ML20033A661

From kanterella
Jump to navigation Jump to search
Forwards SNM Rept TJ-23 Re Shipments of Nuclear Waste to Nuclear Engineering Co in Beatty,Nv During Jan 1970-Dec 1976
ML20033A661
Person / Time
Site: 02700010
Issue date: 10/22/1981
From: Robertson J
NRC
To: Dragonette K
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20033A660 List:
References
REF-WM-8 NUDOCS 8111250710
Download: ML20033A661 (19)


Text

_

i u __ c...

m-m-

s r-

\\]f

'hb y.-

UNITED STATES y'

g

5. ' '

NUCLEAR REGULATORY COMMISdlON WASHINGTON, D.C. 20555

.....f t

MEMORANDUM FOR:

Kitty Dragonette j

FROM:

June P. Robertson I

SUBJECT:

SHIPMENTS OF WASTE TO NUCLEAR i

ENGINEERING C0., BEATTY, NEVADA 1/1/70 THROUGH 12/31/76 Per your request, enclosed is a summary of NMMSS l

Report No. TJ-23, showing shipments of nuclear waste to Nuclear Engineering Co., Beatty, Nevada, during the period January 1, 1970 through December 31, 1976.

}

If you have any questions concerning the summary, please contact me on 74400.

AL ne P. Robertso.

i i

f$dI Q jo eIIO22 WM-13

.PDR

W M - l3 t

SHIPMENTS OF WASTE TO NUCLEAR ENGINEERING CO., BEATTY,' NEVADA FOR THE PERIO0 1/1/70 THROUGH 12/31/76 j

DATE OF ENRICHED URANIUM PLUT0NUIM Pu-238 U-233 TOTAL AMOUNT OF WASTE

I SHIPMENT FROM (qrams)

(orams)

(orams)

(arams)

(grams)

'=

1970 f

i 12/29 General Electric - Vallecitos 2,755.00 2.755.00 g'

l 6/30 General Atomic - San Diego 543.00 543.00 I

7/22 General Atomic - San Diego 882.00 882.00 8/26 General Atomic - San Diego 605.00 605.00 1

9/4 General Atomic - San Diego 781.00 781.00 1

10/8 General Atomic - San Diego 287.00 287.00 10/15 General Atomic - San Diego 532.00 532.00 10/30 General Atomic - San Diego 296.00 296 00 11/6 General Atomic - San Otego 297.00 297.00 11/16 General Atomic - San Diego 703.00 703.00 11/20 General Atomic - San Diego C5; 09 556.00 12/14 General Atomic - San Diego

!!0.97 770.00 Un 8/18 General Electric - San Jose 6.00 9/10 General Electric - San Jose 587.00 1.00 588.00 8/27 General Electric - Sin Jose 91.00 91.00 1,539.00 1,539.00 9/10 General Elecrtic - San Jose 10/16 General Electric - San Jose 4,636.00 26.00 4,662.00 10/21 General Electric - San Jose 415.00 415.00 10/21 General Electric - San Jose 467.09 467.00 12/29 General Electric - San Jose 82.00 82.00 12/23 General Electric - San Jose 133.00 133.00 8/18

- General Electric - Vallecitos 96.00 24.00

-120.00 8/20 General Electric - Vallecitos 7.00 7.00 j#

155.0c 8/27 General Electric - Vallecitos 155.00 3

9/10 General Electric - Vallecitos 32.00 18.00y 50.00 10/21 General Electric - Vallecitos-425.00 425.00

{

i7,7479 shipped in 1970 1971 6/22 Rockwell International 13.00 13.00 6/22 Rockwell International 26.00 26.00 6/23 Rockwell International 24.00 24.00 13.00 13.00 6/22 Rockwell International 227.00 227.00 j-6/25 Rockwell International be y

+

j'

.js

.. m s

c J g. ; f + *

  • c I

d

~ _.

2-DATE OF ENRICHED URANIUM PLUT0NIUM Pu-238 U-233 TOTAL AMOUNT OF WASTE SHIPMENT FROM (grams)

(grams)-

(grams)

(grams)

(grams) 1971

'I i

2/17 General Atomic - San Diego 198.00 198.00 i

I 1/27 General Atomic - San Diego 5/19

. General Atomic. San Diego 14,763.00 49.00 14,812.00

.I 6/3 General Electric - Vallecitos 5.983.00 10.00 5,993.00 6/18 General Electric - Vallecitos 2,535.00

, 2,535.00 6/22 General Electric - Vallecitos 791.00 2.006 793.00 7/7 General Electric - Vallecitos 34.00 12.00

~ 46.00' i

7/8 General Electric - Vallecitos 3.00 3.00 1

7/2 General Electric - Vallecitos 339.00 339.00 8/5 General Electric - Vallecitos 6.737.00 11.00 6,748.00 7/2.

General Electric - Vallecitos 11.00 3.00 14.00 7/2 General Electric - Vallecitos 185,00 79.00 264.00 11/19 General Electric - Vallecitos

' 811.00 811.00 11/19 Ceneral Electric - Vallecitos 240.00 2.00 242.00 1

12/8 General Electric - Vallecitos 28.00 20.00 48.00-

)

12/20 Lawrence 8erkeley Lab 8.00 5.00 1.00 14.00 j

4/6 Lawrence Livermore Lab 135.00 135.00 6/7 Lawrence Livennore Leo 77.00 77.00 t

7/26 Lawrence Livermore Lab 80.00 80.00 9/22 Lawrence Livermore Lab 86.00 86.00 11/17 Lawrence Livermore Lab 63.00

.63.00 12/27 Lawrence Livennore Lab 29.00 29.00 t

3/31 General Electric - Vallecitos 1.00 1.00 I

11/6 General Atomic - San Diego 297.00

'297.00 l

11/16.

General Atomic - San Diego 703.00 703.00 i

11/20 General Atomic - San Diego 556.00 556.00 12/14-General Atomic - San Diego 770.00 770.00 1/12 General Atomic - San Diego 531.00 531.00 2/1 General Atomic - San Diego 609.00 609.00 2/5 General Atomic - San Diego 618.00 618.00 3/12 General Atomic - San Diego 606.00 606.00 2/17 General Atomic - San Otego 580.00 580.00 2/26 General Atomic - San Diego 628.00 628.00 3/19 General Atomic - San Diego 820.00 820.00 3/3?

