ML20034A000

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info Re 1989 Annual Rept for Triga Mark I Research Reactor,Including Details of Environ Survey Program & Mods to Sys Hardware
ML20034A000
Person / Time
Site: General Atomics
Issue date: 04/06/1990
From: Alexander Adams
Office of Nuclear Reactor Regulation
To: Asmussen K
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER
References
NUDOCS 9004190133
Download: ML20034A000 (4)


Text

__

April 6, 1990 3

j e

Docket No'. 50-89 i

?

'Dr. Keith E. Asmussen, Manager Licensing, Safety and Nuclear Compliance I

General Atomics' L

P. O. Box 85608 San Diego, California 92138-5608

Dear.Dr. Asmussen:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION During our review of your 1989 annual report for the TRIGA Mark I Research

~

Reactor, questions have arisen for which we require additional information and clarification. Please provide responses-to the enclosed Request for Additional Information within 30 days of the date of this letter.

If you have any questions regarding this review, please contact me at (301) 492-1121.

i The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P. L.96-511.

Sincerely, Original-signed by:

Alexander Adams,'Jr., Project Manager Non-Power Reactor, Decommissioning and Environmental Project Directorate Division of Reactor Projects

.III, IV, Y and'Special Projects Office of Nuclear Reactor Regulation i

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION.

DocketJ11e ed NRC & Local PDRs l

PDNP r/f L

WTravers l

EHylton AAdams OGC EJordan l

.ACRS(10)-

9004190133 900406 Plant file

[DR ADOCK 0500 9

p

-L/

[AA LTR2 KAsmussen/4]

3 l-i ]$f P)NlA PDNP PDNP:D f( ton AAd (mj.

SWejss 4/g/90l

. 4/g /90 4/

90

li* '

m.

M

'g' UNITED STATES -

5

.[I NUCLEAR REGULATORY COMMISSION WASHINGTON. D C.20666 o,

April 6, 1990 1

i Docket No. 50-89

-Dr. Keith c. Asmussen, Hara p

[

Licensing, safety and Nuclear Compliance General Atomics P. O. Box 85608

-San Diego, California 92138-5608

?

Dear-Dr. Asmussen:

-[

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION i

During our review of your 1989 annual report for the TRIGA Mark I Research Reactor, questions have arisen for which we require additional information and i

clarification.- Please provide responses-to the enclosed Request for-Additional Information within 30' days.cf the 'date of this letter.

If you have any questions.regarding this review, please contact me at (301) 492-1121..

]

The reporting ard/or recordkeeping-requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required

-j under P. L.96-511.

.J l-l-

Sincerely, t

Alexander Adams, Jr.,

r ect Manager

.c Non-Power Reactor, De issioning and Environmental Project Directorate i

Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

l As stated cc w/ enclosure:

L See next page I

.?

l K

I.

't

.~.

~

General Atomics-Docket Nos. 50-89/163 E

cc:

California Department of Health ATTH:-- Chief Environmental Radiation Control Unit Radiologic Health Section 714 P Street, Room 498 Sacramento, California 95814 l

l 4

)

l

E

(

4 -.

c REQUEST FOR' ADDITIONAL INFORMATION GENERAL ATOMICS DOCKET NO. 50-89

1 ~.

Please provide complete 10 CFR 50.59 packages.for the reviews mentioned in Sections 5.2,-Addition of.a Ground Fault Detector Test Circuit to:

-Instrumentation and Control System, 5.3, Addition' of a Scram Timer--to the

(-

Instrumentation and Control Sys.<m,-and 5.6, Addition of Watchdog Timer i

1 Scram Surveillance Testing Circuits to Instrumentation and Control System.

i 2.

Please provide additional details on General Atomics' Environmental Survey I

Program as it applies to the Mark I reactor.

l 3.

Section 4.2, Maintenance to the Instrumentation er.d Control Systems - Did any of these changes involve modifications.to the system software?-- If so, provide additional details on~the. validation and verification of'the modi-fications.

.]

1 1

-I 4

'