ML20033B937

From kanterella
Jump to navigation Jump to search
Forwards Sargent & Lundy Minutes of 811020-23 Meeting W/Nrc & Util Re Structural Engineering Branch Design Audit
ML20033B937
Person / Time
Site: Byron, Braidwood  
Issue date: 11/23/1981
From: Tramm T
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20033B938 List:
References
NUDOCS 8112020477
Download: ML20033B937 (1)


Text

r *N Commonwealth ECson

~ ) one Fwst National P!:za, Ctucago. Illinois C

Address Reply to: Post Office Box 767

~

Chicago, Illinois 60690 November 23, 1981 C

h s

Mr. Harold R.

Denton, Director A

Office of Nuclear Reactor Regulation

/

b Al U.S. Nuclear Regulatory Commission DE01 1981* d Washington, DC 20555 1

Q **

y

Subject:

Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 T,/

f Structrual Design Audit N

g NRC Docket Nos. 50-454, 50-455, 50-456 and 50-457

Dear Mr. Denton:

This is to provide notes of the Structural Engineering Branch audit in Chicago on October 20 through 23,.1981.

Enclosed are meeting notes which indicate the actions to be taken to resolve the items open at the end of the Byron /Braidwood design audit.

Some of these actions have already been completed.

Please address questions regarding these metters to this One (1) signed original and fifty-nine (59) copies of this letter and the enclosure are provided for your use.

Very truly yours,

[10rfNis" T. R.

Tramm Nuclear Licensing Administrator Pressurized Water Reactors Attachment 293/N ot p%

!*mma333p eu i

.