General Atomic - San Diego 752.00 752.00 4/9' General Atomic - San Diego 577.00 l

577.00 4/23 General Atomic - San Diego 563.00

! 563.00 i

g. g,.. '

, tf

.jy ' W j

i,

.s

,M,e.w-

+ '/

-3..

a g

c l e*idt ' M.44,.

yQf g.,

.g ),,

g /W'

'JI

u; DATE OF-ENRICHED URANIUM PLUTONIUM Pu-238 U-233 TOTAL AMOUNT OF 1ES'TE

'l '

SHIPMENT

'FROM (grams)

(arams)

'(grams)

(grams)

(orams)

'{-

5/3 General Atomic - San Diego 723.00 723.00.

F[

5/11 General Atomic - San Diego 539.00 539.00

'6/4 General Atomic - San Diego 531.00 531.00 6/11 General Atomic - San Diego

.533.00 533.00 6/29 General Atomic - San Diego-536.00 536.00 7/9 General Atomic - San Diego 625.00 625.00 7/29 General Atomic - San Diego 529.00 529.00 8/2 General Atomic. San Diego 589.00 589.00 8/6 General Atomic - San Diego 536.00

-536.00 8/13 General Atomic - San Diego 536.00 536.00 202.00 8/18 General Atomic - San Diego 201.00 1.00 8/18 General Atomic - San Diego 91.00 91.00 8/19 General Atomic - San Diego 445.00 445.00' i

1, 8/27 General Atomic - San Diego 535.00 535.00

'[

9/1 General Atomic - San Diego 536.00 536.00

[-

.9/17 General Atomic - San Diego 536.00 536.00

~

I 9/24 General Atomic - San Diego 537.00 537.00 9/29 General Atomic - San Diego 536.00 536.00

-l 10/4 General Atomic - San Diego 536.00 536.00 i

10/14 General Atomic - San Diego 537.00 537.00

'i 10/29 General Atomic - San Diego 536.00-536.00.

11/1 General Atomic - San Diego 536.00 536.00 11/18 General Atomic - S'n Diego 536.00 536.00 L

11/19 General Atomic - San Diege 536.00 536.00 12/1 General Atomic - San Diego 89.00 89.00 178.00 12/22 General Atomic - San Diego 536.00 536.00 1/25 General Electric - San Jose-70.00 70.00-155.00 155.00 1/25 General Electri: - San Jose 1/27 General Electric - San Jose 3.00 3.00 t

1/27 General Electric - San Jose 74.00 74.00 167.00 167.00 3/24 General Electric - San Jose 3/24 General Electric - San Jose 608.00 60*.G0 5/5 G'.'eral Electric - San Jose 308.00 1.00 309.00 t

5/5

.Gencral Electric - San Jose 2,286.00 11.00 2.297.00 5/5 General Electric 'SanJJose 462.00 462.00 1

i 159.00 159.00-t 5/5 General Electric - San Jose 5/19 General Electric - San Jost 1,188.00 4.00' 1,192.00 t

3.00 5/19

. General Electric - San Jose 3.00, I,

t 4

_m._

. - ~._, m _

i 4

1

4 DATE OF

-ENRICHED URANIUM PLUT0NIUM-Pu-238 U-233 TOTAL AMOUNT OF WASTE SHIPMENT FROM' (arams)

(arams)

'farams)

(arams)

(arams) 6/3 General Electric'- San Jose 6,602.00 25.00 6,627.00 6/18 General Electric - San Jose 1.786.00 8.00 1,794.00 L

6/22 General Electric - San Jose 14,878.00 69.00 14,947.00 7/8 General E1cetric-- San Jose 280.00 2.00 282.00 8

7/2 General Electric - San Jose 5,967.00 5, % 7.00

?

8/5 General Electric - San Jose

.977.00 4.00 981.00 10/1 General Electric - San Jose 752.00 752.00

[

10/22 General Electric - San Jose 6,373.00' 6,373.00 7/2 General Electric - San Jose 11/19 General Electric - San Jose 2,906.00 12.00 2,918.00 l:

11/19 General Electric - San Jose 296.00 1.00 297.00 12/8 General Electric - San Jose 3.00

-3.00 103,7109 shipped in 1971 1972 4/4 Lovelace Research Institute 5.00

.60 5.60 8/18 Lovelace Research Institute 11/15 Rockwell International 71.00 71.00 11/20 EAL Corporation 4.00 4.00 11/20 EAL Corporation 11/20 EAL Corporation 3/22 General Atomic - San Diego 89.00 89.00 e

4/3 General Atomic - San Diego 99.00 99.00 t

4/4 General Atomic - San Diego.

92.00 92.00 i

1/6 General Electric - Vallecitos 70.00 29.00 99.00 4

1/31 General Electric - Vallecitos 158.00 67.00 273.00 i

3/3 General Electric - Vallecitos 43.00 32.00 75.00

[

3/8 General Electric - Vallecitos 9.00 2.00 11.00 4/10 General Electric - Vallecitos 8.00 3.00 11.00 6/13 General Electric - Vallecitos 166.00 103.00 2'9.00 I

7/19 General Electric - Vallecitos 22.00 E2.00 7/31 General Electric - Vallecttos 43.00 32.00 75.00 8/4 General Electric - Vallecitos 11.00 6.00 17.00 f

10/4 General Electric - Vallecitos 59.00 18.00 77.00 10/24 General Electric - Vallecitos 165.00 165.00 11/1 General Electric - Vallecitos 3.00 3.00 12/8 General Electric - Vallecitos 88.00 88.00 12/21 General Electric - Vallecitos 28.00 11.00

,; 1, '

  • 39.00

,y a

a-I i

~ ~

m.

b t

[.

DATE OF ENRICHE0URANIW P1,UT0N!W Pu-238 U-233

. TOTAL. AMOUNT OF WASTEn SHIPMENT FROM (grams)

(gramt)-

(grams)

(grams)

(grams)

{

l-i 6/28 General Electric - San Jose 2.00 2.00 it 7/28 SEFOR 12.00 12.00

).

