Responds to NRC Re Violations Noted in IE Insp Rept 50-341/81-08.Corrective Actions:Revised Procedures Covering Design Change Requests & Design Change Notices & Issued for Use
ML20033C502
Person / Time
Site: Fermi 
Issue date: 10/30/1981
From: Wells D
DETROIT EDISON CO.
To: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20033C498 List:
References
EF2-54711, NUDOCS 8112030328
Download: ML20033C502 (4)


Text

- - _ _. _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - - _ - _ - - - _ - - - _ _ - _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - - -

o Donald A. Wells g[

UCTND$? **"

M S O n W E P 2' October 30, 1981 EF2-54711' Mr. R.L. Spessani Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Cm mission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Nonempliance at Enrico Fermi Unit 2 Construction Site

Dear Mr. Spessard:

This letter responds to the item of nonempliance contained in your IE Report 50-341/81-08. This inspection of Enrico Fenni Unit 2 Site Con-struction activities was perfonned by Messrs. R.N. Sutphin, J.F. Schapkcr and P.M. Byron of NRC Region III on July 23-26, 1981.

Only the cited item of nonempliance is discussed in this reply, as re-quired by Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.

The enclosed response is arranged in sequence of items cited-in the body of your report. The finding and section numbers are referenced.. We trust this letter satisfactorily answers the concerns raised in your report. We will be glad to discuss any further concems you tray have.

Very truly yours, l)D)h JL) i DAW / HAW /cp cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Cmmission Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Cm mission i

Resident Inspector's Office 1

6450 North Dixie Highway Newport, Michigan 48166 t

f o

L-

a or THE DE,TROIT EDISON CCNPANY OUALITY ASSURANCE DEPARCETT ENRICO FERMI 2 PROJECT Response to NRC Report No. 50-341/81-08 Docket No. 50-341 Liccnse No. CPPR-87 Inspection at: Fermi 2 Site, Monroe, Michigan Inspection conducted: July 23-26, 1981 Prepared by:

I H.A. Walker, Supervisor Construction Quality Assurance Approved by:

10 i A

T.A. Al ssi, Direc &

Project Quality Assurance

Page 2 cf 3 Respcnse to NRC Inspection Report # 50-341/81-08 Statement of Violation 81-08, Appendix A (81-08-01)

Contrary to 10CFR50, Appendix B, Criterion II and the Enrico Fermi Unit 2 Quality Assurarm Manual, Sections 1.0.1, 1.3.3 and 1.3.6.4, the Project Procedures Manual has not been imintained up-to-date with current forms and practices in that Exhibit B.3-1 of Section 3, Configuration Control, has obsolete sections on the approvals required and the flow pattern for submittal and disposition of: Record (as-built), (DCR) Design Change Request (s), (DCN) Design Change Notice (s), and (ENR) Field Modification Request forms compared to the A402.1 (12-80) form currently in use.

Corrective Action Taken and the Results Achieved The procedures covering Design Change Requests and Design Change Notices have been revised and issued for use. These procedures accurately doc-ument the form currently in use for Record (as-built), Design Change Request, Design Change Notice and Field Modification Requests as well as the approvals required. Forms currently in use cmply with procedural requirements both in format and required approvals.

Corrective Action Taken to Avoid Further Nonempliances Project organizations are aware that procedures must be followed in all areas including the approval of and format of required documents. Quality Assurance has issued a letter reminding organizations performing safety related work of this requirarent.

Date When Full Cmpliance Will Be Achieved The Fermi 2 Project is now in cmpliance with requirements.

O Page 3 of 3 The foregoing statenents based on facts and circumstances which are true and accurate to the best of my knowledge and belief.

A s fA da~

II.A. Walker, Supervisor Construction Quality Assurance Subscribed and sworn to before me this 29th day of October, 1981.

\\d k

k JENN$FIE KYKO Notary Public, Monroe County, MI My Commission Expires Nov.26,1984