ML20033C690
| ML20033C690 | |
| Person / Time | |
|---|---|
| Issue date: | 11/27/1981 |
| From: | Mclearen T NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Rich Smith NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20033C691 | List: |
| References | |
| CON-NRC-02-77-160, CON-NRC-2-77-160 NUDOCS 8112030660 | |
| Download: ML20033C690 (1) | |
Text
Jo t u. s. gaxtr%u2NT coaste%, Gacec'I tsts-2st.vas 5
'4 NRC FJR*.* 255 CONTRACT Nu?. es R
- l.17a.
NRC-02-77-160 0 vt3iO4 OF CONTRACTS MOOIFICATIOfJ Nut.1EER u.s wetE 2R Recut ATORv Ccu.wssiON Seven(7)
WASHINGTON, D.C. 20$55 UNEW 0 MODIFICATION OTHE R ISore,*yl NOTIFICATION OF CONTRACT EXECUTION CONTRACr eAsEo On-R. Dale Smith; Chief To:
AUTHORIZATION NUMBE A
( T,tes low-level Waste Licensing Branch NMSS-77-26 Division of Waste Management, NMSS DATE May 12,1976
,0,m,,,,,,
TehsgcLeare#ge[am c nTRACT CHANGES PER MS ACTION a
11/30/81 Fnou:
o da r.->
Name of contractor is Technical $ssistance Contracts Branch-changed to Tek,neprl 'C' /,*
Research,Inc.d 4
31 N,1
~/
.f\\
(Rau L
L Divisios! OF CONTR ACTS, AD?.1 fj-nEC1 198 #
--. r n A:TOs m.,, - 4 w,,.o.-
EXECUTION OATE Teknekron Research, Inc.
11/27/(
Berkeley, CA
'g
<gs N.-
Tves OF CONTRACT CPFF PROJECT TITLE PERIOD OF PERFORMANCE Study to Determine the Country's 9/l/77 - 6/30/79 Waste Disposal Needs through the PRtNCIPAL INVESTIGATOR l
year 2000 l
NRC AUTHORIZED REPRESENTATIVE l
er.n Nu.tcE n.
AMOUNT l
I NEW NRC FUNDS S
0 FUNDING TOTAL FY FUNDING S
TOTAL NRC OcLIGATIONS S 1C4,704.00
- , J i lt'a%9t '4 T PF106'E li t v AT T ACHuE Nitsi Mod #7 CONT n act Docu.'r e.T i -
a
.i, s.. 6 L POR
'NRC-02-77-160.
J]
u
_