FNP-PST-093 Offohore Power Systems E o ) /m
,e rn;a rmo e 1a. '
Em 2n1 T,.
t,w,,
4
/%
fp Id November 11, 1981
/
g eq n v,.
Ms. Elinor Adensam, Chief
/D 6 Ub 2c Licensing Branch No. 4 S-U.S. Nuclear Regulatory Commission b DEC2 MP~
'{- u.s.cp*' [
7920 Norfolk Avenue
' ",,3 Bethesda, MD 10852 is
\\'%) 77
':i
'"lJ.f4 Y
Re: Docket No. STN-5437; ECCS/UHI P. B. Haga Performance Evaluation o.r.cso, no.., sy,t ms T.chnoiogy g
g, g g The following information is submitted in response to a--
telephone conversation on November 10, 1981 between Mr. D. C. Aabye of Offshore Power Systems and
~
Messrs. Mallory and Lauben of the NRC.
In Supplement No. I to our ECCS/UHI Analysis Report (Offshore Power Systems Topical Report 24A37, Supplement 1), we took the position that the analysis e
performed for a nearly-identical " reference" plant, in accordance with model changes approved by Staff in April 1978, could also be applied to the Floating Nuclear Plant.
Supplement No.1 notes the (few) design differ-ences between the Floating Nuclear Plant and the " reference" plant and demonstrates that these differences would have a minor effect on the results of the analysis, with more favorable results expected for the Floating Nuclear Plant in most cases.
The " reference" plant cited in Supple-i ment No.1 is Duke Power Company's McGuire Nuclear Station.
l Subsequent to the Staff's preparation of the evaluation of ECCS performance contained in SER Supplement'4, a Board l
Notification was issued (BN-79-36 dated November 2,1979) advising that clad swelling may not have been conservatively
(
modelled in light water reactor ECCS performance analyses.
In a letter dated September 15, 1980 Duke Power Company submitted'~an analysis of the effect on permissible peaking l
factors at McGuire of potential non-conservations in the 6
r 8112030348 811111 40 l
PDR ADOCK 05000437 J
i l
A PDR
$t 0 I
n
f
.-e
'l
[^
/
t
/-
Ms. Elinor Adensam, Chief November 11, 1981 0;'
Page Two
~
- 1 clad swelling model.
This analysis is based on calculated data using the April 1978 version of the ECCS/UHI evaluation model and shows that no peaking factor penalty is expected.
,t 1
I Offshore Power Systems adopts this refinement tc the overall ECCS/UHI performance analysis as being
+
'~ -
applicable to the Floating Nuclear Plant, just as
/
the entire original analysis was adopted in Supple-ment No. 1 to our ECCS/UHI evaluation report. A Floating Nuclear Plant specific analysis will be performed during the final design approval phase.
This analysis will form the basis for the peaking factor limits ultimately embodied in the Floating Nuclear Plant technical specifications.
Very truly yours, b%4 P. B. Haga