Advises That Util Enlisted Betz Industrial at Plant to Provide Treatment for Control of Zebra Mussels.Response to Ohio EPA Questionnaire & Proposed Routing of Molluscicide Encl
ML20033E331
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 03/01/1990
From: Szwejkowski J
CENTERIOR ENERGY
To: Chakrabarti R
COLUMBUS, OH
References
NUDOCS 9003120346
Download: ML20033E331 (3)


Text

l I

CENTE R

ERGY 820000k Tree Boulevoro Mod Accross inoepenoence OH P0 Box 94661 216 447 3100 Clevelone.0H 441014661 March 1,1990 PY-CEI/OEPA 0099L 5

Mr. Raj Chakrabarti, Permits Section

=

OEPA Division of Water Pollution Control P.O. Box 1049 1800 Watermark Drive Columbus, Ohio 43266-0149 RE: Cleveland Electric Illuminating Company (CEI)

Perry Power Plant - NPDES Permit Number 3IB00016'CD Molluscicide (" Clam-Trol CT-1") Addition

Dear Mr. Chakrabarti:

CEI has enlisted Betz Industrial at its Perry Power Plant to provide treatment for control of zebra mussels (Dreissena polymorpha) with their molluscicide, " Clam Trol CT-1". The information in the enclosed attachments is provided for your review and approval prior to applying this treatment.

Attachment I provides responses to the Ohio EPA questionnaire entitled " Reporting 1

and Testing Requirements for Cooling Water System Additives".- The proposed routing of molluscicide is shown in Attachment 2. Water systems will be treated 2 to 3 times between June and November at a concentration of between 15 and 20 mg/l for 6 to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. This program will be conducted by Betz Industrial and monitored by plant environmental and chemistry personnel.

We feel that all the information needed to evaluate the use of Betz Industrial's

" Clam-Trol CT-1" at CEl's Perry Power Plant is enclosed. Our intention is to begin the treatment in June pending your approval, and we would therefore appreciate your notifying us of the results of your evaluation as soon as possible. Please call me at (216)447 3201 if you should have as y questions or need additional information, e

Sincerely, Joseph C. Szwejkowski Compliance Coordinator y

Centerior Environmental Services s

cc: USNRC Document Control Desk 3

P. Hiland T. Colburn PYo099L:1b-al.shwy/3-1-90 Gh 9003120346 900301 PDR ADOCK 05000440 g

p FDC

1 ATTACHMENT 1

o

\\

)

1 l

1.

The name of the additive.

The additive is " Clam-Trol CT-1" (Bet: Industrial).

2.

The concentration (mg/I) of the additive to be used.

Additive concentrations will be between 15 and 20 mg/l for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> la the June and August treatments, and 10 to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for the October / November treatment.

3.

The expected concentration of the additive c aed in the discharge or blowdown i

immediately prior to entering state surface water.

Zero discharge (0.0 mg/l) of the molluscicide will be achieved by adsorption onto bestonite clay added to the discharge prior to entry to Lake Erie.

4.

The flowrate (mad) of the discharge to state surface water.

The average flowrate for 1939 was g6.2 mad.

5.

Name of the state surface waters that receives the discharge.

The state surface water receivies the plant discharge will be Lake Erle.

6.

Toxicity information regarding additive to be submitted.

96 hour0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> LC50 - Rainbow. Trout

.34.7 mg/l 96 hour0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> LC50 - Fatherd Minnow 2.9 mg/l 96 hour0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> LC50 - Dluegill Sunfish 4J mg/l 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> LC50 - Daphala magna 0.4 mg/l

ATTACHMENT 2

(" Clam Trol CT'I' concentrations are shown in bold print)

Circulating Water 20 mg/l v

15 mg/l V

Adsorption (15 mg/l bentonite clay) i

>^.0 mg/l

-> Plant Discharge l

Adsorption (15 mg/l bentonite clay)

A 15 mg/l A

Service Water and l

Emergency Service Water 20 mg/l l

l A boat will be used to apply the mollucicide through a hose directly to the plant's submerged offshore intake structure (s).