l April 5,1990 Docket No. 50-5 APPLICANT:
Pennsylvania State University (Penn State)
FACILITY:
Penn State TRIGA Research Reactor
SUBJECT:
SUMMARY
OF MEETING TO DISCUSS INSTALLATICN OF A COMPUTERIZED CONTROL SYSTEM AT THE PENN STATE TRIGA RESEARCH REACTOR l
On March 26, 1990 representativesofPennStateandtheNRCstaff(Enclosure 1) met to discuss a new instrument and control system that is proposed for instal-i l
1ation at the Penn State TRIGA Research Reactor.
Details of the system were outlined in material (Enclosure 2) provided by Penn l
State. Some aspects of the system that will require additional discussion are the CRT update rates, the safety implications of the operator having access to j
both the control and monitoring system, details of the validation and verifica-tion (V8V) plan for the software, the human factor considerations that entered l
into the console design, how changes to the source code will be controlled, the functions of the watchdogs and the safety aspects of having three control rods under computer control in the automatic mode.
The installation of the system is planned for late 1990 or early 1991.
Licensing options for the system were discussed without any conclusions being reached.
It was pointed out by the staff that any changes or additions to the Technical Specifications would require staff review and approval.
Original signed by:
Alexander Adams, Jr., Project Manager Non-Power Reactor, Decommissioning and Environmental Project Directorate Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation l
As stated cc w/ enclosures:
See next page DISTR: BTION.
[pocteu.THe '
v NRC & Local PDRs 8,o PDNP r/f to o o WTravers S[
EHylton l' gg AAdams i
mo OGC w.z EJordan Q8 ACRS (10) g Plant file b
[AAMEETING
SUMMARY
PENNSTATE]
$$o-PDNP:P D P:D AAdaf SWeiss DFoI 4/f 4/g /90 ll4
)
1 St 8;f C I
e UNITED STATES
[ '
3 m ',g NUCLE AR REGULATORY COMMISSION j
e oa WASHINGTON, D C. 20666 s
1
%....*/
April 5, 1990 i
I i
i J
l Docket No. 50-5 4
i APPLICANT:
Pennsylvania State University (Penn State) i FACILITY:
Penn State TRIGA Research Reactor j
SUBJECT:
SUMMARY
OF MEETING TO DISCUSS INSTALLATION OF A i
COMPUTERIZED CONTROL SYSTEM AT THE PENN STATE TRIGA RESEARCH REACTOR i
On March 26, 1990 representatives of Penn State and the NRC staff (Enclosure 1) met to discuss a new instrument and control system that is proposed for instal-i lation at the Penn State TRIGA Research Reactor, Details of the system were outlined in material (Enclosure 2) provided by Penn i
State. Some aspects of the system that will require additional discussion are j
the CRT update rates, the safety implications of the operator having access to both the control and monitoring system, details of the validation and verifica-i tion (V8V) plan for the software, the human factor considerations that entered into the console design, how changes to the source code will be controlled, the l
functions of the watchdogs and the safety aspects of having three control rods-under computer control in the automatic mode.
The installation of the system is planned for' late 1990 or early 1991.
Licensing options for the system were discussed without any conclusions being reached.
It was pointed out by the staff that any changes or additions to the l
Technical Specifications would require staff review and approval.
i Alexander Adams, Jr., P j Manager Non-Power Reactor,. Deco sioning and t
Environmental Project Directorate Division of Reactor Projects - III, IV, V and Special Projects l
Office of Nuclear Reactor Regulation 1
l
Enclosures:
As stated i
cc w/ enclosures:
See next page i
k i
w.
,,,---w,,
.,,w i,.. --r..
y
-,, - + -
t 1
Pennsylvania State University Docket No. 50-5 j
cc Governor's Office of State Planning and Development ATTH: Coordinator, Pennsylvania State Clearinghouse Post Office Box 1323 l
Harrisburg, Pennsylvania 17120 r
1 Dr. Marcus H. Voth, Director Penn State Breareale Reactor College of Engineering 1
The Pennsylvania State University 207 Old Main Building University Park, Pennsylvania 16802 i
l i
+. -
)
i ENCLOSURE 1 l
?
PENN STATE MEETING MARCH 26, 1990 NAME ORGANIZATION Alexander Adams USNRC/NRR/PDNP Terry Flinchbaugh Penn State Breareale Reactor i
Daniel E. Hughes Penn State Breazeale Reactor Marcus H. Voth Penn State Breareale Reactor Seymour H. Weiss
.NRC/NRR Jim Stewart NRC/NRR/SICB Richard J. Eckenrode NRC/NRR/HfAB r
Theodore Michaels NRC/NRR/PDNP
+
l e
(
3 f
4 h
i i
i l
PSBR New Console i
i i
[
l Vendor:
l AECL Technologies, Washington D. C.