3/6 Lawrence Livermore Lab 45.00 45.00 3/28 Lawrence Livermore Lab 81.00 81.00 10/30 Lawrence Livermore Lab 51.00 51.00 1/6 General Electric - Vallecitos 125.00 23.00 148.00 1

2/4 General Electric - Vallecitos 227.00 227.00

's 1/31 General Electric - Vallecitos 3,431.00 91.00 3,530.00 3/8 General Electric - Vallecitos 297.00 297.00 k..

3/15 General Electric - Vallecitos 41.00 41.00 i

4/13 General Electric - Vallecitos 3,008.00 201.00 3,209.00 9

6/6 General Electric - Vallecitos 4,064.00 4,064.00 6/13 General Electric - Vallecitos 34.00

'.4.00 l

6/16 General Electric - Vallecitos 375.00 6.00 391.00

(

6/1 General Electric - Vallecitos 1,790.00 1,790.00

.s 6/26 General Electric - Vallecitos 5.00 5.00 5.00

[

7/19 General Electric - Vallecitos 313.00 1.00 314.00 7/28 General Electric - Vallecitos 290.00 3.00 293.00 l-8/4 General Electric - Vallec;*os 52.00 1.00 53.00 6

8/18 General Electric - Vallecitos 2,276.00 2.276.00 f

9/11 General Electric - Vallecitos 786.00 5.00 791.00 9/26 General Electric - Vallecitos 7,484.00 7,484.00 10/4 General Electric - Vallecitos 19.00 1.00 20.00 10/24 General Electric - Vallecitos 5,874.00 5,874.00 11/1 General Electric - Vallecitos 13.00 13.00 11/8 General Electric - Vallecitos 2,997.00 2,997.00 i

12/8 General Electric - Vallecitos 812.00 812.00 12/21 General Electric - Vallecitos 2,753.00 8.00 2,761.00 12/27 General Electric - Vallecitos 2.00 2.00 1/24 Rockwell International 108.00 108.00 t

3/30 Rockwell International 13.00 13.00 i

7/11 Rockwell International 16.00 16.00 11/15 Rockwell International 430.00 430.00 I

1/7 General Atomic - San Otego 536.00 536.00 1/21 General Atomic - San Diego 537.00 537.00

}

1/31 General Atomic - San Diego 536.00 536.00 2/4 General Atomic - San Diego.

536.00 536.00 2/14 General Atomic - San Diego 536.00 536.00 t

6 DATE OF ENRICHED UMNIUM PLUTONIUM Pu-238 U-233 TOTAL #f0VNT Of WASTE SHIPMENT FROM (orams)

(crams)'

(grams)

(grams)

~

(crams) 3/6 General Atomic - San Diego 537.00 537.00 3/17 General Atomic - San Diego 536.00 536.00 3/21 General Atomic - San Diego 41.00 41.00 3/22 General Atomic - San Diego 41.00 41.00 t

3/24 General Atomic - San Diego 588.00 588.00 4/3 General Atomic - San Diego.

52.00 52.00 4/4 General Atomic - San Diego 44.00 44.00 4/1')

General Atomic - San Diego 572.00 572.00 4/U General Atomic - San Diego 531.00 531.00 4/M General Atomic - San Diego 617.00 617.00 5/!

General Atomic - San Diego 531.00 531.00

.5/19 General Atomic - San Diego 537.00 537.00 5/J1 General Atomic - San Diego 539.00 539.00 6/7 General Atomic - San Diego 606.00 606.00 6f?2 General Atomic - San Diego 555.00 555.00 6 r19 General Atomic - San Diego 566.00 566.00 7 +7 General Atomic.- San Diego 666.00 c

666.00 7s24 General Atomic - San Diego 534.00 534.00 EJ15 General Atomic - San Diego 533.00 533.00 i

stb General Atomic - San Diego 734.00 734.00 U13 General Atomic - San Diego 156.00-68.00 224.00 1

1114 General Atomic - San Diego 119.00 93.00 212.00 3/22 General / tonic - San Diego 527.00 527.00 1/29 General Atomic - San Diego 618.00 618.00 l

70/2 General Atomic - San Diego.

556.00 556.00 l

10/4 General Atomic - San Diego 544.00 544.00 l

D/9 General Atomic - San Diego 637.00 637.00

?0/16 General Atomic - San Diego 604.00 604.00 t

i0/18 General Atomic - San Diego 626.00 626.00 t

10/27 General Atomic - San Diego 393.00 393.00 40/30 General Atomic - San Diego 560.00 560.00 i

11/3 General Atomic - San Diego 543.00 543.00 11/17 General Atomic - San Diego 800.00 800.00 11/20 General Atomic - San Diego 109.00 109.00 218.00 11/21 General Atomic - San Diego 109.00 109.00 218.00 11/22 General Atomic - San Diego 108.00 100.00 216.00 12/8 General Atomic - San Diego 537.00 537.00 4,}l;h p

4 I

- m.-

m_

/

./'

y

- [

DATE OF ENRICHE0 URANIUM PLUTONIUM' Pu-238 U-233 TOTAL AN0UNT OF idASTE

- p SHIPMENT FROM (arams)

(grams)'

'(gress)

(grams)'

'(arams)-

12/11 General Atomic - San Diego 170.00 60.00 230.00 l'

12/12 General Atomic - San Diego 107.00 107.00 214.00 l

j 12/13 General Atomic - San Diego 253.00 253.00 i

12/27 General Atomic - San Diego 645.00 645.00 f

2/10 General Electric - San Jose 2.00 2.00 F

6/28 General Electric - San Jose 2,094.00 2,094.00 i-7/7 General Electric - San Jose 108.00 108.00 1:

7/12 General Electric - San Jose 125.00

'125.00

{

69,063.60 shipped in 1972 3973 6/15 Lovelace Research Institute 9/6 Lovelace Research Institute

.10

.10 11/30 Lovelace Research Institute

.20

.20 3/28 Rockwell International 32.00 32.00 4/4 Rockwell International 18.00 18.00 4/19 Rockwell International 116.00 64.00 180.00 6/1 Rockwell International 771.00 771.00 6/4 Rockwell International i

6/8 Rockwell International 290.00 290.00 6/20 Rockwell International 98.00 98.00 6/29 Rockwell International 52.00 52.00 i

1/31 General Electric - Va!'secitos 22.00 6.00 28.00 t --

3/1 General Electric - Vallecitos 22.00 1.00 23.00 3/31 General Electric - Vallecitos 5.00 10.00 15.00 4/30 General Electric - Vallecitos 14.00 14.00 6/14 General Electric - Vallecitos 4.00 9.00 13.00 7/3 General Electric - Vallecitos 667.00 667.00 7/18 General Electric - Vallecitos 4.00 1.00 5.00 i.

