Responds to .Differences Between Provisional & full-term OLs Explained & Reasons Why Facility Has Not Been Granted full-term OL Discussed
ML20033B743
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 11/06/1981
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Strohl J
WISCONSIN, STATE OF
Shared Package
ML20033B744 List:
References
NUDOCS 8112010744
Download: ML20033B743 (8)


Text

,

T NOV 0 S 1981 i

Docket No. 50-409

/

S d s.ogO le 3

D 4'

/Sg7 Tbc Honorable Joseph Strohl Hisconsin State Senate d

g%Q!g,%

'tadison, Wisconsin 53702

(

' h,, ; j ( W

Dear Senator Strohl:

Your letter of October 7,1981, to Colleen Woodhead has been referred ta re for rescense.

The Lacrosse PM11ng Wter Reactor, also known as Genoa #2, was built as part of the At g ic Eneroy Comission's ( AEC) second-round reactor denonstration progran by Allis-Chalmers flanufacturing Company under a contract with the AEC signed in June 1962. The site for the reactor was provided by Oairyland Power Cooperative (Dairyland). The reactor was ooerated initially by Allis-Chalners for the AEC under Provisional Operating Authorizatien 40. DPRA-5, issued on July 3,1967.

It was operatnd by Dairyland fron October 31, 1969, until August 28, 1973, under provisional Operating Authorization No. DPRA-6, and since August 28, 1973, it has been operated by Dairyland under Pro"4sional Operating License Ho.

OP9-45. On October 9,1974, Dairyland filed an application for conversion of the Provisional Operating License to a Full-Tem Operating License.

It was the policy of tho AEC, during the early years of power reactor development and operation, to issue Provisie*al Operating Licenses until it h3d been determined that the plant was operating as expected. This trial period was expected to last for about a year, at which tine a Full-Tem Operating License would be issued authorizing '.cuation for the estinated usaful life of the power plant, which is typ.cally 40 years from the date of issuance of the original construction remit. As more experience was gained in the construction and operation of central station nuclear power plants, this policy was changed to allow the issuance of one Full-Tem Operating License.

The only significant difference between the two types of licenses is in the expiration date. A provisional Licerse has a relatively short expira-tion date, usually about 18 nonths after issuance, whereas the Full-Tern License may have as ruch as a 40-year tem. However, if holders of Provisional Licenses nake timely filings to convert to a Full-Tem License, as has been done for Lacrosse, then the Provisional License continues in effect until the completion of the reviews regarding the conversion u

l

  • 8112010744 8111,06,......

goaanocx 03000 0 ena..........

...............i...............g unc roau :ns oown uncu ano OFFICIAL RECORD COPY usamm-me

( --

s

, request. All other provisions of the license, such as the Technical Specifications for plant operation, would remain the same, unless a need fcr additional requirements is identified during the Full-Tena License review.

After Dairyland's application for conycrsion was docketed in late 1974, the number of safety and environmentel requirements for new power plants rose rapidly. As a result, the Commission staff and Dairyland were not able to make significant progress in issuing the Full-Term License before 1977, when the Systematic Evaluation Program (SEP) started. The Commission then decided to incorporate the Full-Term License review regarding safety issues into the SEP so that the results of the SEP review could provide a basis for issuance of a Full-Term License. We completed our environmental review in 1980.

The objectives of the SEP are to:

1.

Assure the safety adequacy of the design and operation of the oldest currently-licensed nuclear power plants.

(Lacrosse Boiling Water Reactor is one of these plants and is, therefore, included in the SEP).

2.

Establish documentation which shows how these operating plants compare with current criteria on significant safety considerations, and to provide a basis for acceptance of any departures from these criteria.

3.

Provide the capability to make integrated and balanced decisions with respect to any required safety improvements.

While substantial improvements to meet new safety requirements have been made in each of these facilities since they were licensed, the improvements were generally based on analyses of individual systems or safety issues.

