Forwards Annual Rept of Tests,Changes or Experiments Performed Between Jul 1980-June 1981 W/O Prior Commission Approval or Not Described in FSAR
ML20033B477
Person / Time
Site: Pilgrim
Issue date: 11/18/1981
From: Morisi A
BOSTON EDISON CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20033B478 List:
References
81-267, NUDOCS 8112010451
Download: ML20033B477 (1)


Text

_ _ _ _ _ _. _. _ _ _ _ _ _ _. _ _. _ _ _ _ _ _ _ _ _ _ _. _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

c.

9 BOSTON EntsON COMPANY QENERAL OFncta 500 Bo'.LaTON STarst BOSTON. MAasAcNumrTTs D2199 A. V. M O RISI MANAGER NUCLEAR OPERATIONS SUPPORT DEPARTMENT November 18,1981 BECo. Ltr. #81-267

.(

pp -

Mr. Ronald C. Haynes, Director Office of Inspc-tion and Enforcement NOV3 01981* -

Region I U.S. Nuclear Regulatory Comission kq,,,,.

631 Park Avenue g,,-

coawiuma King of Prussia, PA.

19405 g

A License BPjfsh Docket No. Or:293' Annual Report of Tests, Changes or Experiments Performed at Pilgrim Unit #1

Dear Sir:

In accordance with 10 CFR 50.59(b) Boston Edison hereby submits a report containing a brief description and a safety evaluation of all design changes implemented at Pilgrim Nuclear Power Station during the previous year.

This report encompasses reportable modifications implemented between July 1.

1980 and June 30, 1981 which were made, as authorized by 10 CFR 50.59 (b) without prior Commission approval, and tests and experiments not described in the FSAR which were performed under the provisions of 10 CFR 50.59.

We regret that, due to the increased work-load engendered by our current refueling outage, the submittal of this report was slightly delayed.

Very truly yours, M

b /lVNk Attachments cc: Director i

Office of Inspection & Enfircement U.S. Nuclear Regulatory Comm.i,ssion c/o Distribution Services Branch,;DCC, ADM Washington, D. C.

20555

/f 8112010451 811118 h5

~

9 gDRADOCK0500