1 j!
1 i
l PSU Presentation to NRC-1 1
o 26 March 1990 5
3 j
~
I i
e i
i i
1
,m..-_
.._ _ -.,,.,._.-_... _. ---~..-....-_. __.._,__...__ _ _ _. _. _
I i
i
{
Safety 2,
"m 2,c
-_ ;.. g,,,g
=.
- Key Switch
. Test Controls NM NM l
. Manual Rod Drive l
l r
3 r
3 Safety System Hardwired Analog Console g
Displays Controls
(
J
(
J 4
/
\\/
\\
l 4
1 i
I i
x e
x i
g O
O i
1 I
I 1
I I
I I
i i
i I
I I
I i
l I
I i
T Y
i J
l L->
DipItal Disploy/
m Analog
~
l
~
Control 4
Buffer 7
Scram j.
~
Computer Computer Logic I
DCC-X DCC-Z l
h I
b b
n Scram.
I Secure Magnets / Air 1 r i
One-way i
Detalink Control Hardwired 4--
/
Rod Interlock Drives Logic c
1 1
i p
i Facility Door & Gate Status, Radiation Monitors, etc.
Remote Datelinks Monitors 4
... ~ ~,, _,, _.., _ _ _,
'I
\\.
?
11 l
. 11ji1 11112 1
i I
1 1 1 1 1 1 1 y
n u
o u
o o
- iIllil, i
n o
a a
a a
o I
a n
3 3
! f h f 3
I f
I la i
!!!ill l
i
l
! I k l l f lilIll !! I 11 l
n a na n a aor 1 1 1
j s a j
i I
j 111 I
t l
i e
1 i
l
\\
\\
i l
)
t
\\
\\'
l I f i f l
I I
I i
I d i i l d i I
l r1 1 i
l I
f i
I i
i J
2..
- - ~ - -.. - - -. - - -. - - -. -. -.. - - - -... - - - - - - - - - - -. - - - -
9 i.
l ll 11 I
l l
l 1
l I
3
],j I
l 1
t l I *l *s h
l Ill !1 1{r g
j i
i i
j New Console Training Program f
. Training at Vendor (2 SRO's & 1 Electronic Tech) -1 week l
- 1) Computers
- 2) Console electron'es, diagnostics and maintenance
- 3) System description and operations
- 4) " Hands on" experience in FAT, operation and maintenance i
I Pre-installation Training at PSU - 1 week l
t
- 1) Review of vendor training with updated training materials l
l
- 2) Review of procedure changes or anticipated change
- 3) " Hands on" experience prior to installation j
- 4) Written requalification exam on items specific to the new console r
i i
l Installation Training
- 1) Participation in installation under the supervision of those who attended the vendor tra' ming j
- 2) Participation in SAT and checks and calibrations
}
i
l 1
4 i
i New Console Training Program i
i i
i I
j Post-Installation Training -1 week
- 1) OpermHonal training Under supervision of those SRO's l
who attended the vendor training 1
l 4
l
- 2) Operational testing of staff by those SRO's who attended the vendor training.
i l
i i
f l
t
?
l
,..,m-%.v,..w
.we
- w., - -. _... -.
,w.,,.e--+----n
~~m,'
.<----w,-.-.-w,--w,*-.-,42..%e-%~..
+e,-----,.---
e,wu,w
,e-
-ww
l i
j i
I I
l i
i 1
AECL PHOTROL i
I l
System Deswiption i
Use of " pseudo-analog" block languages for knplementing control functions.
1 l
system is simple and written in
-The blocks are written in Pascal.
i t
PROTROL has been used extensiv; y and successfully.
l l
s i
i i
t I
l l
e t
i
}
I k
4 s
i.
i
j 4
I t
j l
l Verification i
i t
1 I
j AECL Tech. QA Plan consistent with 10CFR50, j
appendix B; ASME/ ANSI NQA-1, and 10CFR21.
i i
I l
-AECL Tech. QA Manager does not report to Project l
Manager.
4 j
Verification actually done by competent individuals who did not do the original design.
PSU reviews the design WTcdicns.
i PSU reviews the block logic.
I i
1 l
t
.o i
l o
1 i
l 1
I h
i l
i Validation 1
i I
i d
i l
.AECL Tech. designs and sets up FAT simulation.
i
-PSU approves and observes the FAT.
i PSU and AECL Tech. design a SAT based on FAT.
I i
i j
-PSU approves and observes the SAT.
{