E
- pp
.%t.
d hoo UNITED STATES
'/
NUCLEAR REGULATORY COMMISSION REGION IV 4
- '[
~
URANIUM RECOVERY FIELD OFFICE
- DENVER, L
Do 00235 -
MAR 61990 URFO:DLJ'
-Docket No. WM-48 040WM048910E MEMORANDUM FOR:
Docket' File No. WM-48 FROM:-
D. L Jacoby Project Manager j
- SU8 JECT:
STATUS MEETING ON DURANGO ON FEBRUARY 22, 1990 At the request of DOE,' a' status' meeting for the Durango site was held in Albuquerque on February 22, 1990.
The agenda-and a list of attendees.are provided'as attachments.
The major items of discussion included: -whether or--
not'it-wo'uld be beneficial to continue pumping to dewater the cell; results of the site ground-water characterization activities; the possibility of a revised (l
cover design; and the proposed schedule for this construction season.
-Cell-Dewatering DOE presented-arguments.against using the: existing _ wells-to dewater the cell, and: argued that'the toe drain will adequately dewater the relocated tailings.
Studies.are currently being conducted to determine the estimated time for the-toe drain to~dewater the cell.
Site-Characterization Fourteen additional wells, completed in either the alluvium or the deep aquifer, have been drilled to help evaluate the current conditions at the site.
Water quality results, for wells 608 (near the cell) and 606 (downgradient) were presented and discussed.
Further analysis of these wells and other wells will be completed.'
Cover Desian Due to inflating cost of " Clay-Max," DOE is in the process of evaluating a revised' cover design.
A final decision is to be reached on February 28, 1990.
If DOE decides to eliminate the current design, the revised design is to be formalized and submitted by March 23, 1990.
DOE will keep NRC informed.
9004040056 900306 PDR WASTE
[
4 L*
MkR 61990
' Construction' Schedule'-
DOE plans to begin construction on April 1, 1990.
They requested that the NRC cover review be completed by the start of construction, noting that if the design is modified, this request is not' plausible.
NRC responded that they would be as responsive as possible, but that there were other commitments made for that time period.
D.
. Jacob P
ect Man ger Attachments:
As stated 1
\\
4
[
DURANGO STATUS MEETING FEBRUARY 22, 1990 j
1.
CELL DEWATERING
- PAT POWERS / MARGE WESELY REPORT
- CONCLUSIONS AW RECOMEEATIONS 2.
SITE CHARACTERIZATION RESULTS
/
- PUMPING TEST
- GEOCHEMISTRY 3.
COVER DESIGN
- SPECIAL STUDY ON BENTONITE
- PARALLEL COVER DESIGN EFFORT 4.
COMPLETION SCHEDULE
- COVER COWLETION SCHEDULE
- ACTIONS TO EXPEDITE THE COVER REVIEW
]
~
3 t
r,
'DURANGO MEETINGL FEBRUARY 22, 1990 NAME ORGANIZATION.
-PHONE NO.
Ned-Larson TAC /JEG 262-1505 Ed Hawkins
_URF0/NRC FTS 776-2805 Ramon Hall-URF0/NRC
-D.
L.=Jacoby--
URF0/NRC Gary Konwinski-URF0/NRC, Geohydrologist FTS'776-2805 Mark' Thomson MK-F (303) 247-8874 Mike Kearny.
TAC /RFW.
(505) 845-4030
~ Jim Oldham MKF/ABQ 766-3177 Marj_Wesely MKES/ San Francisco'
- (415) 945-0405 Elizabeth Damler' UMTRA/DUR 845-5654 1
Tom.Jennings'
-MK-F-(505) 766-1668 l
Steve Hamp:-
DOE (505) 845-5640 iq Kent Bostick TAC /JEG (505) 845-5671 fl Pat Martinek COH-Denver
.(303) 331-4828 O
Russel' Edge-TAC /RFW-Pat Powers Consultant for MKES_
(505) 845-5713 1
i e
) -
d u
q
-l
-)
L i
_v l:
i i
i
..J :...
s f
k;. >
- t i
t WM-48/910E/DLJ/90/03/02/M DISTRIBUTION f
Docket File WM-48
.. POR/DCS URF0 r/f ABBeach, RIV LLO Branch, LLWM l
t DJacoby GKonwinski
+
RCPD, C0 4:_s.;
' I i
s I
i i
'r CONCURRENCE:
DATE:
.l DJacoby/URF0/1v M
f/// fib GKonwinski/URF0 M2/9p EHawkins/URF0 L 9s REHall/URF0 d
$O i