7/25 General Electric - Vallecitos 24.00 3.00 27.00' 8/31 General Electric - Vallecitos 38.00 38.00 j,

11/1 General Electric - Vallecitos 20.00 13.00 33.00 11/9 General Electric - Vallecitos i

6/4 Lawrence Livermore National Lab 111.00 111.00 1/4 Genc71 Electric - Vallecitos 594.00 594.00 1/22 General Electric - Vallecitos 45.00 10.00 55.00 l

1/13 General Electric - Vallecitos 37.00 37.00 8

  • i O

I

o DATE OF ENRICHED URANIUM PLUT0 NIM Pu-238 U-233 TOTAL AMOUNT OF WASTE SHIPMENT FROM

- (grams)

(grams)

(grams)

{ grams)

(grams) 2/1 General Electric - Vallecitos 1,865.00 1,865.00 3/1 General Electric - Vallecitos 2,458.00 9.00 2,467.00 3/7 General Electric - Vallecitos 1.00 1.00 3/20 General Electric - Vallecitos 456.00 456.00 3/29 General Electric - Vallecitos 258.00 4.00 262.00 4/11 General Electric - Vallecitos 1,938.00 1,938.00 4/18 General Electric - Vallecitos 16.00 4.00 20.00 4/30 General Electric - Vallecitos 1,586.00 1,586,00 5/9 General Electric - Vallecitos 6,889.00 31.00 6,920.00 5/16 General Electric - Vallecitos 2,126.00 2.126.00 6/14 General Electric - Vallecitos 23.00 23.00 6/14 General Electric - Vallecitos 859.00 13.00 872.00 7/3 General Electric - Vallecitos 1,256.00 3.00 1,259.00 7/12 General Electric - Vallecitos 3.464.00

"!.*Y' 3,464.00 7/18 General Electric - Vallecitos 19.00 53.00 72.00 7/23 General Electric - Vallecites 1.188.00 8.00 1.196.00 7/25 General ciectric - Vallecitos 74.00 9.00 83.00 8/2 General Electric - Vallecitos 1,731.00 1,731.00 j

8/8 A*neral Electric - Vallecitos 18.00 18.00 l

8/31 vral Liectric - Vallecitos 2,396.00 2,396.00 a

9/18 General Electric - Vallecitos 19.00 19.00 9/18 General Electric - Vallecitos 285.00 285.00 10/1 General Electric - Vallecitos 14.00

- 5,427.C0 14.00 10/10 General Electric - Vallecitos 5.419.00 8.00 11/1 General Electric - Vallecitos 11/9 General Electric - Vallecitos ~

7.339.00 76.00 7.415.00 308.00 15.00

- 323.00 12/10 Geiar=1 Electric - Vallecitos 16.00 16.00 12/21 General Electric - Vallecitos 29.00 29.00 8/30 General Electric - Vallecitos 11.328.00 16.00 11.344.00 i

6/29 Rockwell International-Canoga Park 7.00 7.00 l

1/5 General Atomic - San Otego 554.00 544.00 1/9 General Atomic - San Diego 535.00 535.00 1/26 General Atomic - San Diego 537.00 537.00 o

1 1/29 General Atomic - San Diego 538.00 i0 538.00 2/20 General Atomic - San Diego' 531.00 531.00 2/27 General Atomic - San Diego 694.00 694.00 l

3/2 General Atomic - San.Diego 514.00 514.00 1

3/12 General Atomic - San Diego 542.00 542.00 3/26 General-Atomic - San Diego 528.00 528.00

(

, _,3' ?

,.y i

I

.._.an

.n.M mcw,,u a.

9

- g DATE OF ENRICHED URANIUM PLUT0NIUM Pu-238 U-233 TOTAL AMOUNT OF WASTE SHIPMENT FROM (arams)

(grams)'

'(grams)'

'(grams) forams)'

l 3/28 General Atomic - San Diego 539.00 539.00 4/23 General Atomic - San Diego 540.'JO 540.00 I

4/26 General Atomic - San Diego 107.0u 107.00 214.00

?

4/25 General Atomic - San Diego 541.00 541.00

)

4/26 General Atomic - San Diego 108.00 108.00 215.00 1

5/7 General Atomic - San Diego 543.00 543.00 0

5/23 General Atomic - San Diego 542.00 542.00 3

5/29 General Atcnic - San Diego 532.00 532.00 j

6/11 General Atomic - San Diego-531.00 531.00 6/27 General Atomic - San Diego 2,779,00 2,779.00 7/10 General Atomic - San Diego 537.00 537.00 8/l General Atomic - San Diego 561.00 561.00

[

8/14 General Atomic - San Diego 95.00 95.00 8/16 General Atomic - San Diego 95.00 95.00 8/31 General Atomic - San Diego 536.00 536.00 9/5 General Atomic - San Diego 637.00 12.00 649.00 3

9/10 General Atomic - San Diego 536.00 536.00 10/8 General Atomic - San Diego 611.00 611.00 10/19 General Atomic - San Diego 532.00 532.00 11/7 General Atomic - Sin Diego 541.00 541.00 12/17 General Atomic - San Diego 591.00 591.00 3/14 General Atomic - San Diego 22.00 22.00 10/23 General Atomic - San Diego 6,621.00 6,621.00 80,602.30 shipped in 1973 1974 3/1 Lovelace Research Institute 7/1 Lovelace Research Institute' I

