Text
y s.
i l
WC4.F CREEK
~
NUCLEAR OPERATING CORPORATION l
.lohn A. Baby j
Vue Prwoont 1
Nuoiset osmotepne
]
I 1
April 13,1990 NO 90-0113 j
U. S. Nuclear Regulatory Conunission ATTH: Document Control Desk Mail Station P1-137 Washington, D. C.
20555
Subject:
Docket No. 50 482: March 1990 Monthly Operating l
Report l
Gentlemen Attached is the March 1990 Monthly Operating Report for Wolf Creek Generating Station.
This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.
Very truly yours, i
John A. Bailey Vice President Nuclear Operations JAB /jra Attachment I,
cc R. D. Martin (NRC), w/a D. Persinko (NRC), w/n D. V. Pickett (NRC), w/a M. E. Skow (NRC). w/a 9004200621 900331 DR ADOCK 0500 2
/g'9k i
P.O Box 411/ Burkngton, KS 66839 / Phone: (316) 304 8831 py An Equal opporturWy Employer MWHCVET i
-Attachment to NO 90-0113
'. 7
- )
i NOLF CREEK NUCLEAR OPERE"ING CORPORATIN NOLF CREEK GENERATI!G bMW IOmfLY OPERATI!G REPmT 1 0 m 1:
Mart:h YEAR ' R Docket No.:- 50-482 8
Facility Operating Idoense No.: NPF -42 Report No.,,_fiL, t
l l
E l
I t-Merlin G. Williams
)
l l
L-i t '
j l
I
Attachment to NO 90-0113-StMURY he following report highlights the operating experience of Elf Creek ~
Generating Station for the mmth of March,1990. 'Ihis report is ba@g provided pursuant to hinical Specificatica 6.9.1.8.
I.
SlMORY OF OPERATIN3 EXPERIENCE
% e unit began the month operating at approximately 96 percent power due to
[
a tube leak on the number "2B" low-pressure feedwater heater. On March 02, j
1990, at 1218 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.63449e-4 months <br />,- the unit began to gradually decrease power due to fuel limitations (a " fuel coastdown") at a rate of approximately one percent par.
day. On March 08, 1990, at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br />, the unit began a normal shutdown for refueling fran approximately 90 percent power. h e. refueling outage began at 0027 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> on March 09, 1990, when the generator output breaker was opened. %e unit remained shutdown for refueling for the remainder of the month.
II. MAJOR SAFETY REIATED MAINTEl&NCE ACI'IVITIES
-1.
Main Steam safety valve test.
2.
Fuel unloaded and inspected.
[
l 3.
One fuel assenbly reconstituted.
I 4.
Rod Cluster Control Assemblies (ROCAs) renoved and inspected.
j 5.
Bify current testing performed on Steam Generators "B" and "D".
6.
Reactor Coolant Pung "C" seals replaced.
7.
Sections of Essential Service Water systems piping replaced.
8.
RWm performed on Containment Cooler tube bundles.
9.
24-hour test run of Simpcy Diesel Generators.
Wolf Creek Generating Station Monthly Operating Report March 1990 Page 1 of 5
4 ttachment to !!0 90-0113 q
OPERATIIG DMA REPCRT DCX7E NO. 482 WOLF CREEK GENERATIIG STATION NOLF CREEK NUCLEAR OPERATDG CCRPWATICM f
L DATE 04-01-90 CXMPLETED BY M. Willians l
TELEPENE 316-364-8821 OPERATIIG STA'IUS
.1, Reporting Period March, 1990 Gross Hours in Reporting Periods '744 j
L l
,2.
Currently Authorized Power Imel(NWt),_29,1 Max. Depend. Capacity (NWe-Net): ll3) a Design Electrical Rating (MWe-Net): 1170 3.
Power Imel to Nhich Restricted (If Any)(MWe-Net) -
N/A 4.
Reasons for restriction (If Any):
N/A f
'1his Month Yr. to Date O = lative 5.
Number of Hours Reactor was Critical 192.7 1577.3 31,876.7 6.
Reactor Reserve Shutdown Hours 0.0 0.0-339.8 7.
Hours Generator on Line 192.5 1554.7 31,341.8 8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.
Gross '1hermal Energy Generated (NHH) 599,723 5,152,108 103,629,363 i
- 10. Gross Electrical Energy Generated (NHH) 206,265' 1,796,240 36,075,187 a
- 11. Net Electrical Energy Generated (NHH) 189,647 1,718,523 34,440,894
~12.
Reactor Service Factor 25.9 73.0
'79.5
.13.
