ML20033F300

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 90-003 W/Util on 900313 in Limerick,Pa Re mid-SALP Cycle Self Assessment
ML20033F300
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/01/1990
From: Doerflein L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9003190334
Download: ML20033F300 (2)


Text

y t

01ER 1880 No. 30 030 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:

Philadelphia Electric Company 1

Facility:

Limerick Units 1 and 2 Docket Nos:

50-352/50-353 Time and Date:

1:00 p.m., March 13, 1990 Location:

Limerick Generating Station (Information Center)

Limerick, PA

Purpose:

Licensee Presentation on mid SALP Cycle Self Assessment NRC Attendees:

J. Wiggins Deputy Director, Division of Reacter Projet:ts (DRP)

R. Blough, Chief Projects Branch No. 2. DRP L. Doerflein. Chief, P.ea: tor Projectt Section 28, DkP T. Kenny, Senior Resideat Inspector L. Scholl, Resident Inspector M. Evans, Resident inspect.or D. Clark, Project Manager, PD l-2, NRR J. Nakoski, Reactor Engineer, Reactor Projects Section 28, DRP Licensee Attenaees: G. Leitch, Vice Pret edent, Limerick M. McCormick, Plaat Manager Other PECo personnel Note:

Attendance by NRC personnel at this meeting should be made known by 4:00 p.m. on March 9, 1990 via telephone call to L. T. Doerflein, Region I, at FTS 8-346-5378 or Commercial 215-337-5378.

Origind Signed By$i 0000 T. 00rtfl n Prepared by:

Lawrence T. Doerflein, Chief, RPS 2B 0FFICIAL RECORD COPY MEETING NOTICE 90-030 - 0001.0.0 02/28/90 b0

$0bbk bObbbb52 f

o' l Q

PDC y'

.s i

01 MAR 1980 l

Distribution:

l J. M. Taylor, Executive Director for Operations L

Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

H. Thompson, Deputy E,.mth e Dhv; tor for "velear Material Safety, Safeguards i

.and Operations Support (DEDS)

B. K. Grimes, Acting Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director Office of Enforcement T. E. Murley, Director, Office of Nuclear Reactor Regulation F. J. Miraglia, Associate Director for Inspection and Technical Assessment, NRR B. Boger, Assistant Director for Region I Reactors, NRR 4-J. Dyer, Regional Coordinator EDO L

S. Varga, Director, Division of Reactor Projects - I/II, NRR W. Butler, Director, Project Directorate I-2, NRR R. Clark, Project Manager, PD I-2, NRR Public Document Room (PDR) local Public Document Room (LPDR)

Commonwealth of Pennsylvania j

bec:

Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section Chiefs Public Affairs Officer (2 copies)

M.' Miller, RI Region I Recy ttonist DRMA Files

..t DRP ciles Bulletin Board i

M. J. DiConat o, ORf-S

-ff,RI:DRP RI:DRP Doerflein/rh1 iB gh L/LP o

~51 l93 -

OFFICIAL RECORD COPY MEETING NOTICE 90-030 - 0002.0.0 i

q/ -g, 02/27/90

.