7/19 Lovelace Research Institute l

11/1 Lovelace Research Institute 1.60 1.60 1/17 Battelle - Columbus 20.00 20.00 r

12/17 Westinghouse - Cheswick 7.00 7.00 12/17 Westinghouse - Cheswick 119.00 79.00 198.00 8/6 Kerr McGee - Oklahoma 2.00 2.00 l

8/20 Kerr McGee - Oklahoma 1.00 1.00 l

6/19 Rockwell International - San Susana 1.00 1.00 147.00 6/19 Rockwell International 4 Canoga Park 147.00 2

y I

8/16 Rockwell International - Canoga Park 67.00

? ' 67.00 8/26 Rockwell International - Canoga Park 27.00 9 QF 27.00 i

lu '

l

. TOTAL AMOUNT OF WASTE DATE OF ENRICHED URANIUM PLUTON!lM Pu-238 U-233 (orams) j-SHIPMENT FROM (arams)

(grams)

(grams)

(grams) 1/11 General Electric - Vallecitos 23.00 23.00 i

1/24 General Electric - Vallecitos 17.00 17.00

' ['

2/13 General Electric - Vallecitos 15.00 15.00 3/1 General Electric -- Vallecitos 16.00 16.00 3/18 General Electric - Vallec nos 15.00 15.00 L

4/3 General Electric - Vallecitos 22.00 22.00 l

4/23 General Electric - Vallecitos 162.00 11.00 173.00 e

4/26 General Electric - Vallecitos 56.00' 13.00 69.00 1

4/29 General Electric - Vallecttos 43.00 22.00 65.00 l:

5/21 Gener&1 Electric 'Vallecitos 36.00 12.00 48.00 i --

5/29 General Electric - Vallecitos 395.00 395.00 6/5 General Electric - Vallecitos 123.00 9.00 132.00 7/3 General Electric - Vallecitos 83.00 42.00 125.00 t-9/11 General Electric - Vallecitos 80.00 35.00 115.00 10/23 General Electric - Vallecitos 109.00 36.00 145.00 l

12/13 General Electric 'Vallecttos 3.00 18.00 21.00 11/21 General Electric - Vallecitos 7.00 7.00 3/29 General Electric - San Jose 8/6 Westinghouse - Cheswick 128.00 128.00 8/6 Westinghouse - Chesnick 53.00 53.00 11/7 Westinghouse - Chesnick 77.00 77.00 l

11/7 Westinghouse - Chesnick 343.00 77.00 420.00 l-12/5 Westinghouse - Chesnick 157.00 157.00

)-

12/17 Westinghouse - Chesnick 1.00 1.00 k

12/17 Westinghouse - Chesnick 138.00 138.00 I

12/17 Westinghouse - Chesnick 3.00 3.00 12/17 Westin9 house - Chesnick 234.00 234.00

}

1/11 General Electric - Vallecitos 2,166.00 1.00

.2,167.00

}.

1/24 General Electric - Vallecitos 6,103.00 29.00 6,132.00 2/13 General Electric - Vallecitos 5,405.00 5,405.00 J

3/1 General Electric - Vallecitos 12,294.00 1.00 12,295.00 3/8 General Electric - Vallecitos 1,055.00 1.055.00 1'

4/3 General Electric - Vallecitos 1,804.00 1,804.00 4/12 General Electric - Vallecitos 2,619.00 2.619.00 2,170.00 e

4/23 General Electric - Vallecitos 2,170.00 4/26 General Electric - Vallecitos 1,040.00 1,040.00 l

4/29 General Electric - Vailecitos 209.00 2.00 211.00 4/3 General Electric - Vallecitos 1.00 s

ti < f y 1.00 l

.4 l

t t

II

-i OATE OF

~ ENRIQiE0 URANIUM PLUT0NitM Pu-235 U-233 TGTAL AMOUNT OF WASTE 5

SHIPMENT FROM (1 rams)

(orams)

(orams)

(grams)

(grams) l 5/3 General Electric - Vallecitos 68.00 68.00 g

5/21 General Electric - Vallecitos 3,783.00 2.00 3,785.00

[

5/29 General Electric - Vallecitos 2.00 2.00 6/5 General Electric - Vallecitos 2,675.00 3.00 2.678.00 k

6/'O General Electric - Vallecitos 1,098.00 1,098.00 t

7/3 General Electric - Vallecitos 722.00 11.00 733.00 1/22 General Electric - Vallecitos 1,824.00 1,824.00 7/29 Ceneral Electric - Vallecitos 436.00 436.00 1

8/2 General Electric - Vallecitos 2,080.00 2,080.00 l

8/16 General Electric - Vallecitos 29.00 38.00

{

8/21 General Electric - Vallecitos 3,372.00 10.00 3,382.00 9/11 General Electric - Vallecitos 85.00 43.00 123.00

}

9/20 General Electric - Vallecitos 2,916.00 2.00 2.918.00 i

10/14 General Electric - Vallecitos 2,95?.00 27.00 2,979.00

[

10/17 General Electric - Vallecitos 2,672,00 2,672.00 10/21 General Electric - Vallecitos 2,310.00 39.00 2,349.00 f

10/23 General Electric - Vallecitos 9.00 9.00 10/25 General Electric - Vallecitos 399.00 399.00 L

10/30 General Electric - Vallecitos 3.640.00 3,640.00 I-11/4 General Electric - Vallecitos 3,368.00 16.00 3,384.00 11/21 General Electric - Vallecitos 2,626.00 2,626.00 12/4 General Electric - Vallacitos 4.088.00 19.00 4,107.00 12/9 General Electric - Vallecitos 54.00 54.00 12/11 General Electric - Vallecitos 1,237.00 5.00 1,242.001E 12/13 General Electric - Vallecitos 901.00 70.00 971.00 12/18 General Electric - Vallecitos 727.00 727.00 6/16 Kerr McGee - Oklahoma 299.00 299.00 7/2 Kerr McGee - Oklahoma 279.00 279.00

(

7/16 Kerr McGee - Oklahoma 139.00 139.00 7/23 Kerr McGee - Oklahoma 79.00 79.00 7/30 Kerr McGee - Oklahoma 266.00 266.on 8/6 Kerr McGee - Oklahoma 191.00 191.k 8/6 Kerr McGee - Oklahoma 42.00 42.00 8/20 Kerr McGee - Oklahoma 243.00 243.00 8/28 Kerr McGee - Oklahona 142.00 142.00 9/4 Kerr McGee - Oklahoma 76.00 76.00 9/10 Kerr McGee - Oklahoma 112.00 112.00 4

-bA m., m.