Reactor Availability Factor 25.9 73.0 80.3
- 14. Unit Service Factor 25.9 72.0 78.2
- 15. Unit Availability Factor
-25.9 72.0 78.2 1
- 16. Unit Capacity Factor (Using MDC) 22.5 70.1 76.0
- 17. Unit Capacity Factor (Using Design NWe) 21.8 68.0 73.4 18.- Unit Forced Outage Rate 0.0 3.3 4.5
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each):.N/A
- 20. If Shut Down at End of Report Period, Estimated Date of Startup:
05/07/90 Wolf Creek Generating-Station Monthly Operating Report-March 1990 Page 2 of 5 g
1 a
m m
i
., f -
e.' Attachment to NO 90-0113 F'
.j
't 4
AVERAGE IAILY INIT POWER LEVEL DOCKET NO. ~50-482 NOLF CREEK GENERATDG STATICE WOLF CREEK NUCLEAR OPERATDG OCRPCRATICN DATE 04-01-90 CCMPLETED BY M. Willi-TELEPIDE 316-364-8831 KN1H March, 1990 i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PONER LEVEL
. (MNe-Net)
()Me-Net) 1~
1074 17 0
2 1067 18 0
3 1050 19 0'
4 1036 20 0-5 1024 21 0
6 1020 22 0
'7 1014 23 0
8 964 24 0
9 0
25 0
10 0
26 0
l
.i 11' 0
27--
0 i
12 0
28 0
13-0 29 0
-14 0
30 0
l l
15 0
31 0
(-
l1 -16 0
3 i
i E
r l
(
Nblf Creek Generating Station Monthly Operating Report March 1990 Page 3 of 5 i
+,
e --
9 UNIT SHUTDOWN AND POWER REDUCTIONS 50-482
,>N DOCKET NO.
VOLF CREEK GENERATING STATION' g-WOLF CREEK NUCLEAR OPERATING CORPORATION-
=r DATE 04-01-90 COMPLETED BY M. Williams 3*
REPORT MONTH March. 1990 TELEPHONE 316-364-8831 TYPE METHODS SHUTTING F: FORCED DURATION - REASON DOWN THE REACTOR CORRECTIVE ACTIONS /COttiENTS No Date St SCHEDULED (HOURS)
(1)
OR REDUCING POWER (2) o o
2 900309 S
.551.55 C
1 Scheduled refueling outage.
O w i I
StBGEARY: The unit began to gradually decrease power due to fuel limitations on March 02, 1990. The unit began a
' normal shutdown for refueling on March 08, 1990. The generator output breaker was opened at 0027 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> on March 09, 1990. The unit was shutdown for refueling for the remainder of the month.
- 1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:
1.
MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2.
MANUAL SCRAM C: REFUELING
.G:
OPERATIONAL ERROR (EXPLAIN) 3.
AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.
CONTINUED 5.
REDUCED LOAD 9.
OTHER Wolf Creek Generating Station Monthly Operating Report March 1990 Page 4 of 5
~
1-1..
.,,s,.
e
- 3. : A{tachmentto.N090-0113
-_, - * ~.,
.I m caEEK mmaR wEnATIm ammTIm:
L m CREEK GREFATIE S MTIN 1
INIT m.1 1
10tml March, 1990 StHORY OF OPERATIE EKPFRIENCE q
.{
I1 sited below in chronological sequence is a summary of operating experiences'for this month-which required load reduction or resulted in significant non-load related incidents.
1
(
.QBZE ZDE ZEElE i
March 01, 1990 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 96%' power.
March 02, 1990 1218 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.63449e-4 months <br /> Began _ fuel' coastdown at a==i-taly 1% par day..
March 08, 1990 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> Began normal power reduction-frcun approximately 90%
power.-
March 09, 1990 0027 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> Opened generator output breaker - beginning of refueling outage.
0029 hours3.356481e-4 days <br />0.00806 hours <br />4.794974e-5 weeks <br />1.10345e-5 months <br /> Entered Mode 2 - Startup.
0044 hours5.092593e-4 days <br />0.0122 hours <br />7.275132e-5 weeks <br />1.6742e-5 months <br /> Entered Mode 3 Hot Standby.
2125 hours0.0246 days <br />0.59 hours <br />0.00351 weeks <br />8.085625e-4 months <br /> Entered Mode 4 - Ibt Shutdown.-
March 10, 1990 0749 hours0.00867 days <br />0.208 hours <br />0.00124 weeks <br />2.849945e-4 months <br /> Entered Mode 5 - Cold Shutdown.
March 17, 1990 0149 houm Entered lede 6 - RefnalMg. Reactor Vessel head studs detensioned.
3 March 31, 1990 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Continuation of Refueling Outage. activities.
E 4
I Wolf Creek Generating Station i
Monthly Operating Report-March 1990 Page 5 of 5
.