Text
-n.
l 6N h
00CKE100 UNITED STATES OF AMERICA UbHRC NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARdR) MAR -5 P7 :25 Before Administrative Judges pier or ncat:TARY Peter B. Bloch, Chair Y)oCKEld A SI PVICI Dr. George C. Anderson BRANC5i j
Elizabeth B. Johnson I
i i
i t
In the Matter of
)
Docket Nos. 50-250-OLA-5
)
50-251-OLA-5 FLORIDA POWER & LIGHT
)
COMPANY
)
Technical Specifications Turkey Point Plant
)
Replacement (Unit Noc. 3 and 4)
)
)
ASLBP No. 90-602-01-OLA-5 Facility Operating
)
Licenses Nos. DPR-31, DPR-41 )
)
February 28, 1990 ADDRESS CORRECTION On February 22,
- 1990, the Nuclear Energy Accountability Project (NEAP) filed a
Notice of Address Change.
The U.S.
Government assigned NEAP an incorrect zip code at the time of registration for the post office box number assignment.
Please note the following address for NEAP as being correct:
In the future, all correspondence to NEAP should be aailed f-to the following address:
Nuclear Energy Accountability Project f
Post Office Box 129 Jupiter, Florida 33468-0129 t'
We apologize for the U.S. Government and any inconvenience their error may have caused the parties.
Respectfully submitted.
Thomas J.
Saporito, Jr.
cc: Service sheet Executive Director, NEAP Nuclear Energy Accountability Project Post Office Box 129 Jupiter, Florida 33468-0129 o
002 (407) 743-0770 05
])5
y J
-o.
p F
l' l
UNITED STATES OF AMERICA IEhCID MEC NUCLEAR REGULATORY COMMISSION j
ATOMIC SAFETY AND LICENSING BOARD j
'90 mR -5 P7 :25 i
f Before Administrative Judges Peter B.
Bloch, Chair Dr. George C. Anderson gNICE N SECRUARY Elizabeth B. Johnson M $%I FVICI-1 In the Matter of
)
Docket Nos. 50-250-OLA-5
)
50-251-OLA-5 1
FLORIDA POWER & LIGHT
)
COMPANY
)
Technical Specifications Turkey Point Plant
)
Replacement (Unit Nos. 3 and 4)
)
)
ASLBP No. 90-602-01-OLA-5 Facility Operating
)
Licenses Nos. DPR-31, DPR-41 )
)
CERTIFICATE OF SERVICE i
I hereby certify that copies of Petitioners' " ADDRESS CORRECTION" in the above captioned proceeding, were served on e
the following by deposit in the United States mail, first class, properly stamped and addressed, on the date shown below, t
Honorable Peter B. Bloch, Chair Janice E. Moore, Esq.
t' Atomic Safety and Licensing Board Patricia A.
Jehle, Esq.
U.S. Nuclear Regulatory Commission Office of General Counsel Washington, D.C. 20555 Nuclear Regulatory Comm.
Washington, D.C. 20555 Honorable Dr. George C. Anderson John T.
Butler, Esq.
Atomic Safety and Licensing Board Steel, Hector & Davis 450 Vista Chino, Apt. 2015 4000 Southeast Fin. Center Palm Springs, CA 92262 Miami, Florida 33131 Honorable Elizabeth B. Johnson Steven P.
Frantz, Esq.
Oak Ridge' National Laboratory Newman & Holtzinger, P.C.
P.O.-Box 2008 1615 L Street, N.W.
Bethel Valley Road, Bldg. 3500 Suite 1000 Mail Stop 6010 Washington, D.C. 20036 Oak Ridge..TN 37831 Office of the Secretary Atomic Safety / Licensing U.S. Nuclear Regulatory Commission Appeal Board Panel Washington, D.C.
20555 Nuclear Regulatory Comm.
Washington, D.C.
20555 Attn. Chief Docketing / Service Sect.
(Original plus two copies)
J -
' W-:
+: ^f2po r ffo, J r Dated this 2Bdb day of February, Thomas J.
1990 at Jupiter. Florida.
Executive Director, NEAP 1
v