U~0380 Ill/NOIS POWER COMPANY
((2 L30-81 (12-03)-6 500 SOUTH 27TH STREET, DECATUR, ILLINots 62525 December 3, 1981 l
Mr. James R. Miller, Chief Standardization & Special Projects Branch
/s Division of Licensing Y
t Office of Nuclear Reactor Regulation g@ gCy U. S. Nuclear Regulatory Commission a.-
l
//
-2 Washington, D. C.
20555 6
g%
79g
?
%l44,*l"
'l j
Dear Mr. Miller:
g
/
Clinton Power Station Unit 1)C/ 7
'A' I'?
Docket No. 50-461 I
Per discussion with 0. Parr, N. Fioravante and V. Panciera, Auxiliary Systems Branch, December 2,1981, NRC and IP agreed that.that to i
close the issue of the potential rupture of a condenser circulating l
water system flexible joint, IPC wuuld insure that there were redundant (non-safety related) level sensors in the condenser pit l
and that these would alarm in the control room; would install a flood proof _ door in the turbine / auxiliary bldg wall, with an alarm in the control room if the door is opened; would flood - proof the I
other penetrations in that wall; and would ensure the ability of the l
wall to withstand the pressure of water up to the ceiling of the turbine bldg. (~731'). We also agreed to estimate the time required j
to fill the turbine bldg with water an. submit this to the NRC.
l Sincerely, W
W J.D. Geier l
Manager, Nuclear Station Engineering l
Attachments cc:
J.H. Williams, NRC Clinton Project Manager H.H. Livermore, NRC Resident Inspector 30gl N. Fioravante, Auxilary Systems Branch 0..Parr, Auxiliary Systems Branch.
V. Panciera, Auxiliary Systems Branch 5
llo 8112070565 811 PDR ADOCK 0500 1
P.
P_