ML20033F090
| ML20033F090 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 03/06/1990 |
| From: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20033F091 | List: |
| References | |
| CCN-90-14040, NUDOCS 9003150483 | |
| Download: ML20033F090 (1) | |
Text
I C Ch'- 9 0- 14 0 4 0 '
?
10CFR50, App J, VB3 c-PHILADELPIIIA ELECTRIC COMPANY PEACH BOTIOM ATOMIC POWER STAT 10N R. D.1, Box 208 Delta, Prnnsylvania 17314 m
reum servou ties possa or tacettamcs (717)456 7014 D M. Smith
. vice Penident March 6, 1990 l
Docket No. 50 278 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station Unit 3 Reactor Containment Building Integrated Leak Rate Test Gentlemen:
Attached is the Peach Bottom Unit 3 Reactor Containment Building Integrated Leak Rate Test (ILRT) Report for the ILRT performed in October,1989. This submittalis in accordance with 10CFR Part 50, Appendix J, Section V, paragraph B.
Sincerely, I
p DMS/MJB: cmc Attachment ec:
R.A. Burricelli, Public Service Electric & Gas T.M. Gerusky, Commonwealth of Pennsylvania J. Lyash, USNRC Senior Resident Inspector T.E. Magette, State of Maryland W.T. Russell., Administrator, Region I, USNRC l
H.C. Schwemm, Atlantic Electric J. Urban, Delmarva Power lL INPO Records Center 1:
l l-Icc060. doc
(,1 9003150483 900306 PDR ADOCK 05000278 P[-
_P' PDC gj
-- -- -