ML20033H015
| ML20033H015 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 03/23/1990 |
| From: | Hukill H GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20033H016 | List: |
| References | |
| C311-90-2038, NUDOCS 9004160049 | |
| Download: ML20033H015 (3) | |
Text
'
e GPU Nucleet Corporetkn Nuolear
- =. ora::=
IAlodictown. Pennsylvania 170$7 0191 717 944 7621 TELEX 64 2386 Wr#ter's Direct Dial Number:
March 23, 1990 C311-90-2038 4
US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 l
Dear Sir:
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Facility Operating License Amendment Request No. 176 In accordance with 10 CFR 50.4 (b)(1), enclosed is one (1) original, and in addition ten (10) conformed copies of Facility Operating License Amendment Request No. 176.
The purpose of this license amendment request is to extend the duration of the operating license to forty (40) years from the date of issuance of the full-power license. This request represents a license extension of 5 years and 11 months to allow operation for the full design life. A license term of 40 years from the date of issuance of the full-power license is permitted by the NRC regulations, specifically 10 CFR 50.51, and the basis for granting this request has been established by the Commission's current policy in granting operating licenses to new plants.
Commission approval of the proposed amendment would be consistent with recent NRC actions.
Also enclosed is one signed copy of the Certificate of Service for this request to the chief executives of the township and county in which the facility is located, as well as the Bureau of Radiation Protection.
OkNOcck$O0$$!s9 p
- 00
[V \\\\\\
GPU Nuclear Corporation is a subsidiary of General Public Utahties Corporation
C311-90 2038 March 23,1990 Pursuant to 10 CFR 50.91(a)(1), we enclose our analyses, using the standards in 10 CFR 50.92 of significant hazards considerations.
As stated above, pursuant to 10 CFR 50.91(a) of the regulations, we have provided a copy of this letter, the proposed change, and our analyses showing no significant hazards i
considerations to Thomas Gerusky, the designated representative of the Commonwealth of Pennsylvania.
Sincerely, f
/
.D.H) kill Vice President & Director, TMI-1 i
HDH/DJD/spb t
Enclosures:
1)
Facility Operating License Amendment Request No. 176 l
- 2) Certificate of Service for Facility Operating License Amendment Request No. 176 cc:
J. Stolz R. Hernan T. Martin F. Young 1
l l
l i
i I
t i
UNITED STATES OF AMERICA NUCLEAR REGULATORY C0tHIS$10N IN THE FATTER OF DOCKET NO. 50-289 GPU NUCLEAR CORPORATION LICENSE NO. DPR-50 CERTIFICATE OF SERVICE This is to certify that a copy of Facility Operating License Amendment Request No.176 to Appendix A of the Operating License for Three Mile Island Nuclear Station Unit 1, has, on the date given below, been filed with executives of Londonderry Township, Dauphin County, Pennsylvania; Dauphin County, Pennsylvania; and the Pennsylvania Department of Environmental Resources, Bureau of Radiation Protection, by deposit in the United States mail, addressed as follows:
Mr. Kenneth E. Witmer, Chairman Ms. Sally S. Klein, Chairman Board of Supervisors of Board of County Comissioners Londonderry Township of Dauphin County 25 Roslyn Road Dauphin County Courthouse Elizabethtown, PA 17022 Harrisburg, PA 17120-(
Mr. Thomas Gerusky, Director PA. Dept. of Environmental Resources Bureau of Radiation Protection P.O. Box 2063 Harrisburg, PA 17120 GPU NUCLEAR CORPORATIO )
BY:
1 Vice PresTdent & Director, TMI-1 DATE:
March 23, 1990
_