The SEP review will evaluate each plant as a whole to determine whether any remaining deviations from current requirements are acceptable or whether additional changes in design or procedures are required.

l l

l

I p

. The plants being evaluated in.this program include seven which have Provisional Operating Licenses, such as LLCrossc, and the results of the SEP review will be used to provide a detailed basis for issuance of a Ft.11-Term License for these plants. We plan to conplete the SEP for Lacrosse by January 1983. A public hearing regarding the license conversion may then be held before the Atonic Safety and Licensing Board, which is considering this application, and the Full-Term License will be issued if the Boart akes a favorable determination.

I hope this letter answers your questions.

Sincerely, Or:ginai sig::ed by

11. R. Dentos H'arold R. Denton, Director Office of Nuclear Reactor P.egulation DISTRIBUTION: ED0-10958 M ocket RCaruso ORB #5 RF HSmith NRC PDR EHughes LPDR 0 ELD TERA C"f. O}

NSIC MBridgers HDenton SCavanaugh ECase DNottinhgam DEisenhut RJohnson Glainas Prog. Support Staff DCrutchfield EDO Reading File RMattson SHanauer BSnyder TMurley RVollmer

  • SEE ATTACHED FOR PREVIOUS CONCURRENCE' DL:SEPB/C.

NRR OCA WTRussell HR on 11/02/81*

f/ /[81

/ /

p...t.

M ornce > D..L : 0.R.B....#. 5../..P.M.

DLORB #.5/LA DL:0RB #5/.C Dt.: AD/. SA -

OELD sua m.e> R,C,a,tu,sp,,:,rj,,,,

H Sm,1,th,,,,,,,,,,

, DCr,ut,chfield CWoodh,ead,

G CL,a i n a,s,,,,, ',,,,1,s,en hu,t,,,,,, E G,,. e.,,,,,,,,

. ATE >

nac ronu sia 0o-8o3 kncu cao OFFIClAL RECORD COPY usogo.\\,si-333. co

n_

t

. The ten plants being evaluated in this program include seven which have Provisional Operating Licenses, such as Lacrosse, and the results of the SEP review will be used to provide a detailed basis for issuance of a Full-Term

/

4 License for these plants. We plan to cornplete the SEP for Lacrosse by

/

January 1983. A public hearing regarding the license conversion my then be held before the Atomic Safety and Licensing Board, which is considering this application, and the Full-Tern License will be issued if the Board makes a favorable determination.

I hope this letter answers your questions.

Sincerely, Harold R. Denton, Dire or

_ Office of Nuclear Re tor Regulation r

DISTRIBUTION: ED0-10958 Docket RVollmer ORB #5 RF RCaruso NRC PDR HSmith LPDR EHughes TERA OELD 2

NSIC OCA(3)

HDenton MBridgers ECase SCavanaugh DEisenhut DNottingham Glainas RJohnson DCrutchfield EDO RF' RMattson SHanauer BSnyder TMurley i

/

  • SEE ATTACHED FOR PREVIO S

' CONCURRENCE.

DL:SEPB/C~

NRR:DIR' OCA L

WTRussell HRDenton

/

11/92/81*

11/ /81 11/ /81 uncei. 9k.;9&B..,f,5./,P,(1,0(,;4RB,,g/,(hDL,;pgBf,5,/,C,,,,,,p,E L,D,,,,,,,,,,,,, D,h@f,SA,,,,

, D L ; D I R,,,,,,,,,,

NRR,: D,/,D I,R,,,,,,,

.. S..m..i..t..h............

.D..C..ru..t..c..h..f..i e...l..d C..W..oo.dheadGCubas DEisenhut EGCase sunsaus >.R C..a r.u..s..o...:.r..jH

......../. 81 11/ /81 11/ /81 11 0

...... 0/. 26/. 81..*.

