator Training & License Examination from previous month F-Administrative 5-Reduction 5
' G-Operational Error (Explain)
Exlubit I - Same Source N/77)
Il-Other (Explain) 9-Other
.. _ _.. _ _ = _. _ _
~
4 AYERAGE DAILY UNIT POWER LEVEL E
.yyyy DOCKET NO.
50-388 t =9 ki Two g
(
WT PP"i Q
4-5-90
\\
DATE -
~
Y gp COMPL27ED BY K. A. Yomg -
p gg J717)S42-3251 March 1990 m
DAY AYERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) iWWe Net) -
3 10sf; M
37 i
2 1056 13 1055
[
3 1057 3,
1056 4
insn 1057 20 s
1 n; 7 1057 7
21 6
1058 1054 22 7
1058
.995 1058 8
1002 24 1057 105f 10 26 1056 Ii 1050
'1055 1046 12 1056 28 13 1043 1055-3 14 1043 30 1055 1043 15 3
1053 16 1041 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the repomng month. Compute to the nearest whole rnegawatt.
(0/77 ) -
4
.l 8
i Ik
ANN 4 4
4
~ g e}~,y ' &
y
~
_JriAiRF I
tA-
~kJ OPERATING DATA REPORT l
DOCKET NO. 50-388
)
k DATE 4-5-90 J
- fC rp COMPLETED BY K.A.
Young
)
TELEPHONE (7171542 -3251 '
.r OPERATING STATUS
- Unit Two 1, Unit Name: Susquehanna Steam Electric Station Notes
- 2. Reporting Penod:
Mare'h 144A j-
- 3. Licensed Thermal Power (MWel:
3293
- 4. Nameplate Rating (Gross MWel:
1152 3.-
$. Design Electrical Ratin5 INet MWel:
1050
- 6. Maximum Dependable Capacity (Gross MWel:
1074.6
- 7. Maximum Dependable Capacity (Net MWeI:
1038.2 t
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
No chances were made.
- 9. Power Level To which Restricted,if Any (Net MWe):
None
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr..to Date Cumulatise
- 11. Hours in Reporting Period 744
- 2,160 44,976
- 12. Number Of Hours Reactor Was Critical iaa 2.011.3
'36,676.6
- 13. Reactor Reserve Shutdown Hours 0
0 717.9
- 14. Hours Generator On Line 744 1,992 35,887.3 1
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2,445,719 6,478,298 113,286,273'
- 17. Gross Electrical Energy Generated (MWH) 808,952 2,142,798-
'37,130,711
- 18. Net Electrical Energy Generated (MWH) 781,057 2,064,821 35,725,502-
- 19. Unit Service Factor 100 92.2 79.8
- 20. Unit Availability Factor 100 92.2 79.8
- 21. Unit Capacity Factor (Using MDC Nett 101.2 92.1 76.5
- 22. Unit Capacity Factor (Using DER Net) 100 91.0 75.7
- 23. Unit Forced Outage Rate 0
'7.P 6.7
- 24. Shutdowns Scheduled Over Next 6 Months iType. Date. and Duration of Eneh e None scheduled.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1
(
I im-,
i i
.I A.
0is
~
4SJ 4
Wd LEMT$NUTDOWM5 ANDFUWER REDUCTIONS N-g inwTmmE WO Dnis 4-s-on 6 gy Y_A_
Ynirwy REFORT MONTW March 1990 1EE.ErgeoNE (717) 542-3251 t
i i
E e
3E 3
IE Liceasee 3-*,
p
}sE Cause a Corrective W.
Ihte R
~g Evens 7
.c f5 2
3 p, e Report *
- O EO o
Prevesw Recwcresce i
7 9
u d
No regort required for this nonth.
l t
2 3
4 F: Forced Reason:
Method:
Ed@lt G. Insermetions S: Scheduled A-Em,__.: Faihme(Explain) 1-Menesi
&n % seism of Does B temineenance of Test FRennest scrass.
- Esey spets For IAcesee C-Refueling 4-Continuation 986f1 3-Ameommeic Screm.
Ewas Report (LERI File tMfREG-D-Regeistory Rewrictium E-Operefor T;,mwig a txenee Examiesiem front previous month F-Adwesuwretive Reduction 5
G-Operational Error (Explain)
Esh3Mt 6 -Same 5.wece (9/77)
HOsher (Explain) 9-Other 4
.m.,
. +, -.,,
-.., - ~.
-r e
v [w v
e.-
w u., 4
++.
we......,
3-.v v-,. - -.
...e
+.., <-. _ - -
Ia.
z : <
b' 3
-d m.
- & p '.
d' i,
- ,5l[ [i.l. [w.
,' N ' '.. ;
+,..
.c. ;..
..r o
.s.
M SUSQtEHANta STDM ELBCTRIC STATIO4 '
Docket Ntuber 50-388 Date March 1990 omnpleted By X. A. Young Teleph:me (717)S42-3251 il Qa11enges to Main Steam Safety Relief Valves None Changes to t}u offsite Ibse Calculation Manual None Major ChangesLto Radioactive Waste Treatment Systems None
- t-m
~
t
?
2A_z _11_ ____ _ _ ____:. _ 2. __1.._
. _.1_.
.p 1
t I
.h StBOUDUNR STDM EUKTRIC STATION -
Docket Ntaber 50-387-
- Date March,1990 Ctmpleted by K. A. Young Teleghone (717) 542-3251 '
i Challenpa to Main Steam Safety Relief Valves -
1
?
Changes to the Offsite Dose Calculation Manual.
d None t
.t Major Changes to Radioactive Waste Treatment' Systemsi
! I t
- l f'!
s[
-j I
~
b g
9 +
- . i
[
o
-r
.i 1
.t
-[
.. ~:
s i
/
P
.,