12 t

DATE OF ENRICHED URANIUM PLUTONIUM Pu-238 U-233 TOTAL AMOUNT OF WASTE i

SHIPMENT FROM (orams)

' (grams)

(grams)

(grams)

(grams) p

~'

I' 9/17 Kerr McGee - Oklahoma 137.00 137.00 9/17 Kerr McGee - Oklahoma 37.00 37,00 1

9/24 Kerr McGee - Oklahoma 111.00 111.00 e

10/1 Kerr McGee - Oklahoma 170.00 170.00 i

10/8 Kerr McGee - Oklahoma 170.00 170.00 E

10/29 Kerr McGee - Oklahoma 176.00 176.00 11/5 Kerr McGee - Oklahoma 250.00 250.00 11/5 Kerr McGee - Oklahoma 2,465.00

',465.00 11/13 Kerr McGee - Oklahoma 170.00 170.00 11/17 Kerr McGee - Oklahoma 69.00 69.00 11/21 Kerr McGee - Oklahoma 219.00 219.00 11/27 Kerr McGee - Oklahoma 129.00 129/00 12/18 Kerr McGee - Oklahoma 222.00 222.00 7/1 B&W - Lynchburg 297.00 297.00 7/9 B&W - Lynchburg 294.00

?

294.00 7/22 B&W - Lynchburg 145.00 145.00 7/22 B&W - Lynchburg 153.00 153.00 t

10/4 B&W - Lynchburg 300.00 300.00 1

6/12 Rockwell International - Canoga Park 407.00 36.00 443.00 4

8/16 Rockwell International - Canoga Park 392.00 392.00 6/12 Rockwell International - Canoga Park 36.00 36.00 9/25 Battelle - Columbus 739.00 2.00 741.00 9/25 Battelle - Columbus 49.00 0,950.00 J

49.00 9/25 Battelle - Columbus

.9,882.00 68.00 9/25 Battelle - Columbus 1,868;00 20.00 1,888.00 t

12/11 Battelle - Columbus 115.00

' 115.00 1/7-General Atomic - San Diego 235.00 235.00 2/11 General Atomic - San Diego 395.00 395.00 3/22 General Atomic - San Diego 775.00 775.00 i

S/6 General Atomic - San Diego 446.00 30.C0 476.00 J

6/5 General Atomic - San Diego 337.00 337.00 l

7/12 General Atomic - San Diego' 551.00 4

?l' 551.00 7/24 General Atomic - San Diego 33.00 33.00 66.00.

I 7/25 General Atomic. San Diego 33.00 33.00 i.66.00 8/5 General Atomic - San Diego 102.00 102.00 8/30 General Atomic - San Die <jo 240.00 240.00 9/23 General Atomic - San Diego 570.00

.570.00

.: t - ;,) -

t I

lJ

<l t'

f DATE OF ENRICHED URANIUM PLUTONIUM, Pu-238 U-233 TOTAL AMOUNT OF WASTE SHIPMENT FROM forams)' '

(orams)

(arams)' (arams)'

(grams) 10/8 General Atomic - San Diego 558.00 558.00 3

10/9 General Atomic - San Diego 594.00 594.00 J

10/11 General Atocic - San Diego 545.00 545.00 i

~10/29 General Atomic - San Diego 540.00 540.00 l

11/15 General Atomic - San Diego 781.00 781.00 12/3 General Atomic - San Diego 560.00 560.00

{

12/4 General Atomic - San Diego 651.00

~651.00 12/13 General Atomic - San Diego 581.00 581.00 i

12/20 General Atomic - San Diego 597.00

' 597.00 i

3/29 General Electric - San Jose

.18.00 18.00 r

5/2 LFE Corporation 167.00 167.00 5/2 LFE Corporation 40.00 40.00 11/22 LFE Corporation 2.00 2.00 5/2 EAL Corporation 291.00 291.00 113.047.60g shipped in 1974 1375 3/6 Loveiace Research Institute

.10

.10

.50

.50 6/10 Levelace Research Institute 8/27 Lovelace Research Iristitute' 8/28 Lovelace Research Institute 5/16 Battelle - Columbus 1,096.00 18.00 1,104.00 4/10 Westinghouse - Cheswick 9.00 9.00 4/10 Westinghouse - Cheswick 110.00 45.00 156.00 7/14 Westinghouse - Cheswick 72.00 9.00 81.00 8/21 Westinghouse - Cheswick 169.00 21.00 190.00 4/2 Kerr-McGee - Cimarron 4.00 4.00 4/2 Kerr-McGee - Cimarron 2.00 2.00 4/9 Kerr-McGee - Cimarron 4.00 4.00 7/28 Kerr-McGee - Cimarron 2.00 2.00 1/17 General Electric - Vallecit6s 1.00 1.00 2/18 General Electric - Vallecitos 4.00 4.00 8.00 4/1 General Electric - Vallecitos 81.00 27.00 108.00 4/23 General Electric - Vallecitos 5.00 5.00 8/12 General Electric - Vallecitos 1.00 1.00 11/19 General Electric - Vallecitos 1.00 1.00 9

q l'

I

H CAVE OF ENRICHED URANIUM PLUTONIUM Pu-238 U-233 TOTAL AMOUNT OF WASTE i

SHIPMENT FMOM (grams)

(grams)

(grams)

(grams)

(orams)

-F t

[

4/10 Westinghouse - Cheswick li7,00 117.00 4/10 Westinghouse - Cheswick 2.00 2.00 6