..10/. 2. 7../. 81*

1

...../. 28/.81

  • 11

......./. 2 7../. 81 * >

10

. oare >

wie ronu sta tio.aoi nacu oa-< \\ -

OFFICIAL RECORD COPY uso,o mi myeo

n

[s,.

'9 r

.[

. The ten plants being evaluated in this program inclube s n which have Provisional Operating Licenses, such as Lacrosse, and t results of the SEP review will be used to provide a detailed basis for is ance of a Full-Term License for these plants. We plan to complete the S for Lacrosse by January 1983. A public hearing regarding the lice e conversion raay then be held, and the Full-Term License will be issued if e Atomic Safety and issues a favorable decision.

I hope this letter answers your questions.

Sinc ly, arold R. Denton, Director Office of Huclear Reactor Regulation

. DISTRIBUTION: ED0-10958 Docket RCaruso ORB #5 RF HSmith NRC PDR EHughes LPDR-0 ELD TERA OCA (3)

NSIC MBridge s HDenton SCavan ugh ECase DNott nhgam-DEisenhut-RJoh soc Glainas Pro. Support Staff DCrutchfield ED Reading File RMattson SHanauer BSnyder TMurley RVollmer

[

  • SEE ATTA HED YELLOW FOR PREVIOUS i

CONCURR NCE NRR:DIR

-OCA DL:SEP8/C HRDenton l

/

WTRussell

/

11/02/81*

11/ /81 11/ /81 i

o,nm > pup.R#,,gl,P,M p,Wp,RB,(5f,(A, p,L,:p,RB,,,(5/,C,,,9,E Lp,,,,,,,,..,,

pl,; Ap/,SA,,,, pl;plR,,_,,,,

,N,R,R,;p/pj R,,,

.ua - > RCar,u,s,9,3,tj,,,,

H S,gi,th,,,,,,,,,,,,,g,Crutc,hf {e,1d CW@dh,ea,d,,,,, GCL,ai n as,,,,,,,, DE1 senh,ut,,,,

EG,C a s e,,,,,,,,,,,,

i

,,,11/.../.81

.../...../. 81 11

. 0./. 28../.81*

11/..../81

.... 0../ ?.7/. 81

  • 10 1

....../. 2 6/. 81 * - 10

. '.../. 27../.81

  • 1 om>
anc ronu ms oo.cos uscu cao OFFiClAL RECORD-COPY

. usce mi-m m

-,1

e +

' "e 3:

. The eleven plants being evaluated in this program include seven which have Provisional Operating Licenses, such as Lacrosse, and the results of

,/

the SEP review will be used to provide a detailed basis for issuance of a /

. e plan to complete the SEP for Lacrosse Full-Term License for these plants.

W

. by January 1983, and a public hearing regarding the license conversio 4f11 then be held. If the Atonic Safety and Licensing Board issues a f rable decision, the Full Term License will be issued after completion the SEP.

I hope this letter answers'your questions.

Sincerely, Harold R Denton, Director w

Office f Nuclear Reactor Regulation

.c l

DISTRIBUTION: ED0-10958 Docket RCaruso ORB #5 RF HSmith NRC PDR EHughes

,/

LPDR' OELD

/

TERA OCA (3)

/

NSIC MBri dger,s' HDenton

'SCavanadgh ECase DNotti'nhgam DEisenhut

.RJohnson Glainas Prog. Support Staff DCrutchfield-ED0 Reading File RMattson

/

SHanauer

/

7 BSnyder

/

TMurley -

RVollmer jf

-l.

/

  • SEE ATTACHED FOR PREVIOUS CONCURRENCE NRR:DIR

.OCA Ltt SfMN' HRDenton

/

/' /81

/ /81 DL.; pRB,,f,5!,PM,0,L,;0,R,B,,f,[/,L A

,D,(;0R,B,y,[/,C,,,,,,,0,E,(D,,,,,,,,,,,,,, )(;,AD,/,S,A,,,,,,,,, DL;,D,1,R,,,,,,,,

,' NRR,;p,(pJ,R,,,,,,,

cmcr>

...m. i.th..............DC.r..u...tc.h..f..i.e...l.d.

