._.
/LLINUIS POWER COMPANY "y
L30-81 (12-01)-6 500 SOUTH 27TH STREET, DECATUR, ILLINOls 62525 December 1, 1981 Mr. James R. Miller, Chief Standardization & Special Projects Branch Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 i--
Dear Mr. Miller:
Clinton Power Station Unit 1 Docket No. 50-461 This memo serves to confirm that Illinois Power Company has.com-pleted the post accident shielding review as required by TMI action item II.B.2.
As agreed during the meeting of December 1,1981 Illinois Power Company will provide the radiation zone maps and identification of vital areas required by item II.B.2, no later than December 9, 1981. The remaining information will be provided in January 1982, as previously discussed. This schedule will allow sufficient time to implement modifications as deemed necessary prior to fuel load.
This item is considered to be confirmatory for CPS licensing purposes.
Sincerely, c.__b' s}h I.D.Geier Manager, Nuclear Station Engineering Attachments cc:
J.H. Williams, NRC Clinton Project Manager H.H. Livermore, NRC Resident Inspector M. LaMastra, NRC Radiological Assessment Branch 1
4,1 e l
gg'i2070329 811201?
PDRADOCK05000g A
-