Discusses Commitments in Response to Violations Noted in Insp Repts 50-454/89-16 & 50-455/89-18.Corporate Task Force Completed Draft Document Entitled 10CFR50.59 Implementation Task Force Rept on 900208
05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed
ML17191B376
ML17191B382
ML20209D486
ML20212H824
ML20196G216
ML20196K016
ML17191B393
ML20209B824
ML20196J906
ML20196J913
ML17191B394
ML20209G139
ML20207H750
ML17191B395
ML20209H299
ML20210D260
ML20210B707
ML20210A315
ML17191B403
ML20210E215
ML20210J895
ML20210K077
ML20210M913
ML20210N565
05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER
05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed
ML20195C791
ML20211M178
ML20207D526
ML20211M161
ML20195D635
05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed
ML20209D486
ML20196G216
ML20209B824
ML20196J906
ML20196J913
ML20209G139
ML20207H750
ML20210D260
ML20209H299
ML20210E215
ML20210J895
ML20210K077
ML20210M913
ML20210N565
05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER
'. s%J April 11, 1990 Mr. A. Bert Davis Regional Administrator U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Il 60137
Subject:
Byron Station Units 1 and 2 Inspection Report Nos.
50-454/89016 and 50-455/89018 NRC_DncheJ;._Hos_, 50-454 and 50-455 -
Reference:
a) January 31, 1990 Letter from T.K. Schuster to A. Bert Davis i
Dear Mr. Davis 1
The letter of reference (a) stated a corporate review of the generic applicability of 10 CFR 50.59 safety evaluations was underway. Also, that as a result of this review the applicability of safety. evaluations prior to
j Specifically, the conditions of concern would be when the valves have not been 1
repositioned as a result of an 00S or an. approved. procedure.
It was also
.l stated that a draf t report would be internally issued by February 9,1990 and that final disposition of a resultant Nuclear Operations Directive (N0D).and its content as applicable to abnormal ECCS valve positions-would be provided i
by April 15, 1990. The following describes our actions relative to these commitments.
i
/
The Corporate Task Force completed a draft document entitled "10 CFR 50.59 Implementation Task Force Report" on. February 8, 1990.
The draft report l
was issued to each of the Commonwealth Edison Nuclear Stations for; review and i
comment. Numerous comments were received on the draft.
Incorporation of I
these comments into the draft and reformating to produce a Corporate N0D, including an assessment of the required resources for implementation,.will be l
an iterative process.
Issuance of the N0D in an approved form is therefore planned for October 1, 1990. The final content and' implementation schedule,
{
as specifically applicable to abnormal ECCS valve positions, will be provided at that time since it has not yet been established.
Please direct any questions regarding this matter to this office.