ML20033C710
| ML20033C710 | |
| Person / Time | |
|---|---|
| Issue date: | 11/04/1981 |
| From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| To: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| REF-10CFR9.7 M811102B, NUDOCS 8112030713 | |
| Download: ML20033C710 (1) | |
Text
IN RESPONSE, PLEASE REFER T0: M811102B a reg'o -
'4 UNITED STATES 8*
i NUCLEAR REGULATORY COMMISSION
~ '
h
$~
WASHIN GTON. D.C. 20555 4
'+E November 4, 1981 OO OFFICE OF THE
- SECRETARY MEMORANDUM FOR: William J. Dircks, Executi Director for Operations FROM:
Samuel J. Chilk, Secreta g
SUBJECT:
STAFF REQUIREMENTS - DISC ION OF PART 170--NEW FEE SCHEDULE BASED ON-REEXAMI 4ATION OF MANPOWER ESTIMATES, 2:05 P.M., MONDAY, NOVEMBfR 2,1981, COMMISSIONERS' CONFERENCE ROOM, D.C._0FFICE (OPEN TO PUBLIC ATTENDANCE)
The Comission discussed with staff the proposed revisions to Part 170 fee schedules as stated ~1n SECY-81-615.
Staff stated that fees for radioisotopes.
licenses (small programs covered by Parts 30, 40, ~and 70) and for inspection of these programs have.not been revised. NMSS~ and IE do not presently use the actual cost method for detennining the costs incurred in processing new appli-cations, amendments or renewals or conducting inspections for these licenses t'ecause professional s'taTT time. expended for these reviews is not charged to' specific applicants or licensees.
Rather, it is~ charged to a broad category of license, e.g., medical institutions.
~
The Commission requested that:
1.
staff conduct a study to determine whether use of the a:tual cost method when determining fees for radioisotopes licenses would have a significant economic impact on a substantial number of small entities. The results of the study are to be presented to the Comission in February.
In the interim period, fees for the stated licenses and inspections-need not be revised.
(ADMIN /IE/NMSS)
(SECY Suspense: '2/26/82) 2.
the professional rate be recalculated based on actual FY 1981 costs-rather than on FY 1977 costs modified by inflation factors and salary increases.
(ADMIN)
(SECY Suspense:
11/13/81) 3.
staff provide a sumary of the total IE manpower involved in inspections and other major actions for which the costs are recovered and a sumary
-of the actions that involve the remainder of IE professional manpower expended.
(ADMIN /IE)
(SECYSuspense:
11/13/81) 4.
staff explain the basis for the policy decision whereby licenses issued to Federal', state and local governments and to nonprofit education institutions are exempted from fees.
An estimate of the funds invo}J ' "
ved is to be included.
(ADMIN)
(SECY Suspense: 11/13/81) g.
cc:
Chairman Palladino
""f' Comissioner Gilinsky du D
g g )ggpd9 Commissioner Bradford NOV Comissioner Ahearne -
Comissioner Roberts u.5+ g #
sm General. Counsel y
Public Document Room 7
8112030713 81110(
e PDR 10CFR "g
PT9.7 PDR