6/13 Westinghouse - Cheswick 278.00 278.00 1

6/13 Westinghouse - Choswick 670.00 670.00 7/i4 Westinghouse - Cheswick 84.00 84.00 8/21 Westinghouse - Cheswick 187.00 187.00 8/21 Westinghouse - Cheswick 37.00 37.00 y

1/3 General Electric - Vallecitos 2.625.00 2,625.00 f

1/17 General Electric - Vallecitos 493.00 45.00 50.00 588.00 1/21 General Electric - Vallecitos 502.00 502.00 s

3/14 General Electric - Vallecitos 40.00 40.00

{

2/26 General Electric - Vallecitos 25.00 25.00 f'

3/12 General Electric - Vallecitos 36.'00 36.00 2/18 General Electric - Vallecitos 401.00 122.00 523.00 3/20 General Electric - Vallecitos 590.00 590.00 r

4/1 General Electric - Vallecitos 563.00 95.00 658.00

.(

4/16 General Electric - Vallecitos 16.00 122.00 138.00 6

4/17 General Electric - Vallecitos 357.00 1.00 358.00 4/17 General Electric - Vallecitos 2,389.00 2,389.00 l

4/23

, General Electric - Vallecitos 13.00 258.00 271.00 4

4/21 General Electric - Vaticcitos 1,852.00 80.00 1,932.00

[

4/23 General Electric - Vallecitos 2.00 2.00

(

5/2 General Electric - Vallecitos 1,554.00 1.00 1,555.00 P

5/6 General Electric - Vallecitos 14.00 14.00

[

5/9 Ceneral Electric - Vallecitos 2.744.00 2,744.00 5/9 General Electric - Vallecitos 1,039.00

.1.039.00-5/16 Geneni Electric - Vallecitos 997.00 7.00 1,004.00 5/16 General Electric - Vallecitos 27.00 27.00 f

6/2 General Electric - Vallecitos 97.00 155.00 252.00 6/9 General Electric - Vallecitos 240.00 92.00 332.00-6/12 General Electric - Vallecitos 6.164.00 167.00 6.331.00 6/12 Ganeral Electric - Vallecitos 9.054.00 9.054.00 6/23

, General Electric - Vallecitos 9,019.00 164.00 9,183.00 139.00 i

6/17 General Electric - Vallecitos 44.00 95.00 7/15 General Electric - Vallecitos 28.00

. 28.00 i

8/7 General Electric - Vallecttos 3,857.00 3,857.00 8/12 General Electric - Vallecitos 25.00 25.00' sy x,

I

15 s.

, i tip DATE OF

'ENPICHED URANIUM PLUTONIUM Pu-238 U-233 TOTAL AMOUNT OF WAST SHIPMENT

-FROM (grams)

(grams)

(grams)

(tJrams)

(grams) 8/19 General Electric - Vallecitos 1,823.00 1,823.00 t

9/5 General Electric - Vallecitos 3,921.00 3,921.00 9/19 General Electric - Vallecitos 651.00 651.00 9/25 General Electric - Vallecitos 46.00 46.00 10/15 General Electric - Vallecitos 570.00 570.00 t

10/15 General Electric - Vallecitos 3,251.00

'3,251.00

~'-

11/19 General Electric - Vallecitos 109.00 1.00 110.00 I

11/19 General Electric - Vallecitos 1,109.00 1,109.00' 11/19 General Electric - Vallecitos 3,461.00 3,461.00 1/16 Kerr-McGee - Cimarron 286,00 286.00 1/21

.Kerr-McGee - Cimarron 285.00 285.00 i

1/27 Kerr-McGee - Cimarron 131.00 131.00

{

2/3 Kerr-McGee - Cimarron 289.00 289100 l

2/7 Kerr-McGee - Cimarron 295.00 295.00' 2/19 Kerr-McGee - Cimarron 293.00' 293.00 2/25 Kerr-M;. Gee - Cimarron 235.00 238 M 3/3 Kerr-McGee - Cimarron 162.00

.64.00

+

3/17 Kerr-McGee - Cimarron 297.00 297.00 3/21 Kerr-McGee - Cimarron 293.00 293.00 3/26 Kerr-McGee - Cimarron 297.00 297.00 4/2

. Kerr-McGee ; Cimarren 3.00 3.00 4/2 Kerr-McGee - Cimarron 284.00 284.00 F

4/9 Kerr-McGee - Cimarron 263.00 263.00 t

Kerr-Mc ee - Cimarron 27.00 27.00 i

r 4/9 4/14 Kerr-McGee - Cimarron

-243.00 243.00 4/18 Kerr-McGee - Cimarron 166.00 166.00 l

4/23 Kerr-McGee - Cimarron 154.00 154.00 f

4/25 Kerr-McGee - Cimarron 109.00 109.00 4/28 Kerr-McGee - Cimarron 166.00 166.00 4/28 Kerr-McGee - Cimarron 192.00 192.00 5/12 Kerr-McGee -.Cimarron 274.00 274.00 5/16 Kerr-McGe' - Cimarron 181.00 181.00 5/21 Kerr-McGee - Cimarron 185.00 186.00 6/2 Kerr-McGee - Cimarron 18J.00 183.00 6/2-Kerr-McGee - Cimarron 2,764.00 2,764.00 I

6/6 Kerr-McGee - Cimarron 200.00 200.00 f

h*

I s

I 1

t

. ;4 I

-- ~ ~.__ _.

