ML20033A763
| ML20033A763 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 11/19/1981 |
| From: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20033A764 | List: |
| References | |
| 14871, NUDOCS 8111270237 | |
| Download: ML20033A763 (2) | |
Text
,_ _.
Consumels Power Jernes W Cook 0Nhbf Vice President - Projects, Engineering and Construction General Offices: 1945 West Pernall Road. Jackson, MI 49201 * (517) 78& o453 November 19, 1981 0 '
- j d fh L
NOV2 51981s.9 Harold R Denton, Director 3
$% O s
Office of Nuclear Reactor Regulation p
US Nuclear Regulatory Commission N
Washington, DC 20555 83 MIDLAND PROJECT MIDLAND DOCKET NOS 50-329, 50-330 PRESERVICE INSPECTION PROGPAM FILE 0230.3 SERIAL 14871
REFERENCE:
SHH0WELL LETTER TO ROGER BOYD DATED OCTOBER 5, 1978 ENCLOSURE: MIDLAND PLANT UNITS 1 AND 2, VOLUME 1: PRESERVICE INSPECTION PLAN Enclosed with this letter are ten copies (Copy Numbers 19 - 28) of Volume 1, "Preservice Inspection Plan," of the "Preservice and First 10-Year Interval Inspection Plan for Nondestructive Examination and System Pressure Tests at Consumers Power Company Midland Plant Units 1 and 2."
This plan supersedes the plan transmitted by the above reference and is submitted in response to NRC Requests for Additional Information 121.14 and 121.23 relative to the Midland Operating License review.
Consumers Power Company reserves the right to revise this plan if changer kn.
made to Section XI of the ASME Code which Consumers Power Company determi. : )
are in its best interests to implement and which are accepted by means of a change to 10CFR50.55a or which clarify the intent of ex1 sting versions of the ASME Codc.
It should also be recognized that revisions to this plan may become necessary because of changes to the design or construction of the plant.
Certain data reported in Section 3 of the plan relative to the " Number of Areas Subject to Examination" and " Number Subject to PSI" are preliminary ar.o subject to change as construction progresses.
jO *
\\
0\\
Y.
'10 8111270237 811119 J
PDR ADOCK 05000329 qs N G
PDR oc1181-0482a100 ~
l 1
i
. _ _ _. J
I h
2 Volume 2, " Inservice Inspection Plan," will be submitted to the NRC six months prior to anticipated commercial operation of Midland Plant Unit 2 as stipulated in NRC Request for Additional Information 121.1.
JVC/GEC/dsb CC RJCook, Midland Resident Inspector i
l I
i l
l l
oc1181-0482a100