ML20033A387
| ML20033A387 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 11/09/1981 |
| From: | Graves R CONNECTICUT YANKEE ATOMIC POWER CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| EN-81-513, NUDOCS 8111250300 | |
| Download: ML20033A387 (1) | |
Text
-
& -.7 /.3 7TRR PDC LPoe CONNECTICUT YANKEE ATOMIC POWER COMPANY % /C HADDAM NECK PLAN'l RR
- 1. BOX 127E. EAST H AMPTON, CONN. 06424 EN-81-513 NoveEb'er 0,U1981
! "M3R Docket No. 50-21:
l Mr. Boyce H. Grier, Director Region I Office of Inspection and Enforcement U.S. Nuclear Regulatory Com:aission
/
631 Park Avenue, s
King of Prussia, Pa. 19406
Dear Mr. Grier:
{J [gg,y
Subject:
Haddam Neck Plant., Special Report 3
' "! d //fj^
- f of Steam Generator Tube Plugging 3/
6 N'
Reference:
(1) Haddam Neck Plant Technical 7 T}ih N
Specifications. Section 6.9.3.d Reference (1) requires that the number of tubes plugged in each steam generator be reported to the Commission within fifteen duys following inservice inspection of steam generator tubes.
The number of tubes plugged in each steam generator is shown below:
Number of Steam Generator tubes plugged 1
5 2
18 3
2 4
0 The detailed ninety day report will be submitted by January 29, 1982.
Very truly yours, WW Richard H. Graves Station Superintendent RHG: PWA/mb S'fi) cc: USNRC, C/0 Document Management Branch, Washington, D.C.
8111250300 811109 PDR ADOCK 05000213 G