Requests Extension of Exam Period for Volumetric Exam of Weld Supports Per .Extension Would Allow Unit 1 to Update Inservice Insp Program for 40-month Exam During Refueling Outage Scheduled for Sept 1982
ML20033A773
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/18/1981
From: Beckham J
GEORGIA POWER CO.
To:
Office of Nuclear Reactor Regulation
References
TAC-47829, TAC-47830, NUDOCS 8111270251
Download: ML20033A773 (2)


Text

_.

Georg;a Power Company 333 Piedmon! Avenue s

At anta, Geo<gia 30308

. Teephone 404 526-7020 Ma ing Aaoress.

Post Oece Bcx 4545 Adanta Georga 3G302 Georgia Power N#

J. T, Beckham, Jr.

V'ce Prescent end General Manager Nuclear Genmation Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, tFF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 INSERVICE INSPECTION OF ASE CATEGORY B-K-1 WELDED StPPORTS - RELIEF REQUEST Gentlemen:

In accordance with the requirements of the 1974 edition of ASE Section XI, Category B-K-1 welded supports require a volumetric examination.

These particular supports on Hatch Units 1 and 2 have historically been difficult to examine volumetrically (UT) due to geometrical configuration.

The 1977 edition of ASE Section XI with addenda through Summer 1979 which has been approved by NRC requires only a surface examination for these supports.

In addition, the 1980 edition of Section XI which may be approved in the near future requires caly a surface examination.

The upcoming refueling outages originally scheduled for January 1982 (Unit 2) and April 1982 (Unit 1) are the last major outages which are to be covered by the 1974 edition of the code.

As a result of the core reconstitution outage discussed in our letter dated October 7, 1981, the Unit 1 refueling outage will not begin until September 1982.

A mandatory update to the 1977 edition (1980 if approved) is required by 10 CFR 50.55a by January 5,1983 for both units.

Unit 1 would normally update by August 30, 1982.

However, we have requested by letter dated November 10,.1981 an extension of the current inservice examination period to allow completion of all remaining second forty-month period examinations during the refueling outtge now scheduled for September 1982.

If approvsl is granted for the extension, Unit 1 would update its program for the third forty-month period of commerical operation on January 5,1983 which coincides with the program update for Unit 2.

After that date, a surface examination will be the only examination required for Units 1 and 2 B-K-1 supports.

Surface examination methods provide a high degree. of reliability in detecting flaws in welded supports.

Since a surface examination of B-K-1 supports will be required in the future, Georgia Power Company plans to perform surface examinations in lieu of volumetric examinations for those category B-K-1 supparts scheduled for examination during the upcoming outages.

8111270251 811118 6

PDR ADOCK 05000321 PDR

' bi.O 0

1

-.s.

u

? Georgia Pbwer d '

1.

Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory' Commission November 18. 1981 Page Two

- Your concurrence with this course -of action is requested..Due.to the impending need.to.make the necessary arrangements for performing the examinations during the upcoming outages, 'please advise us if you. have any objections to the course of action discussed herein.

If you have any questions in this regard, please contact this office.

Sincerely yours, 4

u d.T.Beckham,Jr.