ML20033F292
| ML20033F292 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 03/12/1990 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20033F293 | List: |
| References | |
| NUDOCS 9003190305 | |
| Download: ML20033F292 (2) | |
Text
-.....
4-TABLE 4.3-13 (Continued)
TABLE NOTAT10N (1) The CHANNEL FUNCTIONAL TEST shall also denenstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exist:
1.
Instrurent indicates ceasured levels at or above the alarm / trip setpoint.
2.
Circuit failure.
(Less of Power) 3.
Instrunent indicates a ewnscale failure.
(Alam Only) l.
(2) The CHANNEL FUNCTIONAL TEST shall also derenstrate that control room alarm annunciation occurs if any of the following conditions exist:
1.
Instrupent indicates measured levels at or above the alarm / trip setpoint.
2.
Circuit failure.
(Last of Power) 3.
Instrurent indicates a downscAle failure. (Indication on instrument drawer in Control Equiprent' Room only for 1R16) 4 Instrument controls not set in. operate rede. (Applicable to 1-R16 only)
(3) The initial CHANNEL CAllBRATION was perfor' red using appropriate liquid or gaseous calibration sources obtained from reputable suppliers. The activity of the calibration sources were reconfirred using a nulti-channel-analyzer which was calibrated using one or core NBS standards.
+
(4) The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal:
1.
One volure percent oxygen, balance nitrogen, and 2.
Four volure percent oxygen, balance nitrogen.
At all tires During waste gas holdup system operation.
During containment purge or containment pressure-vacuum relief SALEM - UNIT 1 3/4 3-69 Amendment No. 79 Correction Letter for Amendment 79 dated March 12, 1990 9003190303 900312 l
{DR ADOCK 05000272 PDC
t g
v P
tir. Steven E. Miltenberger Public Service Electric & Gas Company Salem Nuclear Generating Station cc:
Mark J. Wetterhahn, Esquire Richard B. McGlynn Comission Conner and Wetterhahn DepartmentofPub1IcUtilities Suite 1050 State of New Jersey 1747 Pennsylvania Avenue, NW 101 Comerce Street Veshington, DC 20006 Newerk, NJ 07102 Richard Fryling, Jr., Esquire Regional Administrator, Region I Lew De)artment - Tower SE U. S. Nuclear Regulatory Comission 80 Part Place 475 Allendale Road Newark, NJ 07101 King of Prussia, PA 19406 Mr. L. K. Miller Lower A110 ways Creek Township General Manager - Salem Operations c/o Mary O. Henderson, Clerk Salen Generating Station Munici)al Building, P.O. Box 157 P.O. Box 236 Hancocts Bridge, NJ 08038 Hancocks Bridge, NJ C8038 Mr. Bruce A. Preston, Manager Mr. S. LaBruna Licensing and Regulation Vice President - Nuclear Operations Nuclear Department Nuclear Department P.O. Box 236 P.O. Box 236 Hancocks Bridge, NJ C8038 Hancocks Bridge, New Jersey 08038 Mr. David Wersan Mr. Thomas P. Johnson, Senior P.esident Assistant Consumer Advocate Inspector Office rf Consumer Advocate Salem Generating Station 1425 Strawberry Scuere U.S. Nuclear Regulatory Comission Harrisburg, PA 17120 Drawer I Haneceks Bridge, NJ 08038 Mr. Scott B. Ungerer PGR. - Joint Generation Projects Dr. Jill Lipoti, Ph.D Atlantic Electric Company New Jersey Departrent of Environmental P.O. Box 1500 Protection 1199 Black Horse Pike Division of Environmental Quality Pleasantville, NJ 08232 Radiation Protection Programs l'
State ef New Jersey Mr. Jack Urban CN 415 General Manager, Fuels Department Trcnton, NJ 08625 Delmarva Power & Light Company 600 King Street Maryland Peopic's Counsel Wilmington, DE 19899 Americen Building, 9th Floor 231 East Baltimore Street Public Service Comission of Marylard Baltimore, Maryland 21202 Engineering Division ATTH: Chief Engineer tir J. T. Robb, Director 231 E. Baltimore Street Joint Oy:ners Affairs Baltimore, MD 2120?-3486 i
Philadelphia Electric Company 955 Chesterbrook Blvd., 51A-13 Wayne, PA 19087 l
_