ML20033H115

From kanterella
Jump to navigation Jump to search
Summary of CRGR Meeting 180 on 900228 Re Proposed NUREG Rept Containing Guidance to Licensees for Implementing Generic Ltr 89-01 on Moving Radiological Effluent Tech Specs to ODCM
ML20033H115
Person / Time
Issue date: 03/28/1990
From: Jordan E
Committee To Review Generic Requirements
To: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
GL-89-01, GL-89-1, NUDOCS 9004180201
Download: ML20033H115 (2)


Text

i March 28, 1990 p.

MEMORANDUM FOR:

James M. Taylor Executive Director for Operations FROM:

Edward L. Jordan, Chairman Committee to Review Generic Requirements SU8 JECT:

MINUTES OF CRGR MEETING NUMBER 180 The Committee to Review Generic Requirements (CRGR) met on Wednesday, February 28,1990 from 1:00-5:00 p.m.

A list of attendees at the meeting is attached (Enclosure 1).

The following items were addressed at the meeting:

1.

J. Cunningham (NRR) and T. Essig (NRR) presented for CRGR review two proposed NUREG reports (NUREG-1301 and NUREG-1302) containing guidance to-licensees for implementing Generic Letter 89-01 on moving Radiological Effluent Technical Specifications to the Offsite Dose Calculation Manual.

The Comittee recommended approval and issuance of the proposed guidance subject to several recommedations to be coordinated with the CRGR staff and final review by CRGR of the revised implementing generic letter.

This matter is discussed in Enclosure 2.

2.

R. Bosnak (RES) and G. Milman'(RES) presented for CRGR review a proposal to eliminate CRGR review of certain revisions to 10 CFR 50.55a (Codes and Standards). Tha Committee deferred to current OGC guidance that the backfit rule does not apply to routine updates of the ASME Code, but will continue reviewing proposed revisions to 10 CFR 50.55a, in accordance with the provisions of the CRGR Charter.

This matter is discussed in.-

3.

The Committee discussed the schedule and possible location for the next plant visit by CRGR.

This matter is discussed in Enclosure 4.

~

4.

The Committee discussed preliminarily possible changes to the CRGR Charter, but made no final decisions or recommendations at this time.

i Update of the Charter will be considered further at a future meeting.

This matter is discussed in Enclosure 5.

In accordance with the ED0's July 18,1983 directive concerning " Feedback and Closure of CRGR Reviews," a written response is required from the cognizant office to report agreement or disagreement with the CRGR recommendations in these minutes.

The response, which is required within five working days after receipt of these minutes, is to be forwarded to the CRGR Chairman and if there is disagreement with CRGR recommendations, to the EDO for decisionmaking.

l COPY 6diggg gy hh 900418o2o1 900328 L-PDR REVGP NRCCRGR MEETING 180 PDC U

L

I 4

James M. Taylor Questions concerning these meeting minutes should be referred to Dennis Allison (492-4148).

)

Original Signed by:

E. L Jordan Edward L. Jordan, Chairman Comittee to Review Generic Requirements

Enclosures:

As stated cc w/ enclosures:

i Commission (5)

SECY J. Lieberman P. Norry D. Williams Regional Administrators CRGR Members Distrih'stion:

  1. Cent /fk' Filer (W/o'enci'6 PDR (NRC/CRGR) (w/o encl.)

P. Kadambi CRGR CF CRGR SF M. Taylor J. Cunningham R. Bosnak T. Essig G. Milman S. Crockett E. Jakel E. Jordan D. Ross J. Conran D. Allison b%b% /l

)[/

l b,,,AEOD:CRGR

  • AE)D,:Dq / :C/

.D:

g

.....:...............fRoss NAME : J nrin

O Jor an

,t......

DATE : 3/26/90

3 0 90
3/)7/90 OFFICIAL RECORD COPY N ad