Submits List of Number of Tubes Plugged in Steam Generator Following Inservice Insp Per Tech Spec 6.9.3.Detailed 90-day Rept Will Be Submitted by 820129
ML20033A387
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/09/1981
From: Graves R
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
EN-81-513, NUDOCS 8111250300
Download: ML20033A387 (1)


Text

-

& -.7 /.3 7TRR PDC LPoe CONNECTICUT YANKEE ATOMIC POWER COMPANY % /C HADDAM NECK PLAN'l RR

  • 1. BOX 127E. EAST H AMPTON, CONN. 06424 EN-81-513 NoveEb'er 0,U1981

! "M3R Docket No. 50-21:

l Mr. Boyce H. Grier, Director Region I Office of Inspection and Enforcement U.S. Nuclear Regulatory Com:aission

/

631 Park Avenue, s

King of Prussia, Pa. 19406

Dear Mr. Grier:

{J [gg,y

Subject:

Haddam Neck Plant., Special Report 3

' "! d //fj^

6 N'

Reference:

(1) Haddam Neck Plant Technical 7 T}ih N

Specifications. Section 6.9.3.d Reference (1) requires that the number of tubes plugged in each steam generator be reported to the Commission within fifteen duys following inservice inspection of steam generator tubes.

The number of tubes plugged in each steam generator is shown below:

Number of Steam Generator tubes plugged 1

5 2

18 3

2 4

0 The detailed ninety day report will be submitted by January 29, 1982.

Very truly yours, WW Richard H. Graves Station Superintendent RHG: PWA/mb S'fi) cc: USNRC, C/0 Document Management Branch, Washington, D.C.