/LLINDIS POWER 00MPANY L30-81 (l2-03)-6 500 south 27TH slREET. DECATUR, ILLINOls 62525 t
December 3,1981 l
Mr. James R. Miller, Chief
/
h i
Standardization & Special Projects Branch
/
4h Division of Licensi19
]%
\\
I 1
Office of Nuclear Reactor Regulation TO Og0 g
4 l
U. S. Nuclear Regulatory Commission k,,,,' g Washington, D. C.
20555
Dear Mr. Miller:
b Clinton Power Station Unit 1 Docket No.
50-461 Attached are details related to the following item which was discussed with F. Witt, Chemical Engineering Branch, during j
a meeting on December 2,1981, to resolve issues for the Clinton SER:
l ISSUE Section 6.1.2, Organic Materials Section This item is considered by the NRC and IP to be confirmatory in that IP has agreed to furnish material quantities to the NRC.
Sincerely,
/
/
f J. D. Geier Manager, Nuclear Station Engineering Attachments cc:
J.H. Williams, NRC Clinton Project Manager H.H. Livermore, NRC Resident Inspector F. Witt, NRC CEB t
9 0112070317 811203' PDR ADOCK 05000461' E
PDR;
1 '
l
,o w)
'a'
~,
I l
-Issue Section 6.1.2, Organic Materials Section
.Use of organic coatings inf:tead of qualified coatings in accordance wita ANSI standards on equipment.
I
Response
i l
f l
l l
l l
I-i l
i Action Required-
'y y t.
'IP-f 5x DotNC3 A SOMGry on 0.P1_/9/vo. oJiM :^5vem/T-?rif c. R-sovesni, iW(~et2;nAnoN oN (X)ANnTlg of /n A7tz2.;ALS,