ML20033F736
| ML20033F736 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 03/19/1990 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 9003280455 | |
| Download: ML20033F736 (1) | |
Text
4 t hE 1
UNITE 3 STATES:
I NUCLEAR REGULATORY. COMMISSION QElloN til l
799 ROOSEVELT ROAD
- g%
OLEN ELLYN, ILLINots 40137 -
e,,,,
MAR 191993 NOTICE OF SIGNIFICANT LICENSEE MEETING I
a Name of Licensee: Northern States Power Company.
q Name of Facility:
Prairie Island Nuclear Generating Plant Docket Nos. :
,50 482; 50-306-Date of Time of Meeting:
Friday, March 23,-1990,at-IO:00a.m.(CST).
Location of Meeting:
U. _ S. Nuchar Regulatory Commission Region III-799 Roosevelt-Road Glen Ellyn,-IL 60137
- i Purpose of Meeting: Management meeting and. discussion-ofilessons i
learned from recent reactor trips NRC Attendees:
E. G. Greenman, Director, Givision cf Reactor Projects l
W. L. Axelson, Chief, Reactor Projttts Branch 2 j
B. L. Burgess, Chief, Projects Section 2A, RIII-Others as designated by Region III H
~ Licensee Attendees:
E. L. Watzl, Plar,t Manager I
Others as designated by the licensee NOTE:
Attendance at this meeting by NRC personnel =should be made known to 1
E. R. -Schweibinz via telephone call (FTS 388-5542-by COB March 22,- 1990.
{
Distribution:
j t
J. M. Taylor, Executive Director for Operations
-B.K. Grimes, Director, Division of Reactor Inspection and Safeg J. G. Partlow, Associate Director for Projects, NRR J. A. Zwolinski, Assistant Director for Region III Reactors, NRRG.
=;
J. W. Clifford, RIII Coordinator, EDO
- l H. J. Miller, Director, Division of Reactor Safety, RIII-T. O. Martin, Deputy Director, Division of Reactor Safety, RIII
{
G. C. Wright, Chief, Operations Branch, DRS, RIIIC. E. Norelius, Director
- j R. W. Cooper, Chief, Engineering Branch, DRS, RIII L. R. Greger, Chief, Reactor Prograrr.s Branch, DRSS, RIII'-
i B. S. Mallett, Chief, Nuclear Materials Safety Branch, DRSS, RIII-i J. O. Thoma, Acting Director, Directorate III-1, NRR J
D. C. Dilanni, Project Manager, NRR
{
n
,too3a.BOYSS 900,R/9
' PDAt AbocK c5000g g2. f
./
Ab4 5
- _ _ =. - _ __