4 i

i

?-

16 DATE OF ENRICHE0 URANIUM PLUTONIUM Pu-238 U-233 TOTAL AMOUNT OF WASTE i

4 SHIPMENT FROM (grams)

(grams)

(grams)

(grams)

(grams) 6/11 Kerr-McGee-Cimarron 118.00 1118.v0 6/17 Kerr-McGee-Cime ron 286,00 286.00 i

6/24 Kerr-McGee-Cimarron 220;00 220.00 i-6/24 Kerr-McGee-Cimarron 2,836.00 2.836.00 7/3 Kerr-McGee-Cimarron 299.00 299.00 7/9 Kerr-McGee-Cimarron 288.00 288.00 7/16 Kerr-McGee-Cimarron 144.00 144.00 7/16 Kerr-McGee-Cimarron 6,116.00 6,116.00

(

7/28 Kerr-McGee-Cimarron 239.00 239.00 243.00 243.00 3

8/8 Kerr-McGee-Cimarron I

8/12 Kerr-McGee-Cimarron 147.00 147.00 8/19 Kerr-McGee-Cimarron 6,692.00 6.692.00 8/19 Kerr-McGee-Cimarron 124.00 124.00 8/25 Kerr-McGee-Cimarron 158.00 158.00 8

8/25 Kerr-McGee-Cimarron 5.334.00 5,334.00 5/7 B&W - Lynchburg 151.00 151.00 i

5/7 B&W - Lynchburg 149.00 149.00

{

5/13 B&W - Lynchburg 60.00 60.00 5/13 B&W - Lynchburg 124.00 124.00

{

6/12 B&W - Lynchburg 75.00 75.00 6/27 B&W - Lynshburg 282.00 282.00 7/11

-B&W - Lynchburg 297.00 297.00 7/22 B&W - Lynchburg 273.00 273.00 8/29 B&W - Lynchburg 148.00 148.00 1/13 Battelle - Columbus 115.00

~115.00 1/17 Batt&lle - Columbus 196.00 196.00

~

1/17 Battelle - Columbus 4,572,00 49.00 4,621.00 l/17 Battelle - Columbus 162.00

-162.00 1/17 Battelle - Columbus 726.00 4.00 730.00 1/27 Battelle - Colur.ibus 127.00 127.00 f

1/27 Battelle - Columbus 51.00 51.00 i

1/27 Battelle - Columbus 126.00

'126.00 l

, W', 3.735.00 1/27 Battelle - Columbus 731.00 4.00

+

108.00 2/21 Battelle - Columbus 4,103.00 5.00 2/21 Battelle - Columbus 99.00 99.00 1.00 1.00 2/21 Battelle - Columbus 2/21 Battelle - Columbus 206.00

. 206.00 f

i j!h.372.00 1

2/21 Battelle - Columbus

.372.00

, tj M

t

4.,

l

' ~ ~ -

_.~.n..

-n 1/

o

((1 DATE OF

' ENRICHED URANIUM PLUT0NIUM Pu-238 U-233 TOTAL AMOUNT OF WASTE SHIPMENT FROM (orams)

(grams )

forams)

(grams)

(grams) 5/16 Battelle - Columbus 4.00 4.00 i

5/16 Bat 6elle - Columbus 35.00 35.00

'l 5/16 Battelle - Columbus 151.00 1.00 152.00 5/16 Battelle - Columbus 858.00 4.00 862.00 5/16 Battelle - Columbus 38.00 38.00 5/16 Battelle - Columbus 205.00 3.00

. 7,308.00 208.00 5/16 Battelle - Columbus 7,261.00 37.00 6/3 Battelle - Columbus 65.00 65.00 6/13 Batielle - Columbus 10.00

.. 10.00 j

6/13 Battelle - Columbus 1,897.00 1,897.00

'j '

1/7 General Atomic - San Diego 593.00 593.00 1/20 General Atomic - San Diego 549.00 549.00 2/6 General Atomic - San Diego 548.00 548.00 2/25 General Atom' - San Diego 569.00 569.00 3/4 General Atoritic - San Diego 764.00 764.00 3/6 General Atomic - San Diego 573.00 573.00 l

536.00 F

3/12 General Atomic - San Diego 536.00 3/19 General Atomic - San Diego 389.00 389.00 3/31 General Atomic - San Diego 140.00 140.00 t

4/2 General Atomic ' San Diego 540.00 540.00 l

4/3 General Atomic - San Diego 568.00 568.00 4/22 General Atomic - San Diego 533.00 533.00 4/28 General Atomic - San Diego 571.00 571.00

(

5/8 General Atomic - San Diego 534.00 534.00 8

5/21 General Atomic - San Diego 47.00 47.00 94.00 l

5/23 General Atomic - San Diego 47.00 47.00 94.00

[

5/28 General Atomic - San Diego 556.00 556.00 1

6/5 General Atomic - San Diego 539.00 539.00 l

6/16 General Atomic - San Diego 543.00 543.00 6/26 General Atomic - San Diego 597.00 597.00 f"

7/8 General Atomic - San Diego 398.00 398.00 7/22 General Atomic - San Diego 409.00 409.00 7/31 General Atomic - San Diego 335.00 335.00 8/4 General Atomic - San Diego 972.00 972.00 i

8/6 General Atomic - San Diego

  • 200.00 200.00 8/13 General Atomic - San Diego 333.00 333.00 h.

o I

.~

so i

~bATEOF ENRICHED URANIUM PLUTONIUM Pu-238 U-233 TOTAL' AMOUNT OF WASTE SHIPMENT FROM Jiir (grams)

.(grams)

(grams)

(grams)

(grams) 9/9

. General Atomic - San Of ego 473.00 473.00

-l-9/16 General Atomic - San Diego 337.00 337.00 9/23 General Atomic - San Diego 371.00 371.00

'j 9/25 General Atomic San Diego 390.00 390.00

.l:

9/29 General. Atomic - San Diego 374.00 374.00

[

10/7 General Atomic - San Diego 401.00 401.00 10/16 Gener&1 Atomic - San Diego 402.00 402.00 l

10/21 General Atomic - San Diego 389.00 389.00 i

i; 11/5 General Atomic - San Diego 403.00 403.00 11/10 General Atomic - San Diego 377.00 377.00 4

11/20 General Atomic - San Diego 376.00 376.00 l

12/9 General Atomic - San Diego 305.00 305.00 12/17 General Atomic - San Diego 93.00 93.00 j,

2/5 General Electric - San Jose 4,300.00 4,300.00 4/22 General Electric - San Jose 14,579.00 14,579.00 7/1 General Electric - San Jose 10,947.00

. 10,947.00 10/14 General Electric - San Jose 6,468.00

~*'--66 68.00 j

4 173,005.60yshippedin1975 557.176.10. shipped in years 1970-1975

.I

  • A quantity less than lg I

s, y, jir 4

\\

t.,

I