.C..W..o..o d.h..e.a.d.....

3 C.l..a..i.n...a..s..........

DE..i s..e..n..h..u t.....

E..G.C..a..s..e........

R..C..a..r..u..s..o..:.r..jHS..

~sua - c

.....10/.2Z/.8.1.?.......10/.2.6/.81?......10/.22/.61?...10!.28/.6.1.*.

....... L../.8.1.....,,,,,,,, L,,, / 81.,,,,,,,,,,L,.,/.8.1,...

em>

NRC ForsM 318 00-80) NRCM 0240

., OFFICIAL RECORD COPY usom. sui-asseo '

c w

p 1

f'.

, The eleven plants being evaluated in this procram include seven which

/

have Provisional Operating Licenses, such as Lacrosse, and the results off the SEP review will be used to provide a detailed basis for issuance oPa Full-Term License for those plants. We plan to complete the SEP for l'aCrosse by January 1983.

If the Atonic Safety and Licansing Board issues 4 favorable decision, the Full Tern License will be issued after conpletiofr'of the SEP.

I hope this letter answers your questions.

/

/

/

Sincerely.

,/

/

/

Harold p[Denton, Director Offi,ciof Nuclear Reactor Regulation DISTRIBUTION: ED0-10958

/

Docket RCaruso

/

ORB #5 RF HSmith

/

NRC PDR EHughes LPDR OELD TERA OCA (3)

NSIC MBridgers HDenton -

SCavanad'gh ECase DNottinhgam DEisenhut RJohnson Glainas Prog. Support Staff DCrutchfiel d E00 Reading File RMattson SHanauer BSnyder TMurley RVollmer f

i NRR:DIR OCA HRDenton 9 /jpg /

999,,/

)

/ /81

'l

/81 t.9.b.B,,,@,/,P,M,,,QL,qp,W,(5/,y,,,h(hR,B,(5LC

,b, HELD,,,ib

,DL,;,AD/,S,A,,

D L,: D I R,,,,,,,,,,

,N,R R,: DLD,I,R,,,,,,

onck.R,g,aru,s,g,:,,rj,,

,HS,g,{tV,,,,,jkg,C,[,u,tc,h,f,j,9,] h

,,,,,,,7,,g,g,Lai nas,,

DEisenhut EGCase 1

.oR,

....jp.../..x.. 7. 8..1...j. 0......@,,,,,,.81[.

...g.,/gj./.8.1.......t.)..../.p....8.1............./....../.8..1../...../. 81....../....../.8..1......

oar.p NRC FORM 318 (10-80) NRCM ONO kj?fd ' OFFICIAL RECORD COPY usoeo. mi-mm

pote

ROUTING-AND' TRANSMITTAL SUP 10/28/81 initials Date TO
(Name, oNice symbol, room number, Dullding, Agency / Post)

R. Caruso

_g 2.

3. ~
4. -

5.

Action File -

Note and Return Approval For Clearance Per Converration As Requested For Correction Prepare Reply Circulate For Your Information See Me Comrpent favestigate Signature Coordination Justify REMARKS The second full sentence on_ page 2'seems over-

-stated.

I would suggest something along the lines of:

Major modifications of the facility are not expected as a result of the. full term.

review.since the Commission's staff performed an adequate evaluation of facility. safety prior to the issuance of the provisional license, and technical

(

l

. specifications are frequently updated -

l to reflect new safety requirements.

l l

l DO NOT use this form as a RECORD of approvals, concurrences, disposals, clearances, and sigilar actions Room No.-Bldg.

FROM: (Name, org. symbol, Agen

-]'

Joe Scinto

% g,,

so41-102 -

"G-OPTIONAL F0ftM 41 (Sev. 7-76)

W

'IN

- pu,s.cro: sere-o.1stes4r 33s4 f

l