ML20033B273
| ML20033B273 | |
| Person / Time | |
|---|---|
| Site: | Bailly |
| Issue date: | 11/04/1981 |
| From: | Lebo C NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Heller L, Muller D NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) |
| Shared Package | |
| ML20033B274 | List: |
| References | |
| CON-FIN-B-6815, CON-NRC-03-79-157, CON-NRC-3-79-157 NUDOCS 8112010162 | |
| Download: ML20033B273 (1) | |
Text
D U. S. CovEGNu2NT PERNTINO GjiflCE 1970-252-M4 CONTRACTNUusER NRC FORat 255
^
- 10-761 NRC-03-79-157 MODIFICATION NUMBER DivtSiON OF CONTR ACTS
~
One u.S. NUCLE AR REGUL ATORY CCA1 MIS $10N WASHINGTON. O.C. 00555 ONEW U MODIFIC ATION OTHE R ISpecorvi NOTIFICATION OF CONTRACT EXECUTION CON'"^CT SASED ON:
Daniel R. Muller, Assistant Director for TO:
AUTHORIZATION NUMBER Environmental Tech'rI5 fogy RFPA NRR-79-157 Division of Engineering.
Offi Nuclear Regulatory Research DATE
/'<o*0 -
9/13/79 I
/
(Or
\\
/
W.em#
Caf CONTRACT CHANGES PER THIS ACTION Cral
,d
. Le o, C ef 11/0 T/81 FROM:
tbarca To deobligate the balance of Administrative Contracts Branch
$620.00 remaining under this contract;'so that this contract DtylSION OF CONTRACTS, ADM f
,nro s
M al
'T % V\\
NOV0 4 iss; D.h IW/u Ih) Y\\
EXECUTION DATE ec;TRA:TOa tu,,, a tear o,,/
November 4,1981 Dr. M. T. Davisson
~
m.a.
h TYPE OF CONTRACT Champaign,. Illitiois 61820 U
Time ch lia PERIOD OF PERFORMANCE PROJECT TITLE 9/23/79
- 4/30/80 Review of Proposed Pile Foundations for PRtNCIPAL INVESTIG ATOR Bailly Nuclear Generating Station NRC AUTHORIZED REPRESENTATIVE L. W. Heller 86815 31X0200.209 AMOUNT 20-19 01-04-1 MMKXXRXXM1X DE0BLIGATE s
620.00 FUNDING MVXX.XX5XXX*UtMNH.
s TOTAL NRC OBLIGATIONS S
5,380.00 A T T ACHME NT(S).
'.8re F inaMk N T PRUDE (1 TY None CONT n ACT DocuvENT i 1
- .. I r,;c
.v.,
8112010162 811104 1
- o n..
_.